Loading...
HomeMy WebLinkAbout2001-09-25 - AGENDA REPORTS - CURB GUTTER SIDEWALK IMPROV (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR DATE: September 25, 2001 City Manager Item to be presented by: Robert G. Newman SUBJECT: FISCAL YEAR 2001-2002 REMOVAL AND REPLACEMENT OF SIDEWALK, CURB AND GUTTER, AND ACCESS RAMP — PROJECT NOS. M0021, M0023, AND T0015; CONCRETE SIDEWALK IMPROVEMENTS FOR PEDESTRIAN ACCESS TO BUS STOPS — PROJECT NO. T0014 - ADVERTISE FOR BIDS DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION City Council approve the plans and specifications, and authorize the advertising for bids for various capital improvement projects, Project Nos. M0021, M0023, T0014, and T0015. BACKGROUND The contracts for these projects are being combined to most efficiently use the available funding. The general scope of work for the combined projects is to remove and replace damaged sidewalk, curb and gutter, and access ramp improvements. This project is an annual concrete rehabilitation program aimed at repairing existing damaged concrete pads due to separations caused by both vertical and horizontal displacement, and concrete uplifting due to tree root infiltration. The sidewalk repair program is intended to fix damaged sidewalks in the Canyon Country and Saugus areas using all available funds. The access ramp program will add new ramps and will remove and replace existing access ramps that do not meet the Americans with Disabilities Act (ADA) Title 21 requirements. The pedestrian access to bus stops improvements, Phase II (T0014), is included as part of the annual concrete rehabilitation program. This program will install new concrete sidewalk pads or remove and replace existing damaged sidewalks that connect to bus stops at various locations in the City. ALTERNATIVE ACTION Other action as determined by the City Council. Agenda Item: Ilk PROJECT NOS. M0021, M0023, T0014, AND T0015 — ADVERTISE FOR BIDS September 25, 2001— Page 2 FISCAL IMPACT Available funds for these projects total $330,000.00. The estimated construction cost for these projects is $300,000.00. At this time, staff anticipates contingency funds for these collective projects in the amount of $30,000.00, or approximately 10 percent. The actual projects' costs and contingencies will be ascertained once all bids have been received and opened. These funds are available in the following designated accounts: ATTACHMENT Plans and Specifications (available in City Clerk's reading file) JKT:IkI co cil\adve ise0102meaet heb.dw Estimated Available Proiects Cost Account Nos. Funds Sidewalk Repair Program $ 90,000.00 M0023201 $100,000.00 Stormwater Flowline $138,000.00 M0031456 $150,000.00 Access Ramp Construction $ 18,000.00 T0015201 $ 20,000.00 Pedestrian Access to Bus Stops $ 54.000.00 T0014001, T0014205 $ 60.000.00 T0014452,T0014801 Total Amount: $300,000.00 $330,000.00 ATTACHMENT Plans and Specifications (available in City Clerk's reading file) JKT:IkI co cil\adve ise0102meaet heb.dw