HomeMy WebLinkAbout2000-08-22 - AGENDA REPORTS - TM 53130-01 APPROV BRIDGEPORT (2)CITY OF SANTA CLARITA
AGENDAREPORT
CONSENT CALENDAR City Manager Approvali,
Item to be presented by: T. Brad Therrien
DATE: August 22, 2000
SUBJECT: TRACT MAP NO. 53130-01 (BRIDGEPORT, D. R. HORTON
LOS ANGELES HOLDING COMPANY, INC.) — APPROVAL OF THE
FINAL MAP AND ACCEPTANCE OF OFFERS OF DEDICATION
DEPARTMENT: Transportation & Engineering Services
City Council approve Tract Map No. 53130-01 (Bridgeport, D. R. Horton Los Angeles
Holding Company, Inc.); accept on behalf of the public the offers of dedication easements for
sanitary sewer purposes; make findings as follows: (a) that this project is consistent with
the provisions of Sections 66474, 66474.1, and 66474.6 of the Subdivision Map Act and
should be approved, and (b) that this proposed subdivision, together with the provisions for
this design and improvement, is consistent with the General Plan required by Article 5
(commencing with Section 65300) of Chapter 3 of Division I of the Government Code, or
any specific plan adopted pursuant to Article 8 (commencing with Section 65450) of
Chapter 3 of Division 1 of the Government Code; instruct the City Treasurer to endorse the
Special Assessment Certificate on the face of the map for Tract Map No. 53130-01, which
indicates that all special assessments levied by the City have been paid; and instruct the
City Clerk to endorse the Certificate on the face of Tract Map No. 53130-01, which
embodies the approval of said map and the acceptance of the dedications shown thereon.
Tract No. 53130-01 is the first of two phases of Tentative Tract No. 53130. Tentative Tract
No. 53130 was granted approval administratively by the Director of Planning & Building
Services on November 2, 1999. The tentative tract is a subsequent tract of Tract
No. 51931-02 approved by City Council on May 25, 1999, and Tentative Tract Map
No. 51931 approved by City Council on December 18, 1997. This tract consists of
approximately 4.6 acres, located west of Parkwood Lane and south of Newhall Ranch Road,
north of Bridgeport Lane, and is owned by D. R. Horton Los Angeles Holding Company,
Inc., a California Corporation. The 12 -lot development consists of 63 residential
condominium units being constructed on six lots with six private street lots. The conditions
set by the Planning Commission have been met, and fees have been paid as indicated on the
attached Fact Sheet. The map has been checked to the satisfaction of the City Engineer.
The map is ready for City Council approval and acceptance of the dedications.
Pr-% OWED Agenda Item: /0
TRACT MAP NO. 53130-01 — APPROVAL OF THE FINAL MAP
AND ACCEPTANCE OF OFFERS OF DEDICATION
August 22, 2000 — Page 2
ALTERNATIVE ACTION
No alternative actions that would conform to requirements set forth in the Subdivision Map
Act are identified by staff.
All subdivision streets will be privately owned and maintained.
The developer is contributing the following amounts for the purposes described (refer to the
attached Fact Sheet for details):
Bridge and Thoroughfare Fees:
Transit Mitigation Fee:
Quimby Requirement:
Fact Sheet
Vicinity Map
HC:Ikl
�dl\W130-01dw
$500,069.00
$6,300.00
Parkland Dedication
FACTSHEET
Tract Map Location: West of Parkwood Lane and south of Newhall Ranch Road and
north of Bridgeport Lane.
Acreage: Approximately 4.6 acres.
Number of Lots: Twelve.
Number of Units: Sixty-three.
Developer: D. R. Horton Los Angeles Holding Company, Inc., a California
Corporation.
Quimby Fees: Per the Development Agreement with Newhall Land and Farming
Company, the Quimby Fee requirements will be fully satisfied by
the dedication of a 12.4 -acre and a 2.7 -acre park site, along with
the conveyance of approximately 296 acres of the Santa Clara
River with Tract Map No. 51931-02 and a two -acre park site to be
dedicated by a future phase.
Road Fees: Required Bridge and Thoroughfare Fees of $500,069.00 will be
paid at the issuance of the building permits per the
Development Agreement, subject to an increase annually in
accordance with the Consumer Price Index.
Transit Fees: The required Transit Mitigation Fee of $6,300.00 has been paid in
accordance with the Development Agreement.
Road Improvements: All streets within the subdivision will be privately owned and
maintained.
School Fees: To be paid at building permit stage per agreement with the school
districts.
HC:Ikl
�dl\5313"Ldoc
N E W
A L L R A N
two
W4
>
� fA
W 3
0 30 60 1 0 240
GRAPHIC SCALE
SCALE: 1"= 120'
uxt 0
Z
Lor
LOr J2/
SO