Loading...
HomeMy WebLinkAbout2000-03-14 - AGENDA REPORTS - BOUQUET BRIDGE WIDENING (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR City Manager Approval: 74AL Item to be presented by: T. Brad Therrien DATE: March 14, 2000 SUBJECT: BOUQUET CANYON BRIDGE WIDENING — AWARD DESIGN CONTRACT - PROJECT NO. S1035 DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION City Council award the contract to Dokken Engineering for the engineering design services for Bouquet Canyon Road Bridge Widening, Project No. S1035, in the amount of $160,000.00 and authorize a 15 percent contingency expenditure in the amount of $24,000.00. Appropriate $147,200.00 in Highway Bridge Replacement and Rehabilitation (HBRR) Grant Funds to Account No. S1035453, and increase the estimated revenues in Account No. 453-5212 by $147,200.00. Authorize an additional $16,000.00 for staff and design review services; and authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND In September 1997, the City of Santa Clarita received approval by the HBRR program to complete the widening of the Bouquet Canyon Road bridge and various other improvements. The HBRR program has an 80 percent (federal) and 20 percent (City) reimbursement clause attached to it, and is administered by Caltrans. Caltrans has assigned grant designation code BHLS5450(007) to this project. Currently, the City has met all of the grant issues and has received approval to complete the design requirements. This project will provide the design requirements to widen the Bouquet Canyon Road bridge over the Santa Clara River from the current layout of six lanes to an ultimate configuration of eight lanes. Design improvements will include the eight -lane configuration, stamped concrete median, Class I bike lane with an under -crossing beneath the north end of the bridge, and decorative tiling associated with the vehicular barrier railings. Staff prepared a Request for Proposals (RFP) for the subject project. Included in the RFP is the requirement to design the necessary improvements for the project. The RFP was sent to firms on the City's Design Consultants List. Six firms submitted proposals (see Exhibit "B"). Based on technical qualifications and methodology for the project, staff recommends the firm of Dokken Engineering, the most qualified bidder. A'71 ��R' IR o: A. BOUQUET CANYON BRIDGE WIDENING AWARD DESIGN CONTRACT March 14, 2000 — Page 2 ALTERNATIVE ACTION Other action as determined by the City Council FISCAL IMPACT This project is funded by an HBRR grant in the amount of approximately $5 million. To date, staff has received authorization from Caltrans to expend up to $350,000.000 in HBRR funding. This request is to appropriate $147,200.00 in HBRR Grant Funds to Account No. 51035453 and increase the estimated revenues in Account No. 453-5212 by $147,200.00. HBRR Grant Funds provide 80 percent of the total funding for this project and require the City to provide a 20 percent local match. Sufficient local match funding for this project has been approved and appropriated by the Council for this project. ATTACHMENTS Exhibit "A!'— Project Location Map Exhibit "B" — List of Consultants RPN:tw councihhbmdoc EXHIBIT "A" VICINITY MAP BOUQUET CANYON ROAD OVER THE SANTA CLARA RIVER PROJECT SITE EXHIBIT "B" BOUQUET CANYON ROAD BRIDGE WIDENING PROJECT NO. 51035 LIST OF CONSULTANTS Daniel, Mann, Johnson, & Mendenhall Dokken Engineering HDR Engineering, Inc. Tetra Tech W.Koo & Associates Willdan Associates Los Angeles Rancho Cordova Orange Orange Orange City of Industry