HomeMy WebLinkAbout2002-07-09 - AGENDA REPORTS - CURB GUTTER SIDEWALK PROJ (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR City Manager Approv .A Item to be presented by: Christopher Pri e DATE: July 9, 2002 SUBJECT: FISCAL YEAR 2002-2003 REMOVAL AND REPLACEMENT OF CURB AND GUTTER, SIDEWALK, AND ACCESS RAMPS — PROJECT NOS. M0037, M0038, AND T0018; FISCAL YEAR 2001-2002 AND FISCAL YEAR 2002-2003 INSTALLATION OF NEW SIDEWALK CONSTRUCTION ON WILEY CANYON ROAD AND WHEELER ROAD — PROJECT NOS. T0016 AND T0019 — ADVERTISE FOR BIDS DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION City Council approve the plans and specifications; and authorize the advertising for bids for various capital improvement projects, Project Nos. M0037, M0038, T0016, T0018, and T0019. BACKGROUND The contract for these projects is being combined to most efficiently use available funding. The general scope of work for the combined projects is to remove and replace damaged sidewalk, curb and gutter, and access ramp improvements, as well as the installation of new sidewalk on Wheeler Road and Wiley Canyon Road in the Newhall community. This project is an annual concrete rehabilitation and improvement program aimed at repairing existing damaged concrete pads due to separations caused by both vertical and horizontal displacement, and concrete uplifting due to tree root infiltration. The project will also install new sidewalk to link missing walkways all around the existing sidewalk network. The sidewalk repair program is intended to fix damaged sidewalks in the Valencia, Canyon Country, and Saugus areas using available funds. The access ramp program will add new ramps and will remove and replace existing access ramps that do not meet the Americans with Disabilities Act (ADA) Title 21 requirements. ALTERNATIVE ACTION Other action as determined by the City Council. �Gq Agenda item: PROJECT NOS. M0037, M0038, T0016, T0018, AND T0019 — ADVERTISE FOR BIDS July 9, 2002 — Page 2 FISCAL IMPACT Available funds for these projects total $379,975.00. The estimated construction cost, including a 10 percent contingency, for these projects will be in line with the actual available funds. The actual projects' costs and contingencies will be ascertained once all bids have been received and opened. These funds are available in the following designated accounts: ATTACHMENTS Plans and Specifications (available in City Clerk's reading file) JKT:lkl c ndl\advertise02O3con..tei.p..d. Available Proiect Fiscal Year Account Nos. Funds Sidewalk Repair Program 2002-2003 M0038201 $100,000.00 Stormwater Flowline 2002-2003 M0037456 $150,000.00 Access Ramp Construction 2002-2003 T0018201 $ 20,000.00 New Sidewalk Construction 2001-2002 T0016201 $ 59,975.00 New Sidewalk Construction 2002-2003 T0019201 $ 50.000.00 TOTAL AMOUNT: $379,975.00 ATTACHMENTS Plans and Specifications (available in City Clerk's reading file) JKT:lkl c ndl\advertise02O3con..tei.p..d. On file in the Transportation and Engineering Department CONTRACT DOCUMENTS FOR C FISCAL YEAR 2002-2003 T ANNUAL CONCRETE REHABILITATION Y PROGRAM (CITYWIDE) 0 CITY OF F SANTA CLARITA g A N CITY PROJECT NOS: T A M0037, M0038, T0016, T00189 T0019 C L A ci y T A F 0 15 DEGE!7E