Loading...
HomeMy WebLinkAbout2003-03-11 - AGENDA REPORTS - PASEO SIDEWALK REMOVAL (2)Agenda Item: --& CITY OF SANTA CLARITA AGENDA REPORT t CONSENT CALENDAR City Manager Approval' Item to be presented by: Nancy Delange DATE: March 11, 2003 SUBJECT: PASEO SIDEWALK REMOVAL AND REPLACEMENT IN VARIOUS LOCATIONS IN THE CITY OF SANTA CLARITA, PROJECT NO. LMD 131, BID AWARD DEPARTMENT: Administrative Services RECOMMENDED ACTION 1) City Council award the contract for Paseo Sidewalk Removal and Replacement in Various Locations in the City of Santa Clarita, Project No. LMD 131, to R.C. Becker and Son, the lowest responsible bidder, for an amount not to exceed $143,770.86, plus a 20% contingency expenditure. The contingency amount of 20% is recommended for this project to account for unforeseen expenses, such as utility excavations, increased materials costs, and/or additional square footage. Funds are available in LMD Operating and Maintenance Account No. 2906-8012. 2) Authorize the City manager or his designee to execute all documents, subject to City Attorney approval BACKGROUND This project consists of the removal and reconstruction of concrete paseos (sidewalks) within the Valencia Hills Landscape Maintenance District - LMD T3. The subject area is bounded by Sarda Road, Rotunda Road, Tournament Road, and Oak Vale Drive (as shown on the Attachment). There are approximately 45,654 square feet of damaged, 4" deep concrete paseos that require reconstruction within the described boundary. The existing paseos within this LMD are approximately 35 years old and have been impacted by factors such as weather, tree roots, and vandalism. In addition, the soils movement from the 1994 Northridge Earthquake appears to have contributed to a significant amount of cracking and lifting in these walkways. The earthquake damage experienced in this tract was notably disproportionate to other tracts of similar size and age within the City's limits. State law requires the City to award to the lowest responsible bidder for Public Works Projects. The following bids were received by the City Clerk on December 4, 2002. •uta li VL.� a ��_� * RC Becker & Son, Inc. Santa Clarita, CA $143,770.86 Dial Construction, Inc. A&R Construction Corp. Simi Valley, CA Northridge, CA $174,502.60 $188,202.00 Torres Construction Group Los Angeles, CA $204,399.00 Samrod Corporation Lancaster, CA $243,639.20 Engineer's Estimate $244,320.00 Southland Construction Anaheim, CA $248,270.00 Berry General Engineering Oxnard, CA $255,698.90 Griffith Company Santa Fe Springs, CA $256,183.92 ABC Lawn Sprinkler, Inc. Santa Clarita, CA $271,554.72 SHE Construction Group Reseda, CA $299,442.00 CNM Paving, Inc. Camarillo, CA $302,695.20 CA Rasmussen, Inc. Simi Valley, CA $314,990.66 Kalban, Inc. Sun Valley, CA $334,678.42 ALTERNATIVE ACTIONS Other alternatives as identifed by Council. FISCAL IMPACT Existing funds in the amount of $172,525.03 have been previously budgeted in LMD Operating and Maintenance Account No. 2906-8012. ATTACHMENTS Project Location Map PROJECT LOCATION MAP 'r vl,L . . I w J S,S-.jr �" » ►r 11317.1 "1 w— IS b"I M 16 Is ZONE T-3IOU ,S VALENCIA HILLS r r i rel h a ; w r �i •1 t 41.s 3-1 O • " w +� `r r• • • i X11 • • � • 7 , 3_2 O r y 4 Ka ��Vl1 + r1 jM � 3-3 der S = s VIA SS l ► • i j •• � ► y w y ++ . . v4'�y 3_5 r � t � n w • . �Sp„tJl � jz J qSg� I I'• .. .. + � 1. y OX IF 4V 4 Ll ,tyy T L' O� Q i� • t : � w w M 1 r ~ Ar � t •. a d h r � • - ' ? i or r 01,, r ,