Loading...
HomeMy WebLinkAbout2003-05-27 - AGENDA REPORTS - GVR/SOLEDAD CYN MTA SCRRA AGMT (2)CONSENT CALENDAR CITY OF SANTA CLARITA AGENDA REPORT City Manager Approval: Item to be presented by: Agenda Item:_ Christopher Price DATE: May 27, 2003 SUBJECT: GOLDEN VALLEY ROAD/SOLEDAD CANYON ROAD INTERCHANGE, PROJECT NO. S3005 — EXECUTE CONSTRUCTION AND MAINTENANCE AGREEMENT BETWEEN CITY AND SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY AND METROPOLITAN TRANSPORTATION AUTHORITY DEPARTMENT: Transportation and Engineering Services RECOMMENDED ACTION City Council authorize the execution of the Construction and Maintenance Agreement with the Southern California Regional Rail Authority (SORRA) and allow the expenditure of $93,000.00 from Account No. 53005301 to SCRRA for the railroad work (see Exhibit "A" for cost breakdown); and authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND The City's General Plan Circulation Element identifies the ultimate roadway network for the build out of the General Plan. This network includes Golden Valley Road. This roadway is also identified in the Bridge & Thoroughfare (B&T) District and represents an important additional roadway link to improve travel within the City. The construction of Golden Valley Road calls for the development of an interchange that bridges Soledad Canyon Road, and will eventually cross the Santa Clara River and connect to the future Newhall Ranch Road. The work covered by this Agreement will include preparations to the adjacent signals, and the necessary time for SCRRA "flagmen" to inspect the City's work in and around the railroad right-of-way. 1� i F" 71 LPLii 0! F F 1101 The bridge that is being designed for the overcrossing will span Golden Triangle Road, one set of railroad tracks which fall under MTA jurisdiction, and Soledad Canyon Road. The columns for the bridge will not be placed directly on the SCRRA/MTA property, but an "airspace" easement will be necessary to satisfy all legal requirements for the overcrossing. Staff is preparing these further documents and will return to the City Council as they become ready for implementation. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL -IMPACT Sufficient funds have been budgeted for Fiscal Year 2002-2003 in Account No. 53005301 to cover the cost. ATTACFmMNTS Exhibit "A" - Cost Estimate for SCRRA Services EXIBHIT "A" COST ESTIMATE Fp CRRA SERVICES Golden Valley Road Valley Subdivision Crossing No. 101 VY -35.62-A NO, ITEMS UNITS UNIT COST QUAN. COST($) ($) 1• Engineering, Administration Consultation and Documentation L.S.$12.000.00 1 $12,000.00 2. Flagging and Inspection Services 3. Signal Construction Cost Days $600.00 120 $72,000.00 4• L.S. $3,000.00 1 $3,000.00 Agency Costs Total Estimated SCRRA L L.S. $6,000.00 1 $6,000.00 Cost $93,000.00 NOTES: The cost of the work shown herewith is an estimate only and the City of Santa Clarita will reimburse SCRRA on the basis of actual cost. Golden Valley Road Underrossing Crossing No, 101 VY -35.62-A Construction and Maintenance Agreement 0425/03