HomeMy WebLinkAbout2001-03-27 - AGENDA REPORTS - VALLEY STREET EIR (2)CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR City Manager
Item to be presented 15y-: -jIeffrey Lambert
DATE: March 27, 2001
SUBJECT: MASTER CASE NO. 99-377 - VALLEY STREET/CALGROVE
BOULEVARD GENERAL PLAN AMENDMENT
FINAL ENVIRONMENTAL IMPACT REPORT
DEPARTMENT: Planning and Building Services
COMMENDED ACTION
City Council adopt a resolution approving the proposed project as identified in the Final
Environmental Impact Report for the Valley Street/Calgrove Boulevard Amendment to the
Circulation Element of the General Plan.
BACKGROUND
The project includes eliminating the secondary highway designation from this section of
roadway on Valley Street and Calgrove Boulevard between Maple Street and Creekside Drive
and constructing two terminus abutting culdesacs completely prohibiting any through traffic__
except for emergency vehicles. On February 27, 2001, the Santa Clarita City Council directed
staff to prepare a Council resolution approving the proposed project.
The project area consists of a portion of Calgrove Boulevard and Valley Street between
Creekside Drive and Maple Street. The project site is located at the intersection of Calgrove
Boulevard and Valley Street.
ALTERNATIVE ACTIONS
The Council may approve any of the alternatives included in the FEIR or it may give staff other
direction as appropriate.
FISCAL IMPACT
The cost of constructing the proposed project and installing the required mitigation measures
has not been determined. After the City Council adopts the attached resolution, staff will
conduct a detailed cost analysis of the mitigation measures and will provide the Council with
those expense figures.
Adopted: _3.2-- Agenda Item
Valley /Calgrove Staff Report
City Council Consent Calendar
09/27/01 Page 2
ATTACHMENTS
City Council Draft Resolution
JES: \pbe\current%val•cal \er092701