Loading...
HomeMy WebLinkAbout2000-08-22 - AGENDA REPORTS - SIDEWALK REPAIR BIDS (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR City Manager Approva4y& Item to be presented by: T. Brad Therrien DATE: August 22, 2000 SUBJECT: FISCAL YEARS 1999-2000 AND 2000-2001 NEW SIDEWALK AND SIDEWALK REPAIR PROJECTS, BOUQUET CANYON ROAD/ ESPUELLA DRIVE RIGHT -TURN POCKET, AND 2000/2001 ACCESS RAMP PROGRAM, PROJECT NOS. T0005, M0001, T0013, M0018, C4003, AND T0008 — ADVERTISE FOR BIDS DEPARTMENT: Transportation & Engineering Services I Zo D00) 13 10 0 3J a 1) 31WA-6 9 Lei Z I City Council approve the plans and specifications, and authorize the advertising for bids for various capital improvement projects, Project Nos. T0013, T0005, M0018, M0001, C4003, and T0008; and direct the City Manager to transfer $35,000.00 from the 1999-2000 Median Modification project, Account No. C0004001 (General Fund) to the Bouquet Canyon Road/Espuella Drive Right -Turn Pocket project, Account No. C4003001 (General Fund). 1999-2000 New Sidewalk Construction 2000-2001 New Sidewalk Construction 1999-2000 Sidewalk Repair Program 2000-2001 Sidewalk Repair Program * Bouquet Canyon Road/Espuella Drive Right -Turn Pocket * 2000/2001 Access Ramp Program T0013 T0013201 T0005 T0005001,TO005103, T0005201,TO005455 M0018 M0018201 M0001 M0001201 C4003 C4003001 T0008 T0008201 The contracts for these projects are being combined to most efficiently use the available funding. The general scope of work for the sidewalk repair program is to repair damaged sidewalks in the Canyon Country and Saugus areas using all available funds. The Bouquet Canyon/Espuella Road Right -Turn Pocket will realign the curb and restripe the number four northbound lane on Bouquet Canyon Road south of Espuella Drive. The project will also relocate the eidsting catch basin, sidewalk, and traffic lights. r_- - ' APPROVEN Aganda Item: CAPITAL IMPROVEMENT PROJECTS ADVERTISE FOR BIDS August 22, 2000 — Page 2 The Access Ramp program will install approidmately 18 ramps within the City. The estimated construction cost per ramp is appro3dmately $1,200.00. This project will construct access ramps in the following intersections: • Lyons Avenue and Fourl Road • Lyons Avenue and De Wolfe Road • Lyons Avenue and Atwood Boulevard • Lyons Avenue and Vermont Drive • Lyons Ave nue and Wheeler Road • La Glorits. Circle and Avenida Dorena • La Glorita Circle and Markel Drive • Markel Drive and Denise Place • Markel Drive and Lisa Kelton Place The proposed New Sidewalk program will construct sidewalks in the following areas: • Wiley Canyon Road, south side between Avenida Cappela and Avenida Macarena • 16th Street, south side between Orchard Village Road to Avenida Ignacio • Copper Hill Drive, south side between Kenton Lane and Courtland Way • Dalbey Drive, south side between Newhall Avenue and northwest comer of the park • Powell Drive, north side from Wiley Canyon Road to Fourl Road • Powell Drive, south side from Fourl Road to De Wolfe Road • Fourl Road, west side from Powell Drive to Evans Avenue • De Wolfe Road, west side from Powell Drive to Evans Avenue • De Wolfe Road, east side from Evans Avenue to Lyons Avenue • Lyons Avenue, commercial driveway in front of Del Taco • Sierra Highway, east side from bridge to Soledad Canyon Road Other action as determined by the City Council. Available funds for these projects are $411,657.00. The estimated construction cost for these projects is $370,000.00. At this time, staff anticipates contingency funds for these collective projects in the amount of $41,657.00 or appro3dmately 11 percent. The actual projects costs and contingencies will be ascertained once all bids have been received and opened. These funds are available in the following designated accounts: CAPITAL IMPROVEMENT PROJECTS ADVERTISE FOR BIDS August 22, 2000 — Page 3 EWects Estimated C9A Account Nos, Available Funds • New Sidewalk Construction $100,000.00 T0005001, T0005103, $121,657.00 $50,000.00 M0001201 T0005201,TO005455, $99,000.00 M0018201 Gas Tax T0013201 C4003001 • Sidewalk Repair Program $170,000.00 M0001201, M0018201 $199,000.00 • Bouquet Canyon/Espuella Drive $ 80,000.00 C4003001 $66,000.00 • Access Ramp Program $ 21,600.00 T0008201 $25,000.00 Funds for this expenditure are budgeted in Fiscal Year 2000-01 as follows: Account No. T0005001 Fundin Source General Fund Amount $59,657.00 T0005201 Gas Tax $12,000.00 T0013201 Gas Tax $50,000.00 M0001201 Gas Tax $99,000.00 M0018201 Gas Tax $100,000.00 C4003001 General Fund $66,000.00 T0008201 Gas Tax $25,000.00 Based on the preliminary construction cost estimate, staff recommends that City Council transfer $35,000.00 from the 1999-2000 Median Modification project, Account No. C0004001 (General Fund), to Bouquet Canyon Road/Espuella Drive Right -Turn Pocket project, Account No. C4003001 (General Fund), to complete the job. Staff anticipates that the median modification project on Bouquet Canyon Road at Camargo Drive will not require the entire allocated budget. Project Location Map Plans and Specifications (available in City Clerles reading file) MC:tw:mmn wun61\adverti&e2001various.dw