Loading...
HomeMy WebLinkAbout2001-05-22 - AGENDA REPORTS - VALLEY ST CALGROVE CLOSURE (2)CITY OF SANTA CLARITA AGENDA REPORT UNFINISHED BUSINESS DATE: May 22, 2001 City Manager Item to be presented by: 'rf4rZ SUBJECT: VALLEY STREET/CALGROVE BOULEVARD PERMANENT CLOSURE IMPROVEMENTS, PROJECT NO. S2003 — AWARD DESIGN CONTRACT DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION City Council award the contract to Psomas for engineering design services for Valley Street/Calgrove Boulevard Permanent Closure Improvements, Project No. S2003, in the amount of $23,571.00, and authorize a contingency expenditure in the amount of $1,429.00; and authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND At the April 10, 2001 City Council meeting, the City Council approved a budget transfer from City Council Contingency Account No. 1240-7401 to Account No. S2003001-8001 in the amount of $225,000.00 to initiate a capital improvement project to install the necessary physical improvements to fulfill the direction taken by the City Council on March 27, 2001. Staff prepared a Request for Proposals (RFP) for the subject project. Included in the RFP was the requirement to design the necessary closure improvements while maintaining emergency vehicle access at all times. The RFP was sent to firms on the City's Design Consultants List. Two firms submitted proposals (see Exhibit "C"). Based on technical qualifications and methodology for the project, Psomas is the recommended firm. Staff recognizes the priority of this project and has provided an aggressive schedule (see Exhibit "D") to meet the targeted dates. ALTERNATIVE ACTION Other action as determined by the City Council. Agenda Item: Continue VALLEY STREET/CALGROVE BOULEVARD PERMANENT CLOSURE IMPROVEMENTS — AWARD DESIGN CONTRACT May 22, 2001— Page 2 FISCAL IMPACT At the April 10, 2001 City Council meeting, the City Council approved a budget transfer from City Council Contingency Account No. 1240-7401 to Account No. 52003001-8001 in the amount of $225,000.00 for the design and construction of the permanent closure improvements. Remaining funds in the amount of $200,000.00 will be rebudgeted into Fiscal Year 2000/01 for construction of the project. The City will also incur additional maintenance costs for the access control devices necessary to prohibit vehicular through -traffic while permitting emergency vehicle traffic. ATTACHMENTS Exhibit "A!'— Vicinity Map Exhibit "B" — Conceptual Access Control Plan Exhibit "C" — List of Consultants Exhibit "D" — Project Schedule CA:lkl council\valleyvdl eawarddeeig .dm WeSEAM" PKVWVY.. Exhibit W 0 LYONS AVF''126 PROJECT LOCATION 2640' 1320' 0 2640' n, mmm%mmmm� FGUM1.0- Project Location and Vicinit 112-40-7M0Vagay StreeVUgmve BoWevard Amendment to be Cimulation 8wmM of rm General Plan and CW4*-Sac Pmiad EIR Exhibit "B" NOTES 1. CUL-DE-SAC AND PROVIDE DRIVEWAY TO CHAMPAGNE LANE (PRIVATE DRIVE 2. CLOSE THE EAST SIDE OF INTERSECTION COMPLETELY, MAKING A T -INTERSECTION 3. EXTEND THE BIKE LANES BETWEEN THE CLOSED AREA NE �IWGATEE6 J / � D 0 2 GATE o '( DO NOT VACATE CLOSED AREA GRAPHIC SCALE t (Knu) iM-100 R. CONCEPTUAL PLAN TO DISCONNECT VALLEY-CALGROVE STREET EXHIBIT "C" VALLEY STREET/CALGROVE BOULEVARD PERMANENT CLOSURE IMPROVEMENTS Company Name Willdan & Associates CONSULTANT'S LIST Address Industry, CA Psomas Santa Clarita, CA g;: X LU .................... ..................... ................ .......................... ... ................ E c .................. ME ........ .. ... .. E ........ .. ... .. ..... .......... .... . .... ..... ...................................................................................................................................................................... .................... ........ ............. ........... ..................... ............................... E ................ ...... ............ ........... ....... ....... .......... ..................................... ....... 0 C'I t: ................. ...... ........ ..................... ............. .......... ....... .......... C5 C, m .... ...... ................... ....................... ........... ..... ................ ............... ................ ............................ / \/ ) t | ! | » a J 2 ! ! ! ! z & | ! ! K ; 2 ! } CL — — — — - — — — — — — — — - — — — — — — — — — — IL 0 le & 00 2 Im 1} Al wo a O r r o3 R �r K� LL, oy LL r 3 gor O y y ................................................................................................................................................................................................................................. LL r A 3 g w ................................................................................................................................................................................................................................. LL r Q3 ci r N N ................................................................................................................................................................................................................................. N LL r 03 �r ............................................................... ................. ................. ........................ ......... .................... ....................................... :............. ...................... LL C r VVVY O of �N ..............._._.................................... .......................................... .................... . ..... _.. N....._ ........................................ ._._......................... 2..... a LL y C �e d pp 7C r r � V 3 m v cli MT E Q N a'N ......... ....................... ........................ .............. ......................................... .................... ............ ............... y d a' O V LL c r e ci r �^ co s dy W N ....................... . > LL Q pp r a p3 E S Oc ` r a 0 , IM i a a N Q fn .Z 'WO a d m 5 N LL d r tip 3 v