Loading...
HomeMy WebLinkAbout2000-12-12 - AGENDA REPORTS - STORMWATER MITIGATION PLAN (2)CONSENT CALENDAR DATE: SUBJECT: DEPARTMENT: CITY OF SANTA CLARITA AGENDA REPORT City Manager Appro, December 12, 2000 Item to be presented STANDARD URBAN STORMWATER MITIGATION PLAN (SUSMP) IMPLEMENTING ORDINANCE Planning & Building Services RECOMMENDED ACTION City Council introduce and pass to second reading an ordinance entitled "An Ordinance of the City Council of the City of Santa Clarita, California, Implementing the Standard Urban Stormwater Mitigation Plan of the California Regional Water Quality Control Board for the Los Angeles Region by Amending the Santa Clarita Municipal Code to Repeal Existing Chapter 17.90 and to Add New Division 4: "Standard Urban Stormwater Mitigation Plan Chapter 17.90, "Standard Urban Stormwater Mitigation Plan Implementation" BACKGROUND March S, 2000 the Executive Officer of the California Regional Water Quality Control Board, Los Angeles Region approved and promulgated the Standard Urban Stormwater Mitigation Plan (SUSMP). The SUSMP requires each City, which is a permittee under the National Pollutant Discharge Elimination System (NPDES) permit in Los Angeles County to adopt an ordinance implementing the SUSMP. The original deadline for implementation was September S, 2000. The City Council adopted Ordinance No. 00-06 on August 29, 2000 to comply with this deadline. On October 12, 2000 the State Water Resources Control Board issued a decision to extend the deadline to January 15, 2001. Along with this extension the State Board has made revisions to the SUSMP requirements. Attached to this agenda report is a copy of the new ordinance and the redlined version of the adopted ordinance to illustrate the changes made upon review of the new SUSMP revisions by the City Attorney. The SUSMP imposes many water quality related requirements on new development and redevelopment projects. A SUSMP must be prepared and implemented for any new or remodel/redevelopment project that falls into one of the following eight categories: Single-family residence on a hillside Q� U D kende Item: ■ 100,000 square foot Commercial Developments Automotive repair shops • Retail gasoline outlets ■ Restaurants ■ Home subdivisions of ten or more dwelling units ' Parking lots 5,000 square feet or more or with 25 or more parking spaces and Potentially exposed to storm water runoff. The SUSMP addresses the following items and all applicable projects must be designed, constructed and maintained as identified in the Plan: I. Peak Stormwater Runoff' Discharge Rates: Peak rate of discharge of stormwater from the site can not result in downstream erosion. 2. Conserve Natural Areas: Subdivisions must cluster development, limit clearing and grading and preserve riparian and wetland areas. 3. Minimize Stormwater Pollutants of Concern: Site must be designed to minimize the introduction of pollutants of concern to the stormwater conveyance system. 4. Protect Slopes and Channels: Decrease the potential of slopes and/or channels from eroding and impacting stormwater runoff. 5. Provide Storm Drain System Stenciling and Signage: A notice that dumping in storm drains and catch basins is illegal must be placed within the project area. 6. Properly Design Outdoor Material Storage Areas: Where outdoor storage of materials is proposed, the area must be designed to eliminate runoff of pollutants. 7. Properly Design Trash Storage Areas: Trash storage areas must be isolated from contact with stormwater and surrounded by a barrier to keep the trash within the storage area. 8. Provide Proof of Ongoing BMP Maintenance: The property owner must enter into a binding agreement to properly maintain pollution control facilities and devices into perpetuity.. Agreements must travel with the land and therefore will be binding on any new owner. 9. Design Standards for Best Management Practices: All water quality facilities must be adequate to protect the project and adjacent areas from flooding and to treat 0.75 inches of each rain event. 10. Properly Design Loading/ Unloading Dock Areas: These areas must be designed to eliminate contact with and discharging of stormwater. 11. Properly Design Vehicle /Equipment Wash Areas: These areas must be designed to eliminate contact with and discharging of stormwater. 12. Properly Design Restaurant Equipment/Accessory Wash Areas: These areas must be designed to eliminate contact with and discharging of stormwater. 13. Properly Design Fueling Areas: All fuel dispensing areas must be covered, paved with concrete, and divert stormwater away from dispensing area. 14. Parking Lots: Must be designed to limit impervious area and minimize the offsite transport of pollutants. The City is required to impose these requirements pursuant to State and Federal law. This ordinance and new development procedures established at the staff level will bring the City into compliance with these laws and regulations. ALTERNATIVE ACTIONS No alternatives have been identified because state and federal laws require the City to take this action. MC—AL The implementation of these regulatory requirements will increase the cost to the City and property owners for plan review services, permitting and inspection. The costs incurred by the City are eligible for reimbursement through developer fees. These and other development related NPDES Permit compliance costs have been included in the recently revised fee study. MIT--- CHMENTS New Ordinance Redline version of Ordinance No. 00-06 TLL: S:\PSS\ENVSEVCS\NPDES2\SUSMP\ry pamda item2.DOC PUBLIC NOTICE NOTICE IS HEREBY GIVEN that on December 12, 2000, the City Council of the City of Santa Clarita introduced an Ordinance entitled: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA, CALIFORNIA, IMPLEMENTING THE STANDARD URBAN STORMWATER MITIGATION PLAN OF THE CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD FOR THE LOS ANGELES REGION BY AMENDING THE SANTA CLARITA MUNICIPAL CODE TO REPEAL EXISTING CHAPTER 17.90 AND TO ADD NEW DIVISION 4: "STANDARD URBAN STRORMWATER MITIGATION PLAN", CHAPTER 17.90, "STANDARD URBAN STORMWATER MITIGATION PLAN IMPLEMENTATION". A certified copy of the complete text of the ordinance is posted and may be read in the City Clerk's Office, 23920 Valencia Boulevard, Suite 301, Santa Clarita, and/or a copy may be obtained from that office. Dated this 14' day of December, 2000 Sharon L. Dawson, CMC, City Clerk City of Santa Clarita STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) CITY OF SANTA CLARITA ) Sharon L. Dawson, being first duly sworn, deposes and says that she is the duly appointed and qualified City Clerk of the City of Santa Clarita and that by Thursday, December 14, 2000, she caused a certified copy of the subject ordinance to be posted and made available for public review in the City Clerk's office and a copy of the ordinance summary to be published as required by law. Sharon L. Dawson, CMC, City Clerk City of Santa Clarita