HomeMy WebLinkAbout2002-09-10 - AGENDA REPORTS - SIDEWALK CONST CURB GUTTER (2)CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR City Manager Approval.
Item to be presented by: Christopher Price
DATE:
September 10, 2002
SUBJECT: FISCAL YEARS 2001-02 AND 2002-03 NEW SIDEWALK
CONSTRUCTION, AND FISCAL YEAR 2002-03 REMOVAL AND
REPLACEMENT OF SIDEWALK, CURB AND GUTTER, AND
ACCESS RAMPS — PROJECT NOS. M0037, M0038, T0016, T0018,
AND T0019 —AWARD OF CONSTRUCTION CONTRACT
DEPARTMENT: Transportation & Engineering Services
RECOMMENDED ACTION
City Council award the construction contract for Fiscal Years 2001-02 and 2002-03
Concrete Rehabilitation Program, Project Nos. M0037, M0038, T0016, T0018, and T0019, to
Kalban, Inc. in the amount of $282,675.00, and authorize a contingency in the amount of
$28,267.00; authorize a contract change order to Kalban, Inc. in an amount not to exceed
$40,000.00 to construct additional access ramps/concrete repairs; and authorize the
City Manager or designee to execute all documents, subject to City Attorney approval.
BACKGROUND
The purpose of this project is to upgrade the City's sidewalk system and replace existing
damaged concrete pads due to separations caused by factors including uplifting due to tree
root infiltration. In addition to various sidewalk improvements, the curb and gutter
program will improve drainage flow into local storm drains, thereby improving stormwater
quality and minimizing street erosion. The Access Ramp Program will serve our disabled
community through the installation of new ramps, and meets the requirements outlined in
Title 21 of the Americans with Disabilities Act (ADA).
The contracts for these projects are being combined to most efficiently use the available
funding. The scope of work for the combined projects (M0037, M0038, T0016, T0018, and
T0019) consists of new sidewalk construction on Wiley Canyon Road as an improvement for
children attending the local elementary school. Additional public right-of-way
improvements include the construction of two new driveway approaches at Creekveiw Park
for patrolling purposes, removal and replacement of existing damaged concrete pads due to
separations caused by factors including uplifting due to tree root infiltration.
Agenda Item:
FY 2001-02 AND 2002-03 NEW SIDEWALK CONSTRUCTION, AND FY 2002-03
REMOVAL AND REPLACEMENT OF SIDEWALK, CURB AND GUTTER, AND ACCESS
RAMPS — AWARD OF CONSTRUCTION CONTRACT
September 10, 2002 — Page 2
The list of locations (Exhibit "B") was generated from residents' telephone calls received by
the Field Services and Transportation & Engineering Services Departments, and were also
areas identified by City staff as needing restoration.
Substantial constraints and controls have been established in the construction documents
to reduce potential impacts on local traffic and homeowners during the construction phase.
Construction is scheduled to start in October 2002 and is anticipated to be completed within
40 working days after the effective date of the Notice to Proceed. Staff will appoint
inspectors to ensure proper work performance by the contractor, as well as handling daily
field issues.
On July 9, 2002, the City Council approved the plans and specifications and authorized the
advertisement for construction bids. On August 28, 2002, the City Clerk's office received
bids for the project (Exhibit "X'). The Engineer's Estimate for project construction is
$350,000.00. The lowest responsive bid was submitted by Kalban, Inc. in the amount of
$282,675.00.
At this time, staff is recommending that the City Council authorize additional repair work
in an amount not to exceed $40,000.00 as a contract change order for the purpose of
constructing additional access ramps and expanding the level of concrete repairs. The
opportunity to increase the scope of the project is a result of the competitive bid process and
the bid prices submitted by Kalban, Inc. The final construction contract will not exceed the
total budget amount of $369,605.56.
Staff recommends that the project be awarded to Kalban, Inc., the lowest responsive bidder.
Kalban, Inc. possesses a State Contractor's License and is in good standing with the
State Contractor's License Board. Kalban, Inc. has done previous capital improvement
projects with the City and has provided quality service with minimal construction impact.
The bid of Kalban, Inc. was reviewed for accuracy and conformance to the contract
documents and was found to be complete.
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
Funds for these combined projects have been approved and budgeted in Account
Nos. M0037456, M0038201, T0016201, T0018201, and T0019201 for Fiscal Years 2001-02
and 2002-03 in the amount of $369,605.56. These funds are available in the following
designated accounts:
FY 2001-02 AND 2002-03 NEW SIDEWALK CONSTRUCTION, AND FY 2002-03
REMOVAL AND REPLACEMENT OF SIDEWALK, CURB AND GUTTER, AND ACCESS
RAMPS — AWARD OF CONSTRUCTION CONTRACT
September 10, 2002 — Page 3
Proiects
New Sidewalk Construction
New Sidewalk Construction
Sidewalk Repair Program
Stormwater Flowline Repair
Access Ramp Construction
ATTACHMENTS
Exhibit "A:'— Bid Results
TOTAL BUDGET AMOUNT: $369,605.56
Exhibit `B" — List of Street Locations
JKT:lkl
counci1\2002.03Con .WR&abAWud.dm
Available
Fiscal Year
Account Nos.
Funds
2001-2002
T0016201
$ 50,000.00
2002-2003
T0019201
$ 50,000.00
2002-2003
M0038201
$ 99,819.22
2002-2003
M0037456
$149,786.34
2002-2003
T0018201
$ 20.000.00
TOTAL BUDGET AMOUNT: $369,605.56
Exhibit `B" — List of Street Locations
JKT:lkl
counci1\2002.03Con .WR&abAWud.dm
EXHIBIT "A"
FISCAL YEARS 2001-02 AND 2002-03 NEW SIDEWALK
CONSTRUCTION, AND FISCAL YEAR 2002-03 REMOVAL AND
REPLACEMENT OF SIDEWALK, CURB AND
GUTTER, AND ACCESS RAMPS
PROJECT NOS. M0037, M00389 T00169 T0018, AND T0019
AWARD OF CONSTRUCTION CONTRACT
BID RESULTS
COMPANY
AMOUNT
OFFICE LOCATION
Kalban, Inc.
$282,675.00
Sun Valley, CA
Olivas Valdez Inc.
$328,043.00
Covina. CA
RC Becker & Son, Inc
$375,828.00
Newhall, CA
Berry General Engineering
$413,376.00
Oxnard, CA
JKT:lkl
council\2002-09C.n et R h.bA%d.doc
EXHIBIT "B"
NEW SIDEWALK CONSTRUCTION (T0016 & T0019)
STREET NAME REGION
Wiley Canyon Road (west side) Newhall
Between Powell Drive to Wabuska Street
Creekview Park entrance Newhall
SIDEWALK REPAIR PROGRAM (M0038)
Oakmoor Street
Canyon Country
Bainbury Street
Canyon Country
Dew Drop Avenue
Canyon Country
Vicci Street
Canyon Country
Camp Plenty Road
Canyon Country
Elder Creek Drive
Saugus
Larkmain Drive
Saugus
Charles Drive
Saugus
Happy Valley Drive
Newhall
Carnerwall Street
Newhall
Darbun Drive
Newhall
Matel Road
Valencia
Via Escovar
Valencia
Rio Prado
Valencia
Leticia Drive
Valencia
CURB AND GUTTER PROGRAM (M0037)
Esterbrook Avenue
Canyon Country
Fairweather Street
Canyon Country
Lakehurst Avenue
Canyon Country
Nearbrook Street
Canyon Country
Newhouse Street
Canyon Country
Oakgale Avenue
Canyon Country
Chaparro Drive
Saugus
Decoro Drive
Saugus
Barbacoa Drive
Saugus
Poplar Glen Circle
Saugus
Seco Canyon Drive
Saugus
Green Mill Avenue
Newhall
Happy Valley Drive
Newhall
Harby Drive
Newhall
Heritage Lane
Newhall
ACCESS RAMP CONSTRUCTION (T0018)
Winterdale & Anne Freda 4 Ramps
9' Street and Newhall Avenue 2 Ramps
8'hStreet and Newhall Avenue 1 Ramps
Crossglade and Lonerock 2 Ramps
Espuella Drive and Cantos Drive 2 Ramps
Espuella Drive and Berino Drive 2 Ramps
Espuella Drive and Caballeta Drive 4 Ramps
Espuella Drive and Diaz Drive 4 Ramps
Espuella Drive and Gavilan Drive 2 Ramps
Los Tigres Drive and Caballeta Drive 2 Ramps
Wiley Canyon Road and Wabuska Street 1 Ramps