Loading...
HomeMy WebLinkAbout2000-01-11 - AGENDA REPORTS - VIA PRINCESSA EXT AWARD CONTR (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR DATE: January 11, 2000 City Manager Approval: Item to be presented by: SUBJECT: VIA PRINCESSA EXTENSION — CLAIBOURNE LANE TO THE PROPOSED MAGIC MOUNTAIN PARKWAY AND VIA PRINCESSA INTERCHANGE CONNECTOR RAMPS TO SAN FERNANDO ROAD — AWARD CONTRACT FOR ALIGNMENT STUDY, ENVIRONMENTAL DOCUMENT, AND PROJECT STUDY REPORT DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION City Council authorize the City Manager to execute the contract with Daniel, Mann, Johnson, & Mendenhall (DMJM) for engineering services for the Via Princessa Extension (San Fernando Road to the proposed Magic Mountain Parkway in "Porta Bella") in an amount not to exceed $247,385, plus a $50,000 contingency expenditure. BACKGROUND As part of the October 8, 1994 Community Strategic Plan, the community identified the "lack of adequate roadways throughout the valley" as a major concern. The focus was centered on east/west circulation. In keeping with the City's commitment to the Strategic Plan, the City Council appropriated $350,000 of General Funds for this project. This project includes preparation of a Project Study Report (PSR) for the connector ramps of the Via Princessa bridge over San Fernando Road, an alignment study, and an environmental document for the extension of Via Princessa from Claibourne Lane to the proposed Magic Mountain Parkway at the "Porta Bella" site. Staff solicited design proposals from more than 20 firms. Six firms submitted written proposals to the City. Staff evaluated all proposals and interviewed the firms listed in Attachment "B" in accordance with the requirements in the solicitation (RFP). Staff determined that DMJM would best fulfill the City's needs for the project. Therefore, staff recommends awarding the contract to DMJM. � �y ff �, �!�'"✓�/ �+H� RAM: d VIA PRINCESSA EXTENSION — AWARD CONTRACT FOR ALIGNMENT STUDY, ENVIRONMENTAL DOCUMENT, AND PROJECT STUDY REPORT January 11, 2000 — Page 2 ALTERNATIVE ACTIONS 1. Postpone or cancel the project. This action will delay the construction of the needed circulation link. 2. Other action as determined by the City Council. FISCAL IMPACT Sufficient funds for this project are budgeted in Project Account No. 53004. ATTACHMENTS Exhibit "A" — Vicinity Map Exhibit `B" — Consultant List RM:dis council\ viapawrd.doc f+ W c � y c R ria CQC Sand Cant 1� vN My , IN 00 �y°n a � c rg Rd ''•a O Via` 3 � �� x ;•`x W d c» 1 4g ? P41 � e '<.• N .Y Golden Va le`)vi� i�ms � RR `ta A �• to I w o• s � m ( i W � a T \ a` m 3 m e o c g z '> m > E a E 0 LL cu LL oc>c a o � w oin dlea a U. am z " r me v m LL " r I X1.4: I I *.10 1fii : VIA PRINCESSA EXTENSION ALIGNMENT STUDY, ENVIRONMENTAL DOCUMENT, AND PROJECT STUDY REPORT CONSULTANT LIST CONSULTANT LOCATION Daniel, Mann, Johnson, & Mendenhall (DMJM) Los Angeles, CA HDR Engineering, Inc. Orange, CA ASL Consulting Engineers Pasadena, CA Dokken Engineering San Diego, CA council \ viapawrd. doe