Loading...
HomeMy WebLinkAbout2002-11-12 - AGENDA REPORTS - GATEWAY BEAUTIFICATION (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR City Manager Approval Item to beresen p ted by: Kit Nell l DATE: November 12, 2002 SUBJECT: GATEWAY BEAUTIFICATION PROJECT NO. B2007 - EEM 2000(147) ADVERTISE FOR BIDS DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION City Council adopt the plans and specifications; and authorize the advertising for bids for the Gateway Beautification Project No. B2007, EEM 2000(147). BACKGROUND The Gateway Beautification project is a State-sponsored Environmental Enhancement Mitigation (EEM) grant project consisting of tree planting along the Metrolink corridor at Pine Street, Golden Triangle Road, and Via Princessa. The grant stipulates that at least 355 trees be planted along the Metrolink corridor, and that the State's participation will be 77 percent of the actual eligible costs up to a maximum of $237,353. The City's participation for the project has been estimated at $85,000. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT The maximum State participation No. B2007-453, and $30,000 of the City No. B2007-001. ATTACHMENTS of $237,353 has been budgeted in Account City's participation was previously budgeted in Account Project Location Maps Plans and Specifications (available in City Clerk's reading file) KN:lkl Council\H2007.01.d. �a` Ste, {V? Agenda Item: NORTH SOLEDAD CANYON KU C310 PROJECT LOCATION ROUTE 14 LOCATION MAP: MA PRINCESSA METROLINK STATION TN011 PROJECT LOCATION NUE o cj Ln LOCATION MAP: JAN HEIDT METROLINK STATION PROJECT LOCATION NORTH GOLDEN TRIANGL RD SOLEDAD CANYON ROAD Im \N0 m _ SERF LOCATION MAP: GOLDEN TRIANGLE ROAD On File in Bid Documents CONTRACT DOCUMENTS M GATEWAY BEAUTIFICATION PROJECT NO. B2007 EEM -2000 (147) e E-{