Loading...
HomeMy WebLinkAbout2000-02-08 - AGENDA REPORTS - CIP DESIGN CONTR (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR City Manager Approval: Item to be presented by: DATE: February 8, 2000 SUBJECT: 1999-2000 VARIOUS CAPITAL IMPROVEMENT STREET PROJECTS, PROJECT NOS. T0005, M0001, C4003, AND C2001— AWARD DESIGN CONTRACT DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION City Council award the contract for engineering and surveying services for capital improvement projects to Kabbara Engineering in the amount of $65,396.00, and authorize a 15 percent contingency expenditure in the amount of $9,810.00; approve additional funds in the amount of $23,000.00 to construct Project No. C4003 to be transferred from available funds in Account No. M3004001-8001, Canyon Country Park Cribwall, to Account No. C4003001-8001; and authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND To most efficiently use available funding, these five City projects are being combined and contracted to one consultant firm for design services: Project Name • 1999-2000 New Sidewalk Construction • 1999-2000 Sidewalk Repair Program • Bouquet Canyon Road/Espuella Road - Right -Turn Pocket • San Fernando Road New Median Proiect No. Account Nos. T0005 T0005001,T0005103, T0005201,T0005455 M0001 M0001201 C4003 C4003001 C2001 C2001001 After reviewing proposals and interviewing several firms, staff determined that Kabbara Engineering is best qualified to fulfill the City's needs for this project and is recommending that the City Council award the contract to this firm. The Annual New Sidewalk project will install sidewalks at various locations throughout the City where none currently exist. n, nn. PPIDIFED AVands Item CAPITAL IMPROVEMENT PROJECTS AWARD DESIGN CONTRACT February 8, 2000 — Page 2 The Annual Sidewalk Repair project will repair existing damaged sidewalks at various locations throughout the City. Locations are selected based on citizen requests and City staff observations. This year, the work for this project will be concentrated in the Canyon Country area, generally bounded by Soledad Canyon Road to the south, Shadow Pines Boulevard to the east, Whites Canyon Road to the west, and the City limits to the north. The Bouquet Canyon Road/Espuella Drive Right -Turn Pocket project will widen approximately 100 feet of the southerly curb of Bouquet Canyon Road at Espuella Drive to its ultimate width and will provide a right -turn lane onto Espuella Drive. The New Median project on San Fernando Road will construct a new median in front of the K.I.S.S. Self Storage facility. The median will consist of curb and gutter, landscaping, and stamped concrete on the left -turn pocket. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT The total budget for these five projects is $397,669.00. The design cost for these projects is $65,396.00. Sufficient funds are available in the designated accounts, except for the construction of Bouquet Canyon Road/Espuella Drive Right -Turn Pocket, Project No. C4003. Additional funds in the amount of $23,000.00 to construct Project No. C4003 will be transferred from available funds in Account No. M3004001-8001, Canyon Country Park Cribwall, which has been cancelled, to Account No. C4003001-8001. 41VW1I:[61:Uk51D1►Y1 None. MC:tw comeMdesinaw.doe