AGENDA REPORT
CONSENT CALENDAR
DATE: March 12, 2002
City Manager Approval:
Item to be presented by:
SUBJECT: INSTALLATION OF A TRAFFIC SIGNAL AND INTERCONNECT ON
SIERRA HIGHWAY AT AMERICAN BEAUTY DRIVE AND A
TRAFFIC SIGNAL ON BOUQUET CANYON ROAD AT WELLSTON
DRIVE — PROJECT NO. C0016 — PROJECT ACCEPTANCE
DEPARTMENT: Transportation & Engineering Services
RECOMMENDED ACTION
City Council accept the work performed by Taft Electric Company for the installation of the
traffic signal and interconnect system on Sierra Highway at American Beauty Drive and
the traffic signal on Bouquet Canyon Road at Wellston Drive, Project No. C0016; direct the
City Clerk to file the attached Notice of Completion; and direct staff to release the
ten percent retention 35 days after the Notice of Completion is recorded, provided no stop
notices, as provided by law, have been filed.
BACKGROUND
This project installed a traffic signal and interconnect system on Sierra Highway at
American Beauty Drive and a traffic signal on Bouquet Canyon Road at Wellston Drive.
The installation of traffic signals at these two intersections was combined as one project.
On April 24, 2001, the City Council awarded a contract to Taft Electric Company for the
installation of the traffic signal and interconnect system at the subject locations. The
signalization of both intersections was based on the results of the City's Annual Traffic
Signal Priority Rating System. The result of this evaluation was reviewed and approved by
the City Council at their July 11, 2000 regular meeting.
This traffic signal project was completed on February 15, 2002 to the satisfaction of the City
Engineer.
ALTERNATIVE ACTION
Other action as determined by the City Council.
Agenda Item.6
L Lu' `
INSTALLATION OF A TRAFFIC SIGNAL AND INTERCONNECT ON
SIERRA HIGHWAY AT AMERICAN BEAUTY DRIVE AND A TRAFFIC
SIGNAL ON BOUQUET CANYON ROAD AT WELLSTON DRIVE
March 12, 2002 — Page 2
FISCAL IMPACT
An amount of $339,443.79 was budgeted for this project in Account Nos. C0016001 and
C0016201. All components of the project were completed per the plans and within budget.
As of December 14, 2001, the County of Los Angeles added these two intersections to the
Traffic Signal Maintenance Agreement 59603.
ATTACHMENTS
Notice of Completion of Public Improvement and Work
Exhibit "A!'— Project Location Map
TMB:lkl