HomeMy WebLinkAbout2004-10-12 - AGENDA REPORTS - TM 53901 FM APPR FINAL MAP (3)Agenda Item: _ 7
CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR City Manager Approval:
Item to be presented by: Christopher Price
DATE: October 12, 2004
SUBJECT: TRACT MAP NO. 53901 (CREEKSIDE, NORTH VALENCIA H
ANNEXATION) - APPROVAL OF FINAL MAP AND
ACCEPTANCE OF OFFERS OF DEDICATION
DEPARTMENT: Transportation and Engineering Services
RECOMMENDED ACTION
1) City Council approve Tract Map No. 53901 (Creekside, North Valencia H Annexation);
2) Accept on behalf of the public the offers of dedication for public use, the right to restrict direct
vehicular ingress and egress to McBean Parkway, the easements for covered storm drain,
appurtenant structures, ingress and egress purposes, the easements for sanitary sewers and
sanitary sewer ingress and egress purposes, all sanitary sewers and appurtenant structures, the
right to prohibit the erection or construction of any buildings or structures within
Lots 72 through 83 as private driveway and fire lane or private streets and Lots 84 through 97
designated as open space/recreation, except for recreational facilities and appurtenant
structures, and the easements for landscape maintenance purposes;
3) Make findings as follows: (a) that this project is consistent with the provisions of
Sections 66474 and 66474.1 of the Subdivision Map Act and should be approved, and (b) that
this proposed subdivision, together with the provisions for this design and improvement, is
consistent with the General Plan required by Article 5 (commencing with Section 65300) of
Chapter 3 of Division I of the Government Code, or any specific plan adopted pursuant to
Article 8 (commencing with Section 65450) of Chapter 3 of Division I of the Government
Code;
4) Instruct the City Treasurer to endorse the Special Assessment Certificate on the face of Tract
Map No. 53901, which indicates that all special assessments levied by the City have been
paid; and
5) Instruct the City Clerk to endorse the Certificate on the face of Tract Map No. 53901, which
embodies the approval of said map and the acceptance of the dedications shown thereon.
BACKGROUND
Tract Map No. 53901 (Creekside, North Valencia fl Annexation) is the last phase of Substantial
Conformance Map, Tract Map No. 53901, which was deemed to be in substantial conformance
with the principles and standards required by the Unified Development Code and North
Valencia R Specific Plan, and approved by the Planning staff on November 17, 2002. This
phase, consisting of approximately 10.99 acres, is located west of McBean Parkway, between
Copper Ell Drive and the existing Skycrest Development, and is owned by Hidden Creek
Village, Limited Liability Company.
This map is a subdivision of Lot 2 of Tract Map No. 44831-02 and is creating 98 lots (71 single
family residential lots, 1 private street lot, 8 private driveway and fire lane lots, and 18 open
space lots). Water lights have been secured for all lots. Trail requirements are being met by the
construction of a Class I bike trail along the eastern edge of San Francisquito Creek, an 8 -foot
paseo along the project's frontage on Copper Hill Drive, a 10 -foot paseo along the project's
frontage, an interior 8 -foot wide paseo through the property linking the development with the
10 -foot wide paseo on McBean Parkway and to the three access points along the river trail, and
the dedication of easements to the City. The Quimby requirement has been fully satisfied by the
dedication of a 17.6 -acre public park, a 1.6 -acre private park, a 1.5 -acre private park, and other
private recreation facilities in accordance with the North Valencia R Development Agreement.
Bridge and Thoroughfare fees totaling $776,030.00 (per current Valencia B&T District fees)
shall be paid at building permit issuance, as stipulated in the Conditions of Approval.
The conditions set by the Planning staff have been met and fees have been paid as indicated on
the attached Fact Sheet. The map has been checked to the satisfaction of the City Engineer and is
ready for City Council approval and acceptance of the dedications.
ALTERNATIVE ACTIONS
Staff has not identified any alternative actions that would conform to requirements set forth in the
Subdivision Map Act.
FISCAL IMPACT
The developer is contributing the following amounts for the purposes described (refer to the
attached Fact Sheet for details):
Bridge and Thoroughfare Fees (Valencia District): $776,030.00
Transit Mitigation Fee: $14,200.00
Quimby Fee:
ATTACHMENTS
Fact Sheet
Vicinity Map
Parkland Dedication
FACTSHEET
Location: West of McBean Parkway, between Copper Hill Drive and the existing
Skycrest Development.
Acreage: Approximately 10.99 acres.
Number of Lots: 98.
Use: 71 single family residential lots, I private street lot, 8 private driveway and
fire lane lots, and 18 open space lots.
Owner: Hidden Creek Village, Limited Liability Company.
Trails/Paseos: Trail requirements are being met by the construction of a Class I bike trail
along the eastern edge of San Francisquito Creek, an 8 -foot paseo along the
project's frontage on Copper Hill Drive, a 10 -foot paseo along the project's
frontage, an interior 8 -foot wide pasec, through the property linking the
development with the 10 -foot wide paseo on McBean Parkway and to the
three access points along the river trail, and the dedication of easements to the
City.
Streets: This map is not creating any new public streets. All streets are private streets.
B&T Fee: Fees totaling $776,030.00 (per current Valencia B&T District fees) for
71 single family residential units shall be paid at building permit issuance, in
conformance with the Development Agreement.
Transit Fee: Fees totaling $14,200.00 (per current fees) for 71 single famfly residential
units shall be paid at building permit issuance, as stipulated in the Conditions
of Approval.
Quimby Fee: The Quimby requirement has been fully satisfied by the dedication of a
17.6 -acre public park, 1.6 -acre private park, 1.5 -acre private park, and other
private recreation facilities in accordance with the North Valencia H
Development Agreement.
School Fees: All appropriate school fees will be paid at the time of building permits.
HH:twb
counciM3901 fact sheet.dm
HIDDEN CREEK
BELCARO
TRACT NO. 53901
1-71 RESIDEN77AL LOTS
72- 79 PDFL
80 POPLAR WEW COURT (PRIVA 7E)
81-98 OPEN SPACE
LOT 4
'ACINITY MAP
W SCALE
T.G. 4-460—F4
LOT 23
LOT
LOT .
LOT
LOT 11
'Ol
LOT 11
LOT I
LOT 26 (OPS� 5AA
LOT
(�CN �AC�)
LOT 2 or .1
\101 2 LOT �l
LOT 21 L T 3
L T LOT 3
LOT
Vl-�� -A-)
PACIFIC CIVIL, INC.
'�"7-AZ
9 1 so I
(4;4) 865-41,68
(a a) 465� to
I TIA
L 11
WT 11
I.T 16
66
ILT I
OT
LO 20 41
LOT 26 (OPS� 5AA
LOT
(�CN �AC�)
LOT 2 or .1
\101 2 LOT �l
LOT 21 L T 3
L T LOT 3
LOT
Vl-�� -A-)
PACIFIC CIVIL, INC.
'�"7-AZ
9 1 so I
(4;4) 865-41,68
(a a) 465� to