Loading...
HomeMy WebLinkAbout2001-02-27 - AGENDA REPORTS - GVR DESIGN (2)CONSENT CALENDAR DATE: SUBJECT: DEPARTMENT: CITY OF SANTA CLAR.ITA AGENDA REPORT February 27, 2001 City Manager Approval. Item to be presented by: T. Brad The n GOLDEN VALLEY ROAD INTERIM IMPROVEMENTS, PROJECT NO. C3002 — AWARD DESIGN CONTRACT Transportation & Engineering Services City Council award the contract with STV Incorporated to include the engineering design services for Golden Valley Road Interim Improvements, Project No. C3002, in the amount of $187,260.00 and authorize a lb percent contingency expenditure in the amount of $28,089.00; and authorize the City Manager or designee to execute all documents, subject to City Attorney approval. This project will widen the intersections by adding traffic lanes, and installing curb, gutter, and sidewalk to the intersections of Ruether Avenue, Golden Oak, and Rainbow Glen Drive at Soledad Canyon Road and Golden Triangle Road, The City proposes to widen these strategic intersections at existing "at grade" railroad crossings to mitigate traffic flow in anticipation of the Santa Clarita Business Park development and Golden Valley Road, The intent is to construct additional lanes of traffic to increase the level of service to these areas. The proposed improvements will enhance Pedestrian safety, improve traffic conditions, and bring the level of service to an acceptable level in the area. Staff prepared a Request for Proposals (RFP) for the project. Included in the RFP is the improvements for the project. The RFP was sent to firms on the City's requirement to conduct a Feasibility Study Report and to design the necessary Design Co List. Three firms submitted proposals (see Exhibit "B"). Based on technics nsultants and methodology for the project, staff recommended the firm of STV Incorporated, the most l qualifications qualified bidder. STV Incorporated conducted the Feasibility Study Report, which was submitted on January 31, 2001. ALTERNATIVE ACTION Other action as determined by the City Council. APPROWED Agenda Item:_JT GOLDEN VALLEY ROAD INTERIM IMPROVEMENTS AWARD DESIGN CONTRACT February 27, 2001— Page 2 FISCAL MPACT This project is funded by Gas Tax in the amount of $200,000.00 and the Soledad Interim District No. 92-4 in the amount of $70,000.00, for a total amount of $270,000.00. Sufficient funds have been budgeted in Fiscal Year 2000-2001 in Account Nos. C3002201 and C3002355 to cover only the cost of the design of the improvements will be proposed in the Five -Year Capital Improvement Plan. project. Construction of the ATTAC---HmELqTS Exhibit "A" — Project Location Map Exhibit "B" — List of Consultants JR:tw council t C3002Awdesign. duc � pp t{. me iip' llllitl Exhibit 'B" List of Consultants ASL Consulting Engineers STV Incorporated J.L. Patterson & Associates, Inc. JR:tw council \ C3002Awdesign.doc Pasadena Los Angeles Orange