HomeMy WebLinkAbout2002-07-09 - AGENDA REPORTS - METROLINK PASSENGER AMENITIES (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDARCity Manager Approva Item to be presented by: Christopher Price DATE: July 9, 2002 SUBJECT: JAN HEIDT METROLINK STATION SECOND PLATFORM AND PASSENGER AMENITIES, PROJECT NO. F2005 - AWARD CONTRACT FOR DESIGN SERVICES DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION City Council award the design services contract for the Jan Heidt Metrolink Station second platform and passenger amenities, Project No. F2005, to Willdan in an amount not to exceed $65,000.00, and authorize a 10 percent contingency expenditure in the amount of $6,500.00; and authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND The Santa Clarita Transit Center passenger amenities, which include the second platform of the Jan Heidt Metrolink Station and new bus shelters along Railroad Avenue, are located within and adjacent to the newly constructed Jan Heidt Metrolink Station in the community of Newhall. On May 11, 1999, the City Council awarded the construction contract for the Jan Heidt Metrolink Station in Newhall. Construction consisted of building the new station, complete with five canopies, including a handicap access ramp, mini plaza, public restrooms, security room, bell and clock tower, and three parking lots. On November 30, 1999, the City Council approved additional funding to build a second platform in anticipation of the second track that had been proposed for the near future. City staff and Southern California Regional Rail Authority (SORRA) representatives held discussions regarding the future development of the subject station. It was determined that SCRRA intended to construct a second track and platform within the boundaries of the station in the very near future. The second track and platform were scheduled within the SCRRA 10 -year capital improvement plan. In accordance with City staff and SCRRA representatives, the second platform was constructed at that time to match the first platform in architectural design and construction materials. Agenda Item: 1bi JAN HEIDT METROLINK STATION SECOND PLATFORM AND PASSENGER AMENITIES, PROJECT NO. F2005 AWARD CONTRACT FOR DESIGN SERVICES July 9, 2002 — Page 2 The general entry to the station is through Railroad Avenue and Market Street on the west side. Currently, the first platform on the west side of the track is operational with canopies and other amenities. Metrolink is currently installing a second track in the east, and the platform is nearly ready to accommodate its use. All the underground work has been completed for the second platform. It is expected that the canopies and lights for the second platform would match those of the first platform amenities. In addition, four bus shelters along Railroad Avenue will be constructed. The four bus shelters are to be consistent with the architectural theme of the station and meet Citywide bus shelter guidelines. The bus shelters will be constructed within the public right-of-way behind the existing curbs, and modification of curb lines for a bus turnout is not expected. The City has performed an environmental study and no significant impact was found. The environmental study conducted by the City complied with the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA), and has sufficient information to enable the Federal Transit Administration to find that a categorical exclusion is appropriate for completion of the project referenced above. Therefore, this design contract does not include the environmental work except for environmental coordination. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT The project is FTA funded through MTA and local funds. Sufficient funds have been budgeted in the amount of $400,000.00, including the City's shared amount of $84,000.00 for Fiscal Year 2002/2003. See below for the breakdown of the funding source for the project: FUNDING SOURCE FTA Local Funds ATTACHMENT Exhibit "A" — Location Map JKT:lkl council\F2005\awd&si,n .nt. 062502.doc ACCOUNT NO. F2005801 F2005205 TOTAL AMOUNT: BUDGET AMOUNT $316,000.00 $ 84.000.00 $400,000.00