Loading...
HomeMy WebLinkAbout2004-05-25 - AGENDA REPORTS - GVR SOLEDADCYN S3005 AWARD CON (2)CONSENT CALENDAR DATE: SUBJECT: DEPARTMENT: Agenda Item: — /V CITY OF SANTA CLARITA AGENDA REPORT City Manager Approval: Item to be presented by: May 25, 2004 GOLDEN VALLEY ROAD/SOLEDAD CANYON ROAD INTERCHANGE, PROJECT NO. S3005 - APPROVE THE PLANS AND SPECIFICATIONS, AND AWARD THE CONSTRUCTION CONTRACT Transportation and Engineering Services RECOMMENDED ACTION 1) City Council approve the plans and specifications; and award the construction contract to Security Paving Company, Inc. for the Golden Valley Road/Soledad Canyon Road Interchange (Interchange), Project No. 53005, in the amount of $12,661,720.00, and authorize a contingency in the amount of $1,899,258.00; 2) Award the construction management contract to Employment Services, Inc. in the amount of $250,000.00, and authorize a contingency in the amount of $37,500.00; award the materials and inspection services contract to BTC Laboratories in the amount of $150,000.00, and authorize a contingency in the amount of $22,500.00; award the construction surveying services contract to Sikand Engineering in the amount of $250,000.00, and authorize a contingency in the amount of $37,500.00; award the geotechnical services contract to Ninyo & Moore in the amount of $76,000.00, and authorize a contingency in the amount of $11,400.00; award the labor compliance contract to Padilla and Associates in the amount of $100,000.00, and authorize a contingency in the amount of $15,000.00; and approve an expenditure to Southern California Edison in the amount of $250,000.00 for the cost of undergrounding the overhead utilities; 3) Appropriate $3,000,000.00 of federal appropriations from Fiscal Year 2003/2004, $2,046,198.73 from the Bouquet Canyon Bridge and Thoroughfare (B&T) District, and $254,614.35 from the Eastside B&T District; and 4) Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND On May 17, 2004, the City Clerk's office received bids for the project (see Bid Results). The lowest responsive bid was submitted by Security Paving Company, Inc. in the amount of $12,661,720.00. Staff recommends that the project be awarded to Security Paving Company, Inc., the lowest responsive bidder. Security Paving Company, Inc. possesses a State contractor's license and is in good standing with the State Contractor's License Board. The bid of $12,661,720.00 was reviewed for accuracy and conformance to the contract documents and was found to be complete. References were checked and indicated that this contractor has performed work that met their customers' goals. Construction of the proposed improvements to the Interchange project will relieve traffic congestion and promote public safety. The Interchange is a key component of the Cross Valley Connector, and one of the City Council's top priorities. Improvements include the widening of Soledad Canyon Road to accommodate a deceleration lane (westbound) and left -turn pocket (eastbound) onto Valley Center Drive. Valley Center Drive will be improved with a traffic signal and collector road to the Golden Valley Road bridge. The construction of this project is estimated to be completed by late summer of 2005. The City's General Plan Circulation Element identifies the ultimate roadway network for the buildout of the General Plan, which includes Golden Valley Road. This roadway is also identified in the B&T District and represents an important additional roadway link to improve travel within the City. The construction of Golden Valley Road calls for the development of an Intersection/Interchange project that crosses Soledad Canyon Road, and will eventually cross the Santa Clara River connecting to the future extension of Newhall Ranch Road. In November 1999, the City began the preliminary design and environmental assessment phase of the Interchange project. Through this process, four conceptual alignments for the Interchange project were analyzed to determine potential environmental and fiscal impacts in order to allow the City Council to make a final determination regarding the alignment of the proposed Interchange. Subsequent to this action, at the July 11, 2000 City Council meeting, Council adopted a resolution approving the Mitigated Negative Declaration prepared for the Interchange project, and directed staff to file a Notice of Determination. Additionally, City Council made a final determination on the design alternative and directed staff to proceed with the development of the second phase of the Interchange project, subject to the requirements of the California Environmental Quality Act (CEQA). ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT Funds for these expenditures in the total amount of $15,760,878.00 have been budgeted in Account Nos. S3005001 (General Fund), S3005109 (federal grant), 53005301 (Bouquet Canyon B&T), 53005302 (Eastside B&T), S3005303 (Via Princessa B&T), S3005360 (CFD 99-1 Santa Clarita Business Park), and S3005455 (developer fees) in the Fiscal Year 2003/2004 budget. ATTACHMENTS Bid Results Vicinity Map EXHIBIT "A" GOLDEN VALLEY ROAD/SOLEDAD CANYON ROAD INTERCHANGE PROJECT NO. S3005, FEDERAL STPL NO. 5450(024) AWARD OF CONSTRUCTION CONTRACT BID RESULTS COMPANY AMOUNT OFFICE LOCATION Security Paving Co., Inc. $12,661,720.00 Sun Valley, CA C.A. Rasmussen $14,626,913.11 Simi Valley, CA Engineering and Construction $15,936,515.00 Fontana, CA FBrutoco $15,653,921.17 Irvine, CA a Construction $14,846,121.95 Lake Forest, CA JR: 8:\tes\eng-6\s3005\c.net\0005exhibit a_ bid resu$s.dx i s � 1V. t l' N C _ co O Y/ CD O Q� M O O U� U pr A'I, 5 I i