HomeMy WebLinkAbout2004-02-10 - AGENDA REPORTS - REDEVELOPMENT AREA PLAN (2)NEW BUSINESS
DATE:
SUBJECT:
DEPARTMENT:
Agenda Item: a..6" 1
CITY OF SANTA CLARITA
REDEVELOPMENT AGENCY
AGENDA REPORT
City Manager Approval:
Item to be presented by:
February 10, 2004
Jill Fosselman
PROPOSED SPECIFIC PLAN FOR THE REDEVELOPMENT
AREA
City Manager
RECOMMENDED ACTION
Direct staff to prepare a Request for Proposal (RFP) for a Specific Plan for the Downtown
Newhall Area to include the following elements: vision and business plan, streetscape (including
traffic flow, parking plan, and master design), rezoning (including design guidelines) and an
environmental impact report (EIR).
BACKGROUND
As part of the fiscal year 2003-2004 budget process, the Newhall Redevelopment Committee
(NRC) prioritized funding for a streetscape plan for the downtown Newhall area as their number
one priority. In support of this priority, the Redevelopment Agency (Agency) approved a
2003-2004 budget appropriation in the amount of $365,000 to initiate the streetscape project,
which includes funding for traffic flow and parking plans, master design plans, and engineering
plans.
At the July 1, 2003 Study Session, the Council discussed ways in which to create an
environment that is conducive to enticing private investment to the Downtown Newhall Area.
The intent of the Study Session was to obtain Council direction to create alternative development
tools to implement the ideals of the Freedman Plan and to reaffirm the principles of the
Freedman Plan. The discussion recognized that a streetscape plan alone would not provide the
tools necessary to entice private investment into the area, and that rezoning would be necessary.
Based on the discussion, Council directed staff to develop a plan/process to clearly articulate the
vision, design guidelines, zoning, streetscape, parking, density, pedestrian, mixed-use, and
landscaping for the area (including a connection to the area's historical heritage) and bring it
back to the Agency for approval with a corresponding timeline and cost.
Over the summer, staff formulated a plan to develop a Specific Plan for the Downtown Newhall
area that would accomplish the goals desired by the City Council, as well as looked further into
how to effectively and appropriately incorporate the goals and the processes of the San Fernando
Road streetscape project with the Specific Plan. In addition, staff evaluated potential necessary
environmental studies based on the expanded scope of the streetscape project to ensure that the
comprehensive Specific Plan process would not be in jeopardy of an environmental challenge.
On September 15, 2003 Planning staff presented the proposed methodology to develop a Specific
Plan, the associated timeline and estimated costs to the NRC to obtain their input on the
proposed process. The NRC requested that the process be expedited as much as possible, and
wanted to ensure that projects and opportunities that arose during the Specific Plan process
would be addressed in a timely fashion. In addition, the NRC expressed interest in including
Lyons Avenue in the Specific Plan and process and sought to explore avenues to initiate design
and land use planning on Lyons Avenue. At the November 25, 2003 Agency meeting, the
Agency directed staff to explore expanding the special standards district in Newhall, including
the scope and purpose of the of the NRC. On January 6, 2004, the City Council provided
direction to staff on the scope of the Committee, and asked staff to explore the costs, timeline,
and NRC committee implications were the Newhall Specific Plan concept to include the Lyons
Avenue corridor. Based on the input received from the Council, Agency and NRC, staff revised
the plan and developed the proposal as presented in this agenda report.
Staff presented this proposal to the NRC at their February 2, 2004 meeting for review and input.
The NRC voted to support the staff plan and recommendation, and is eager to initiate the RFP
process.
Staff will work with the selected consultant(s), the NRC and the public to ensure that the
development of the plan will be consistent with the guiding principles of the Freedman Plan, One
Valley One Vision, the Beautification Master Plan, the Mayor's Committee on Managed Growth
and the City's Housing Element. The overall estimated timeline to complete the Specific Plan and
its required EIR is approximately 24 months. The proposed Specific Plan will contain the
following elements and phases:
Phase One: Phase One consists of two components that should be initiated simultaneously to
ensure consistency in design and desired outcomes -- a vision and business plan, and the
streetscape plan. The total timeline estimated for this phase is 12 months.
• Vision and Business Plan
Desired Outcome: Creation of a clearly articulated vision for the downtown area that
incorporates the principles of the Freedman Plan, the area's historical heritage, and a
corresponding business feasibility study to ensure that the vision is economically focused to
encourage development and private investment in the area. While the Freedman Plan
established the original vision for the area, there are currently multi -visions within the
community that need to be consolidated into a consensus for a final vision for the area that
will attract the desired private development and most feasible housing plan for the area.
Time Line: Six months
Estimated Cost: $100,000
Environmental: Evaluate the preparation of required environmental documents (what may or
may not be needed to ensure adequate environmental review of the entire process)
Streetscape Plan (to include three distinct components: traffic flow and parking plan, master
design plan and engineering plans)
Desired Outcome: Revised traffic and parking plans, a master design that includes public
improvements and pedestrian amenities and engineering plans for the project
Time Line: Six months for traffic and design plans, six months for engineering plans
Estimated Cost: $450,000 total to be allocated as follows: 1) $100,000 for the traffic and
parking plan, 2) $50,000 for the master design plan, and 3) $300,000 for engineering plans
Environmental: May require an Environmental Impact Report if major changes, such as
sewers, are made to San Fernando Road
Phase Two: Phase Two consists of rezoning the downtown Newhall area, including
development of design guidelines, and would begin as soon as the visioning plan is complete.
The total timeline estimated for this phase is 12 months.
• Rezoning
Desired Outcome: Development of a zoning overlay to include mixed use, density, floor area
ratios, housing, specific design guidelines, and a historic preservation element
Time Line: Twelve months
Estimated Cost: $250,000
Environmental: Most likely will require an EIR after the completion of the zoning plan
Phase Three: Assuming an EIR will be required, it should begin as soon as the draft Specific
Plan is completed (which includes the vision and business plan, streetscape plan, and rezoning).
• Environmental Impact Report
Desired Outcome: Complete the EIR, as necessary, to serve as an enticement for private
investment as it is a likely necessary step that will expedite development efforts in the area
Time Line: Nine months following completion of draft Specific Plan
Estimated Cost: $250,000
The proposed plan includes a reliance on professional contract assistance to meet the timeline
indicated. Conversely, preparation of the Specific Plan by mostly in-house staff with minimal
reliance on consultants would add approximately 12 months to the timeline (increasing the
overall project timeline from 24 to 36 months) with a corresponding reduction in cost of
approximately $100,000.
Inclusion of the development of a Specific Plan for the Lyons Avenue corridor with the
recommended Newhall Specific Plan process would add approximately 21 months to the timeline
and an additional cost of $450,000. If the Agency desires to initiate this process, staff believes
that additional representation on the NRC from specific Lyons Avenue stakeholders is essential.
Inclusion of the development of a Specific Plan for the currently excluded portions of San
Fernando Road with the recommended Newhall Specific Plan process would result in a similar
addition of 21 months and $450,000 to the project. If the Agency desires to initiate this process,
staff believes that specific representation on the NRC from San Fernando Road stakeholders
should be considered.
Due to the Council/Agency's interest in expediting the specific plans process as much as possible,
as well as the RDC's desire to expedite positive steps for Newhall, staff is recommending that the
specific plan only address the Downtown Newhall Area.
Staff will prepare the draft RFP and review it with both the City Council Sub -Committee on
Redevelopment and the NRC Specific Plan Subcommittee prior to finalizing and releasing the
RFP. Staff anticipates releasing the RFP to the public the first week of March 2004.
Staff will work with the City Council Sub -Committee on Redevelopment and with the NRC to
discuss project updates, next steps, public outreach and participation and key issues to insure
effective communication and collaboration with these bodies.
ALTERNATIVE ACTIONS:
1. Direct staff to initiate the Lyons Avenue Corridor Specific Plan with the initiation of the
Newhall Specific Plan ($450,000 additional funds will be needed).
2. Direct staff to initiate the San Fernando Road Specific Plan with the initiation of the Newhall
Specific Plan ($450,000 additional funds will be needed).
3. Direct staff to initiate both Lyons Avenue and San Fernando Road Specific Plans with the
initiation of the Newhall Specific Plan ($900,000 additional funds will be needed).
4. Other action as determined by the Council.
FISCAL IMPACT
There is no fiscal impact to drafting and releasing the RFP. Currently, $365,000 is allocated in
the 2003-2004 CIP budget for the San Fernando Road streetscape plan, which is sufficient to
fund both the 1) vision and business plan and the 2) traffic and master design plan. Staff will
request appropriation of funds for this project at the time of the awarding of the contract.
The anticipated cost for the completion of the Specific Plan and its required EIR may exceed
$1 million. No funding has been identified for this project. However, it is conceivable that future
tax increment may be available. San Fernando Road relinquishment funds are a possible funding
source for this project.
Vision and Business Plan $100,000
Streetscape Plan $450,000
Rezoning/Design Guidelines $250,000
Environmental Impact Report $250,000
Total Estimated Cost $1,050,000
Less Current Appropriation ($365,000)
Total NET Estimated Cost $685,000
ATTACHMENTS
GIS map of Redevelopment Area
Specific Plan Elements Timeline
L
C
O
E
a
N
N
L
d
c
O
E
E�
p
c
A
ILt
v
0
w
'$
E
E
N
aC
�-
N
A
L
d
2L
C
c
O
V
E
�
C
3
O
d
O
L
CL
a
CL
d� S I
d
,
d OO O
d p N
:2U
O
3 U {Up1 'p0
U
`O_�E
m
E
EE
o
L
N M L
W H W c W
w 0 W
W W
1171
CL
loot
It
in
to W IT
P°
9
Y
111 7 •� _
.m
✓ P u N
i \`�'J _��°� ff w�"' ���tr. �� SVA � • •
ff is � �a����� 'a` li��� � �� � " �J���1��•�'� � ��
tr! ♦ a .�P♦ �� c is 1 __ E ` ..
tiI'��� F, � � � • moi. �.J-, ......
ti`s 8
�j� �Jlf./f��`Im'�� P", i�Y O � 1/'t.l•' b,� ;' � ... ��� Z� �� a��