Loading...
HomeMy WebLinkAbout2001-03-13 - AGENDA REPORTS - SIERRA HWY BRIDGE (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR City Manager er A pproval: Item to be presented by:&re DATE: March 13, 2001 SUBJECT: SIERRA HIGHWAY BRIDGE RESTORATION, PROJECT NO. S3014 - APPROVAL OF PROGRAM SUPPLEMENT NO. M006 DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION City Council approve Program Supplement No. M006 for the Sierra Highway Bridge Restoration, Project No. S3014; and authorize the City Manager or designee to execute all documents, subject to City Attorney approval. Sierra Highway over the Santa Clara River consists of twoseparate bridges running in the north/south directions. The northbound bridge (BR. No. 63C -1777R), built in 1968, spans approximately 401 feet over the Santa Clara River with a road width of 36 feet, a 6 -foot sidewalk on the east side, and a concrete barrier railing on the west side. The southbound bridge (BR. No. 63C -1777L), built in 1938, spans approximately 400 feet over the Santa Clara River with a roadway width of 37 feet, and a 2 -foot 10 -inch sidewalk on each side of the bridge. The scope of the Sierra Highway Bridge Restoration project consists of widening each bridge to a width of 44 feet and providing a 13 -foot -wide raised median to combine the two separate bridges as shown on the preliminary plan (Exhibit "A"). The existing sidewalks and concrete barriers on both bridges will be removed. Sidewalks of 6 -foot clear width with 8 -inch curbs, : concrete. barriers (Caltrans type 26 modified) with decorative tile, street lights, and chain link railing type 7 will be constructed on the exterior side of both bridges to conform with current code. requirements. The complete widened bridge will then be seismically analyzed, and the existing bridges will be retrofitted, if required. Caltrans has approved the bridge widening project under the Highway Bridge Replaeement/Rehabilitation (HBRR) Program, with 80 percent federal participation and the remaining 20 percent of the project cost funded by the City and the County of Los Angeles (the jurisdiction percentage to .be determined). The City will enter into a City/County Cooperative Agreement designating the County as the lead agency administering the project from design to construction. The City's portion of project costs will be funded by Los Angeles County as a result of.a credit issued to the City for an assignment of Surface Transportation Program (STP -L) funds accepted by the County (Exhibit "B"). Qpo o�¢D Agenda Item:. Ul/ls SIERRA HIGHWAY BRIDGE RESTORATION APPROVAL OF PROGRAM SUPPLEMENT NO. M006 March 13, 2001- Page 2' Master Agreement No. 07-5450 for federal aid projects was executed by the City and the State on July 15, 1997. Under the terms of this agreement, the City agreed to comply with all federal/State regulations. However, no funding was established to reimburse the City for our efforts, since this is always addressed in a separate Program Supplement Agreement. Program Supplement No. M006 (Exhibit "C") is the supplement for this project, which is currently in the preliminary engineering phase of the project. Under the HBRR program, 80 percent of project costs is funded through federal participation, while the remaining 20 percent of project costs is funded by the City and the County of Los Angeles (the jurisdiction percentage to be determined). Program Supplement No. M006 allocates $264,000.00 of HBRR funding (federal participation) and $66,000.00 local match for the preliminary engineering phase of the project. Program Supplement No. M006 will be revised at later dates to include other phases of the project and respective allocation of funds. Resolution No. 97-58 (Exhibit "D"), approved by the City Council on June 24, 1997, authorizes the City Manager or designee to execute all Program Supplements to Master Agreement No. 07-5450. ALTERNATE ACTION Other action as determined by the City Council. FI r IMPA T No immediate fiscal impacts have been identified. The City's portion of project costs will be funded by Los Angeles County as a result of a credit issued to the City for an assignment of Surface Transportation Program (STP -L) funds accepted by the County (Exhibit "B"). =A- Com— HMENTS Exhibit "A"– Preliminary Plan Exhibit "B" – Letter to County of Los Angeles regarding assignment of STP -L funds Exhibit "C" Program Supplement No. M006 Exhibit "D" – Resolution No. 97-58 . CA:tw council \ SieraHwyBrd9M006. doc » it, iI . ._ ■ �!�■ •|___! � �§| , ƒk . §( � !!|! !A§ | .- R"y City of Santa Clarita 23920 Valencia Blvd. Suite 300 Santa Clarita California 91355-2196 August 3, 1998 Exhibit "B" Phone (805) 259-2489 Fax (805)259-8125 Mr. Harry W. Stone, Director County of Los Angeles Department of Public Works P. O. Box 1460 Alhambra, CA 91802-1460 Attention: Greg Kelley Programs Development Division Subject: Assignment of City of Santa Clarita Federal Surface Transportation Program -Local Funds To the County of Los Angeles Dear Mr. Stone: The City of Santa Clarita requests that you consider accepting an assignment of a portion of the City's Surface Transportation Program (STP -L) funds in order to prevent the funds from lapsing to the Los Angeles County Metropolitan Transportation Authority (MTA). Funds in the amount of $654,955 are scheduled to lapse on September 30, 1998. We understand that the City and County will enter into an agreement to execute the assignment of funds. In this agreement, the City will receive credit for a future City -County cooperative road construction project or projects that will be administered and designed by the County. The City will, satisfy this condition through two upcoming Highway Bridge Replacement and Rehabilitation (HBRR) projects. The northbound bridge on Sierra Highway over the Santa Clara River is a $700,000 widening project; Bouquet Canyon Road over the Santa Clara River is a $4.2 million widening project. The City is currently seeking estimates for design of these projects. Upon consideration of our request, please issue an assignment agreement to the City. This agreement will be presented to the City Council for approval on August 25, 1998, and will then be returned to the County for presentation to the Board of Supervisors. We also understand that the County will notify MTA of this assignment of funds and will order a transfer of funds prior to September 30, 1998. This action will ensure that the City of Santa Clarita will not incur any lapsing funds. . Mr. Harry W. Stone August 3, 1998 Page 2 If you have any questions, please contact me at (805) 255-4963, or Assistant City Engineer Brad Therrien at (805) 255-4941. Thank you for your attention to this urgent request. Sincerely, 0 Ant Asi�ch�� or of Transportation & Engineering Services AJN.DMKdis ug-d"%fkU%w'wLd e cc: George A. Caravalho, City Manager Greg Kelley, Los Angeles County Public Works Exhibit "C" PROGRAM SDPPLffiM= NO. M006 to ADMINISTERING AGENCY -STATE AGREEMENT FOR FEDERAL -AID PROJECTS NO. 07-5450 Date:June 16,2000 Location: 07-LA.0-SCTA Project Number:BHLS-5450(008) N.A. Number: 07-927445 This Program Supplement is hereby incorporated into the Agency -State Agreement for Federal Aid which was entered into between the Agency and the State on 07/15/97 and is subject to all the terms and conditions thereof. This Program Supplement is adopted in accordance with Article I of the aforementioned Master Agreement under authority of Resolution No. approved by the Agency on (See copy attached). The Agency further stipulates that as a condition to payment of funds obligated to this project, it accepts and will comply with the covenants or remarks setforth on the following pages. PROJECT LOCATION: SIERRA HWY NB & SB OVER SANTA CLARA RIVER, BR # 53CI777R & 53CI777L. TYPE OF NORK: Rehabilitation/Widening LENGTH: O(MILES) PROJECT CLASSIFICATION OR PHASN(S) OF WORK [X] Preliminary Engineering [ ] Construction Engineering [ ] Right -Of -Way [ ] Construction Estimated Cost Federal Funds Matching Funds $330,000.00 Q10 $264,000.00 LOCAL $66,000.00 $0.00 OTHER $0.00 By Date Attest STATE OF CALIFORNIA Department of Transportation By Chief, Office of Local Programa Project Implementation Date Title I hereby certify upon my personal knowledge that budgeted funds are available for this encumbrance: Accounting Chapter I statutes Item Year 50 1999 2660-101-890 99-2000 Date 0 (J $264,000.00 eC Category Fund source =UXT C 224060 892-F 264,000.00 Program Supplement 07-5450-N006- ISTEA Page 1 of 07-LA-0-SCTA BHLS-5450(008) SPECIAL COVENANTS OR REMARKS 06/16/2000 1. The Local Agency agrees the payment of Federal funds will be limited to the amounts approved by the Federal Highway Administration in the Federal -Aid Project Agreement (PR-2)/Detail Estimate, or its modification (PR -2A) or the FNM -76, and accepts any increases in Local Agency Funds as shown on the Finance or Bid Letter or its modification as prepared by the Office of Local Programs Project Implementation. 2. This Program Supplement will be revised at a later date to include other phases of work. 3. The County of Los Angeles will design, advertise, award and administer including billing for this project, for and in behalf of the Local Agency, with the approval of the State. Program SaPP1emeat07-5450-X006- ISTZA Page 2 of 2 Exhibit "D" RESOLUTION NO. 9748 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA, AUTHORIZING THE EXECUTION OF MASTER AGREEMENT NUMBER 07-5450 FOR FEDERAL AID PROJECTS WI..EREAS, the Congress of the "United States has enacted the Intermodal Surface Transportation Efficiency Act of 1991 to fund programs which include, but are not limited to, the Surface Transportation Program (RSTP), the Congestion Mitigation and Air quality Improvement Program (CTNIAQ), the Transportation Enhancement Activities Program (TEAL, and the Bridge Replacement and Rehabilitation Program (HERR) (collectively the "Programs"); and N',Yn, F MA,Q, the Legislature of the State of California has enacted legislation by which certain federal funds (RSTP and CM.AQ) may be made available for use on local transportation facilities of public entities qualified to act as recipients of these federal funds in accordance with the intent of federal law; and `Z."' MAS, before federal aid will be made available for a speci$c program project, the City of Santa Clar'ta and State are required to enter into an agreement relative to prosecution of said project and maintenance of the completed facility. NOW, TIMMF ORE, TEE CITY COUNCIL OF THE CITY OF SANTA CLARI A does resolve as follows: SECTION 1: State -Local Master.Agreement Number 07-5450, as modified November 29, 1995, for federal aid projects is hereby approved. SECTION 2: The City Manager, or lis designee, is hereby authorized to execute the said State - Local blaster Agreement and all future program supplements to this agreement upon review and approval by the City. Council of Santa Clarita. SECTION 1 The City clerk shall certify to the adoption of this Resolution. P.9SSED, APPROVED AND ADOPTED this^_ , arh day of 1937 /s/ ff=ilton C. Smyth _ rLAYOR ATTEST: /s/ Sharon Dawson STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) CITY OF SANTA CLARITA ) I. �+ •.City Clerk of the City of Santa Clarita, do hereby certify that the foregoing Resolution was duly adopted by the City Couacil of the City of Santa Clarita at a regular meeting thereof; held on the 2A4-hday of -1,.. 19222 by the following vote of the Council AYES: COUNCMMEMBERS: rpj&-, 1CIe j ;c, Boyer, park..X yth NOES: COUNCMMEMBER.S: tom. ABSENT: COUNCILMEMBERS: amp CITY CLERK DMK:vil City of Santa Clarita CERTIFICATION By CITY CLERK STATE OF CALIFORNjA COUNTY OF LOS ANGELES )ss CITY OF SANTA CLARITA ) I, Sharon L. Dawson, CI4IC, Ci ty Clerk of the City of Santa Cl attached coaritay do hereby certify that the py of Resolution 97-58 is a complete and correct my office and was ado co PY of the original now on file in pied by the City Council of the City of Santa Clarita at the City C,,,,meeting on June 24, 1997. .,Vji4tzu,% onaron L. Dawson, CMC City Clerk