HomeMy WebLinkAbout2002-11-12 - AGENDA REPORTS - GATEWAY BEAUTIFICATION (2)CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR City Manager Approval
Item to beresen
p ted by: Kit Nell
l
DATE: November 12, 2002
SUBJECT: GATEWAY BEAUTIFICATION PROJECT NO. B2007 - EEM 2000(147)
ADVERTISE FOR BIDS
DEPARTMENT: Transportation & Engineering Services
RECOMMENDED ACTION
City Council adopt the plans and specifications; and authorize the advertising for bids for
the Gateway Beautification Project No. B2007, EEM 2000(147).
BACKGROUND
The Gateway Beautification project is a State-sponsored Environmental Enhancement
Mitigation (EEM) grant project consisting of tree planting along the Metrolink corridor at
Pine Street, Golden Triangle Road, and Via Princessa. The grant stipulates that at least
355 trees be planted along the Metrolink corridor, and that the State's participation will be
77 percent of the actual eligible costs up to a maximum of $237,353. The City's
participation for the project has been estimated at $85,000.
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
The maximum State participation
No. B2007-453, and $30,000 of the City
No. B2007-001.
ATTACHMENTS
of $237,353 has been budgeted in Account
City's participation was previously budgeted in Account
Project Location Maps
Plans and Specifications (available in City Clerk's reading file)
KN:lkl
Council\H2007.01.d.
�a` Ste, {V?
Agenda Item:
NORTH
SOLEDAD CANYON KU
C310 PROJECT LOCATION
ROUTE 14
LOCATION MAP: MA PRINCESSA METROLINK STATION
TN011 PROJECT LOCATION
NUE o
cj
Ln
LOCATION MAP: JAN HEIDT METROLINK STATION
PROJECT LOCATION
NORTH
GOLDEN TRIANGL RD SOLEDAD CANYON ROAD
Im
\N0
m
_ SERF
LOCATION MAP: GOLDEN TRIANGLE ROAD
On File in Bid Documents
CONTRACT DOCUMENTS
M
GATEWAY BEAUTIFICATION
PROJECT NO. B2007
EEM -2000 (147)
e
E-{