HomeMy WebLinkAbout2001-06-12 - AGENDA REPORTS - SOLEDAD LANDSCAPING BID AWARD (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR DATE: June 12, 2001 City Manager Approval: Item to be presented by: Kit Nell SUBJECT: SOLEDAD CANYON ROAD MEDIAN LANDSCAPING PROJECT NO. B3001- FEDERAL PROJECT NO.: STPLER 5450 (016) BID AWARD DEPARTMENT: Parks, Recreation, and Community Services RECOMMENDED ACTION Council award the contract for Project No. B3001 to MJS Construction, Inc., the lowest responsible bidder, in the amount of $644,000.00 plus a 15 percent contingency. Contract award to include traffic signal interconnect and Federal Project No. STPLER 5450 (017) traffic signal median modifications included as Bid Addendum No. 1 to the bid package. Expenditures from Account No. 4332-8001 to be contingent upon adoption of the FY 2001- 02 Annual Budget. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND On April 24, 2001, City Council authorized the advertisement of Project B3001. This project consists of landscaping along Soledad Canyon Road from Oak Avenue to Rainbow Glen Drive, and from Ironstone Drive to Miss Grace Drive. Project construction is anticipated to begin in early July, and (with the exception of the plant establishment period) is scheduled to be completed by mid-October. Also included in the project, as a bid addendum, are those elements required to support future traffic signal interconnect and Federal Project No. STPLER 5450 (017) traffic signal median modifications, which will lie within the limits of the landscaping project. Staff recommends inclusion of these ancillary elements to this contract as cost-effective and public convenience measures. The City Clerk received the following bids on May 29, 2001: MJS Construction, Inc. Palmdale, CA Tapuz Enterprises, Inc. Reseda, CA Los Angeles Engineering, Inc. Rosemead, CA Engineer's Estimate Belaire -West Landscape, Inc. Buena Park, CA MMI $644,000.00 $646,387.90 $652,407.47 $676,840.13 $893,979.00 Agenda Item: to ALTERNATIVE ACTION No alternative action identified by staff. FISCAL IMPACT The following accounts are proposed for construction of this project Account No. B3001001-8001 $246,175 General Fund Account No. B3001109-8001 $442,000 Federal Funds Account No. 4332-8001 $46,275 Traffic — Gas Tax Account No. T0014801-8001 $ 6,150 Transit Fund Note: Expenditures from Account No. 4332-8001 are to be contingent upon adoption of the FY 2001-02 Annual Budget. ATTACHMENT Project Location Map PrVCouncil\Agnrepts\2001 \B3001-03.doc PROJECT LOCATION MAP SOLEDAD CANYON ROAD MEDIAN LANDSCAPING PROJECT NO.: B3001 FEDERAL PROJECT NO.: STPLER 5450 (016) BID AWARD LOCATION MAP: OAK AVENUE TO RAINBOW GLEN DR. LOCATION MAP: IRONSTONE DR. TO MISS GRACE DR.