Loading...
HomeMy WebLinkAbout2002-03-12 - AGENDA REPORTS - TRAFSIG BOUQUET CYN (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR DATE: March 12, 2002 City Manager Approval: Item to be presented by: SUBJECT: INSTALLATION OF A TRAFFIC SIGNAL AND INTERCONNECT ON SIERRA HIGHWAY AT AMERICAN BEAUTY DRIVE AND A TRAFFIC SIGNAL ON BOUQUET CANYON ROAD AT WELLSTON DRIVE — PROJECT NO. C0016 — PROJECT ACCEPTANCE DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION City Council accept the work performed by Taft Electric Company for the installation of the traffic signal and interconnect system on Sierra Highway at American Beauty Drive and the traffic signal on Bouquet Canyon Road at Wellston Drive, Project No. C0016; direct the City Clerk to file the attached Notice of Completion; and direct staff to release the ten percent retention 35 days after the Notice of Completion is recorded, provided no stop notices, as provided by law, have been filed. BACKGROUND This project installed a traffic signal and interconnect system on Sierra Highway at American Beauty Drive and a traffic signal on Bouquet Canyon Road at Wellston Drive. The installation of traffic signals at these two intersections was combined as one project. On April 24, 2001, the City Council awarded a contract to Taft Electric Company for the installation of the traffic signal and interconnect system at the subject locations. The signalization of both intersections was based on the results of the City's Annual Traffic Signal Priority Rating System. The result of this evaluation was reviewed and approved by the City Council at their July 11, 2000 regular meeting. This traffic signal project was completed on February 15, 2002 to the satisfaction of the City Engineer. ALTERNATIVE ACTION Other action as determined by the City Council. Agenda Item.6 L Lu' ` INSTALLATION OF A TRAFFIC SIGNAL AND INTERCONNECT ON SIERRA HIGHWAY AT AMERICAN BEAUTY DRIVE AND A TRAFFIC SIGNAL ON BOUQUET CANYON ROAD AT WELLSTON DRIVE March 12, 2002 — Page 2 FISCAL IMPACT An amount of $339,443.79 was budgeted for this project in Account Nos. C0016001 and C0016201. All components of the project were completed per the plans and within budget. As of December 14, 2001, the County of Los Angeles added these two intersections to the Traffic Signal Maintenance Agreement 59603. ATTACHMENTS Notice of Completion of Public Improvement and Work Exhibit "A!'— Project Location Map TMB:lkl council\Project C0016 Award.doc EXHIBIT A - VICINITY MAP