Loading...
HomeMy WebLinkAbout2003-03-11 - AGENDA REPORTS - METROLINK CONST CONTR NEWHALL (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR DATE: March 11, 2003 City Manager Approval: Item to be presented by: Agenda Item: " .-W- Christopher Price SUBJECT: JAN HEIDT METROLINK STATION IN NEWHALL SECOND PLATFORM AND PASSENGER AMENITIES, PROJECT NO. F2005 — AWARD OF CONSTRUCTION CONTRACT AND APPROVAL OF PROJECT PLANS AND SPECIFICATIONS DEPARTMENT: Transportation and Engineering Services RECOMMENDED ACTION City Council award the construction contract to Vido Samarzich, Inc. in the amount of $351,765.00, and authorize a contingency in the amount of $35,000.00; appropriate $84,446.00 from Proposition "A" Fund Balance to project Account No. F2005205-8001 and appropriate $10,000.00 from the existing outstanding General Fund loan from the Redevelopment Agency to address budget shortfall to project Account No. F2005901-8001; approve the project plans and specifications; and authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND On July 9, 2002, City Council awarded the design services contract for the Jan Heidt Metrolink Station in Newhall second platform and passenger amenities to Willdan. The design for the second platform and passenger amenities was completed for construction on December 18, 2002. On January 22, 2003, the City Clerk's office received bids for the project (Exhibit "B"). Vido Samarzich, Inc. submitted the lowest responsive bid in the amount of $351,765.00, in addition to a 10 percent contingency in the amount of $35,000.00. The current available budget is $292,319.00. Due to the shortfall of the budget, staff recommends, with the approval of the City Manager, to appropriate $84,446.00 from Proposition "A" Fund Balance to project Account No. F2005205-8001, appropriate $10,000.00 from the existing outstanding General Fund loan from the Redevelopment Agency to address budget shortfall to project Account No. F2005901-8001. The architectural design and construction material for the second platform will be identical to the first platform. All the underground work has been completed for the second platform. Metrolink has completed the installation of the second track on the east; therefore, Metrolink will be in operation once the platform amenities are constructed and ready to accommodate its use. P"Llu" Lr�Ut{ii U Li"_7 � 91 In addition, three bus shelters will be constructed, of which two will be at Railroad Avenue and Market Street and one at Railroad Avenue and 6th Street. The three bus shelters are designed to be consistent with Citywide bus shelter guidelines and the architectural theme of the station. Substantial constraints and controls have been established in the construction documents to reduce potential impacts on local traffic and homeowners during the construction phase. Construction is scheduled to start in early April 2003 and is anticipated to be completed within 40 working days after the effective date of the Notice to Proceed. Staff will appoint inspectors to ensure proper work performance by the contractor, as well as handling daily field issues. Since this project is a joint effort with the Southern California Regional Rail Authority (SCRRA), City staff will be coordinating with SCRRA for construction activities. SCRRA will also have trained flagmen to patrol the vehicle and foot traffic during the construction activities in the vicinity of the Metrolink track. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT The project is FTA funded through MTA and local funds. Funds for this project were previously appropriated by the City Council in the amount of $292,319.00, including the City's shared amount of $61,503.00 for Fiscal Year 2002/2003. Based on the bids received, at this time there are not adequate appropriated funds to award a construction contract for this project. See below for the breakdown of the funding source for the project: FUNDING SOURCE FTA Proposition A TOTAL AMOUNT: ACCOUNT NO. F2005801 F2005205 BUDGET AMOUNT $230,816.00 $61,503.00 $292,319.00 In order to award construction of this project, the City Council will need to approve an appropriation of $84,446.00 from Proposition "A" Fund Balance to project Account No. F2005205-8001, and an appropriation of $10,000.00 from the existing outstanding General Fund loan from the Redevelopment Agency to project Account No. F2005901-8001 to address the anticipated budget shortfall. ATTACHMENTS Exhibit "A" - Location Map Exhibit 'B" - Bid Results A,"aTi _i 'r=, __ ":Y+v.�. EXHIBIT "B" JAN HEIDT METROLINK STATION SECOND PLATFORM AND PASSENGER AMENITIES PROJECT NO. F2005 AWARD OF CONSTRUCTION CONTRACT BID RESULTS DATED JANUARY 22, 2003 COMPANY AMOUNT OFFICE LOCATION Vido Samarzich, Inc. $351,765.00 Alta Loma, CA John Bur eson Construction Inc. $352,828.08 Santa Clarita, CA Mendez Concrete, Inc. $398,581.90 Santa Paula, CA Stevens Construction, Inc. $520,000.00 Lancaster, CA Zondiros Cor $544,000.00 Torrance, CA