CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR City Manager Approval:
Item to be presented by: Lisa Hardy
DATE: May 25, 2004
SUBJECT: AUTHORIZATION TO ENTER INTO A PROFESSIONAL
SERVICES AGREEMENT WITH CHRISTOPHER A. JOSEPH
ASSOCIATES TO PREPARE AN ENVIRONMENTAL IMPACT
REPORT (EIR) FOR THE KEYSTONE PROJECT, TENTATIVE
TRACT MAP (MASTER CASE 03-358)
DEPARTMENT: Planning and Building Services
RECOMMENDED ACTION
City Council authorize the City Manager or designee to enter into a professional services
agreement between the City and Christopher A. Joseph Associates to prepare an EIR for The
Keystone Project (Master Case 03-358) for a total contract amount not to exceed $461,725
from account 501-23053, subject to City Attorney approval. EIR preparation costs will be borne
by the applicant.
BACKGROUND
City staff is recommending that an EIR be prepared for The Keystone Project (Tentative Tract
Map 60258). The applicant, Synergy, is proposing to develop 247.2 acres located in the
north -central portion of the City of Santa Clarita, north of the Santa Clara River, west of Central
Park, and east of Ermine Street. The development consists of 96 single-family homes, 218
multi -family homes, and 665 townhomes for a total of 979 residential emits. A junior high
school site is proposed adjacent to the Santa Clara River. Golden Valley Road would also be
extended through the site to eventually connect with Plum Canyon Road to the north.
With the tentative tract map application, the applicant is requesting a General Plan Amendment
and Zone Change to change the existing Residential Very Low designation to Residential
Moderate to allow for a higher density residential development. A Hillside Development Review
is required as proposed grading activity will occur on slopes over 10 percent of the average
grade. The project is subject to the provisions of the Ridgeline Preservation and Hillside
Development Ordinance. A Conditional Use Permit is required for grading in excess of 100,000
cubic yards. As part of the Conditional Use Permit request, the applicant is seeking approval of
an innovative application to grade on primary and secondary ridgelines for residential
development.
Christopher A. Joseph Associates was the highest rated firm of the three firms interviewed by
City staff for the preparation of the EIR. The cost for preparing the document is $461,725. This
includes a 10% contingency fee, which will provide a buffer in the event of unexpected costs.
The funds were deposited into a 501 account and this amount will cover all costs associated with
the EIR.
ALTERNATIVE ACTIONS
1. Do not approve the contract with Christopher A. Joseph Associates and select an alternate
consulting firm for the preparation of the EIR.
2. Other action as determined by the Council.
FISCAL rMPACT
The cost of EIR preparation will be bome solely by the applicant. Synergy has submitted a check
which was deposited into account 501-23053 The Keystone Project ETR. Therefore,
authorization to proceed with the EIR does not create a fiscal impact to the City's budget.
ATTACHMENTS
EIR Cost Estimate
Schedule & Deliverables
TABLE 2
The Keystone Project
EIR Cost Estimate
1 Project Initiation and Orientation
Orientation Meeting/Coordination Curtis Zacuto 6 $170.00
Orientation Meeting Shane Parker 2 $150.00
Scoping Meeting & Preparation
Curtis Zacuto
4
$170.00
Scoping Meeting & Preparation
Shane Parker
4
$150.00
Coordination of Scoping Meeting Materials
Helen Crofoot
2
$70.00
Scott Wirtz
24
$110.00
_ _"i
13 Oversight/Management of the Technical Subconsultants
$110.00
Helen Crofoot
24
Air Quality
JHA Environmental
Subconsultant
Archaeological Resources
McKenna, at al
Subconsultant
Biological Resources
Glen Lukos Associates
Subconsultant
Geology, Hazards & Mineral Resources
Leighton & Associates
Subconsultant
Hydrology and Water Quality
Hunsaker & Associates
Subconsultant
Paleontogical Resources
Paleo Environmental
Subconsultant
Transportation and Traffic
Austin -Faust
Subconsultant
Visual Simulations*
FORMA
Subconsultant
Consultant Coordination
Curtis Zacuto
36
$170.00
j4
Preparation of Preliminary Draft EIR
Summary
Paulette Franco
4
$110.00
Introduction
Paulette Franco
2
$110.00
Project Description
Curtis Zacuto
36
$170.00
Aesthetics
Marc Melinkoff
40
$130.00
Air Quality
Shane Parker
2
$150.00
Scott Wirtz
8
$110.00
Biological Resources
Marc Melinkoff
24
$130.00
Cultural Resources
Paulette Franco
4
$110.00
Helen Crofoot
2
$70.00
Geology
Marc Melinkoff
32
$130.00
Hazards
Geoff Reilly
16
$150.00
Paulette Franco
4
$110.00
Hydrology
Marc Melinkoff
24
$130.00
Land UserPlanning
Geoff Reilly
32
$150.00
Paulette Franco
6
$110.00
Mineral Resources
Geoff Reilly
8
$130.00
Noise
Shane Parker
8
$150.00
Scott Wirtz
32
$110.00
Population/Housing
Geoff Reilly
24
$150.00
Helen Crolcot
4
$70.00
Public Services
Shane Parker
8
$150.00
Helen Crofoot
45
$70.00
Recreation
Shane Parker
2
$150.00
Helen Crofoot
8
$70.00
Transportation
Shane Parker
32
$150.00
Paulette Franco
4
$110.00
Utllities/Service Systems
Shane Parker
8
$150.00
Paulette Franco
32
$110.00
Growth -Inducing Impacts
Paulette Franco
8
$110.00
Organizations and Persons Consulted
Helen Crofoot
2
$70.00
Alternatives
Curtis Zacuto
50
$170.00
Paulette Franco
24
$110.00
u:.Vfna aft EI....v4
.I of
5 Review and Approval of the Preliminary Draft EIR
Respoding to City Comments (2 review cycles)
Curtis Zacuto
50
$170.00
Shane Parker
50
$150.00
Geoff Reilly
45
$150.00
Marc Melinkoff
45
$130.00
Scott Wirtz
24
$110.00
Paulette Franco
24
$110.00
Helen Crofoot
24
$70.00
Subtotal
$1
$14,
$31,
$6,
$6,
$3,
$3,
$1
$7
$1
6 Production and Circulation of the Draft EIR
Prepare Document for Circulation
Preparation of the Preliminary Final EIR
Prepare Responses to Comments -
8 Final EIR
Prepare Document for Circulation
9 Preparation of MMRP
Prepare MMRP for Circulation
TABLE 2
The Keystone Project
EIR Cost Estimate
Shane Parker 2
$150.00
Helen Crofoot 24
$70.00
=i,
Curtis Zacuto 55
$170.00
Shane Parker 55
$150.00
Geoff Reilly 32
$150.00
Marc Melinkott 45
$130.00
Paulette Franoo 40
$110.00
Scott Wirtz 24
$110.00
Helen Crofoot 40
$70.00
Pt -11t iH i,,
Shane Parker 2
$150.00
Helen Crofoot 24
$70.00
Curtis Zacuto 2
$170.00
Paulette Franoo 4
$110.00
�nn��{n:a:
tt„tE4t`ia,:. :P>w@
Curtis Zacuto 50
$170.00
Shane Parker 50
$150.00
Curtis Zacuto 50
$170.00
Shane Parker 50
F;
�p�ry$150.00
•ifH.
a`x%nH'tiNla i2re�i3
Curtis Zacuto 2
$170.00
Paulette Franco 6
$110.00
Curtis Zacuto 2
$170.00
Paulette Franco
$110.00:v�
,6
.,'{3dd, a>
Trish Perez 6
$445.5.00
Word Processing Jeff Deems 24 $45.00 $1,080.
Graphics/Mapping
Graphics Preparation by FORMA FORMA Subconsultant $22,100.
Mapping Preparation by FORMA FORMA Subconsultant $10,775.
Coordination with FORMA Helens Crofoot _ t32 S45.00 $1,440.
Other ExppensI�aES�
Otheenses
Direct Costs (Printing, repro, faxing, mail, etc.) $15,000.
Contingency (10%) $41,975.
This estimate for the FEIR is based upon a moderate number of comment letters and two (2) rounds of review with the City. If an excessive
number of comment letters is received or additional rounds of review are required, the City understands that the cost could exceed this estima
FORMA will be performing three tasks for CAJA: 1) Visual Simulations; 2) Graphics Presentation; and 3) Mapping. The cost shown under
Task 3 is for Visual Simulations. A breakdown of the other two tasks are orovided below under r;ranhlev/Menninn
Christopher A. Joseph & Associates
III. SCHEDULE AND DELIVARABLES
February 4, 2004
As listed in Table 1, CAJA proposes an approximate nine to eleven month period for completing the Park
Vista Project EIR':
• As directed in the RFP, fifteen (15) copies of the Administrative Draft EIR and three (3) copies of
the Technical Appendices will be submitted to the City. CAJA estimates this task can be
completed within 16 weeks from authorization to proceed and completion/approval of the EIR
project description and all pertinent project defining materials. This schedule assumes that the
project traffic study will be completed approximately 6-8 weeks after project initiation.
It is anticipated that the City will require at least two weeks to review the Preliminary
Administrative Draft EIR. Upon receipt of the City's comments CAJA Proposes to complete the
necessary revisions to the Preliminary Draft EIR within 2 weeks and will submit a second
Preliminary Draft EIR for review.
It is anticipated that the City will require at least one week to review the Second Preliminary
Administrative Draft EIR. Depending on the level of revisions and team involvement necessary,
CAJA will revise the document as necessary within one week and submit the revised Preliminary
Draft EIR to the City for review. Following approval by the City, CAJA will publish and
circulate copies of the Draft EIR and Technical Appendices.
• Upon completion of the Draft EIR one hundred copies (100) and one (1) reproducible master of
the Draft EIR will be provided to the City for distribution.
• CAJA assumes a 45 -day public review and comment period for the Draft EIR.
• Upon completion of the public review period and receipt of all comment letters on the Draft EIR,
CAJA will prepare the responses to comments within four to six weeks. We have allowed a
period of six weeks for the City to review and for CAJA to revise the Final EIR/responses to
comments, as necessary.
• Upon City approval of the Preliminary Final EIR, CAJA will print and circulate seventy (70)
copies of the Final EIR and one (1) reproducible master copy, which will include the Draft EIR,
public comments, responses to comments, and corrections and additions to the Draft EIR.
' This schedule assumes: 1) that the scope of the work described in Section 11 is not substantially expanded by the City; 2) that
there are no delays in the delivery of critical information by the City, public service agencies and utilities, or the project
applicant; and 3) that the lead City agency's review process can conform to the schedule described herein.
EIR Proposal for Park Vista (Master Case 03-358) 111, Schedule and Deliverable Products
City of Santa Clarita Planning and Building Services Page 11-1
Christopher A. Joseph & Associates
February 4, 2004
Because the process for preparing the Specific Plan and EIR are highly dependent upon processes that are
wholly beyond the control of the City and CAJA, it is difficult to estimate the total time that would be
required from project inception to certification of the EIR and approval of the project. Based on the
timeline described above and shown in Table 1, it is anticipated that the Final EIR could be completed
within approximately nine to eleven months from completion of the EIR project description, subject to
coordination and additional refinement by the City as necessary.
EIR Proposal for Park Vista (Master Case 03-358) 111. Schedule and Deliverable Products
Ciry of Santa Clarita Planning and Building Services Page 11-2
Christopher A. Joseph & Associates
Table 1 — EIR Schedule (slip page)
February 4, 2004
E/R Proposal for Park Vista (Master Case 03-358) l/l. Schedule and Deliverable Products
City of Santa Clarita Planning and Building Services Page 11-3
Ewe
-
e
-�
=1=�I:I:I:I:1=I.I:hI:.
-limmmim:=:-
:-:-
1
-1.1:1:1=.1:�
:.
0NE
=LFam
�hI:
M
ME
071MEN
�� p�1\rrrrr� �i�r1� •111111�� ♦ �
�� ..��tf�����\ ��/� X11111 �� ,�♦�♦♦fir♦�� � -
����
�� .r ���■ � . ,�� �1 ♦ III � '�-'- -
WIN
1111/11/
IIUSS-
�
n=� ♦ �, -- -- -
--
MCCC2
11111- -
DIY
11 X11
WA �■
--M o%