HomeMy WebLinkAbout2001-01-09 - AGENDA REPORTS - AWARD CONTR PEDESTRIAN ACCESS (2)CONSENT CALENDAR CITY OF SANTA CLARITA AGENDA REPORT City Manager Approval: Item to be presented by:/T. bradTherrien DATE: January 9, 2001 SUBJECT: PEDESTRIAN ACCESS IMPROVEMENTS TO BUS STOPS PHASE II, PROJECT NO. TOO14, STPLER 5450-017 — AWARD CONTRACT FOR DESIGN SERVICES DEPARTMENT: Transportation & Engineering Services ILECOMMENDED ACTION City Council award the design services contract for the Pedestrian Access Improvements to Bus Stops — Phase II, Project No. TOO 14, STPLER 5450-017, to Albert Grover & Associates in an amount not to exceed $67,134.00 and authorize a 10 percent contingency expenditure in the amount of $7,000.00; and authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND As a request for federal assistance in 1997, a project application was submitted to the Metropolitan Transportation Authority (MTA) for traffic improvement funding as a goal to increase pedestrian safety and access to transit stops in the City. The application consists of installing five pedestrian -actuated traffic signals where no traffic control currently exists, and installing missing sidewalk links at approximately 15 bus stops. The design portion for Phase I of the project is complete and ready for bids. Currently, the City is anticipating a letter of authorization from Caltrans to proceed with construction. During the bidding process, City staff will make every effort to draw the participation from local contractors through local newspaper advertisements, the Chamber of Commerce, and other mass media. The work consists of three traffic signal improvements along Soledad Canyon Road at the intersections of Oak Spring Canyon Road, Flower Park Drive, and Poppy Meadow Street. The construction for Phase I should commence in May 2001 due to traffic signal equipment procurement, which normally takes approximately 18 weeks. This item is for the selection of a design consultant for Phase II to complete all remaining design elements for the project. This project encompasses features that were identified for improvement as outlined in the project application submitted to the MTA. The items identified include the installation of two remaining traffic signals as well as an interconnect system from Sand Canyon Road to Shadow Pines Boulevard, and all missing sidewalk links at approximately 15 bus stops. The design portion of Phase II will be completed by June 2001. Construction for Phase II will commence by September 2001. - N Pon P 01 , 00 Item /0 PEDESTRIAN ACCESS TO BUS STOPS — PHASE II AWARD CONTRACT FOR DESIGN SERVICES January 9, 2001 — Page 2 Staff mailed a Request for Proposals (RFP) to 22 qualified design firms. Seven firms submitted written design proposals to the City. Staff evaluated all proposals in accordance with the requirements in the RFP. From these seven firms, staff interviewed the top three design firms (see Exhibit "A7). Staff determined that Albert Grover & Associates would best fulfill the Citys needs for the project. Therefore, staff recommends awarding the contract to Albert Grover & Associates. ALTERNA—TIVE ACTION Other action as determined by the City Council. FISCAL IMPAC Sufficient funds have been budgeted in Account Nos. T0014452 ($70,000.00) and T0014201 ($30,000.00) for Fiscal Year 2000/01. ATTACHMENTS Exhibit "A" — Consultant List Exhibit "B" — Proposed Locations for Improvements Exhibit "C" — Vicinity Map JKT:tw co=61\T0014�awddesignph1doc EXHIBIT"A" PEDESTRIAN ACCESS RdPROVEMENTS TO BUS STOPS — PHASE H DESIGN SERVICES PROJECT NO. T0014o STPLER 5450-017 CONSULTANT LIST NAMIE COMPANY CITY Mr. Mark Miller, P.E. Albert Grover and Associates Fullerton, CA Mr. Juan Diaz, P.E. Tetra Tech ASL Pasadena, CA Ms. Leah Kabbara, P.E. Kabbara Engineering Orange, CA JKT:tw m�cil\T0014—awddesignphUoc PEDESTRIAN ACCESS EUPROVEKENTS TO BUS STOPS — PHASE H DESIGN SERVICES PROJECT NO. T0014p STPLER 5450-017 PROPOSED LOCATIONS FOR DEPROVEKENTS SIDEWALK IMPROVEMENTS: 1. Rye Canyon and Avenue Stanford 2. Rye Canyon and Avenue Scott 3. Avenue Scott and Avenue Stanford 4. McBean Parkway (northbound) and Magic Mountain Parkway 5. Lyons Avenue (west) and Avenida Entrada 6. Lyons Avenue (west) and Peachland Avenue 7. Orchard Village Road and Mill Valley Road (south) 8. Orchard Village Road and Mill Valley Road (north) 9. Orchard Village Road and Avenida Ronada (south) 10. Orchard Village Road and Avenida Ronada (north) 11. Sierra Highway (south) and San Fernando Road (west) 12. Sierra Highway (north) and Placerita Canyon Road 13. Sierra Highway (north) and Rainbow Glen Drive TRAFFIC SIGNAL INSTALLATIONS: 14, Soledad Canyon Road and Rue Entr6e 15. Soledad Canyon Road and Canyon Country Park *Number of each specific location is indicated on the "VICINITY MAP — EXHIBIT C" JKT:tw COMCMT0014�awddesignphldoe