Loading...
HomeMy WebLinkAbout2005-01-11 - AGENDA REPORTS - FY 2004-2005 CURB GUTTER CONTR (2)Agenda Item: — CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR City Manager Approval: Item to be presented by: Curtis Nay DATE: January 11, 2005 SUBJECT: FISCAL YEAR 2004-2005 REMOVAL AND REPLACEMENT OF SIDEWALK, CURB AND GUTTER, ACCESS RAMPS, AND MEDIAN MODIFICATION — PROJECT NOS. M0042, M0043, T0022, AND C0023 — AWARD OF CONSTRUCTION CONTRACT DEPARTMENT: Building and Engineering RECOMMENDED ACTION City Council award the construction contract for Fiscal Year 2004-2005 Concrete Rehabilitation Program, Project Nos. M0042, M0043, T0022, and C0023 to Kalban, Inc. in the amount of $409,658.00; authorize a 10 percent contingency in the amount of $40,965.80; and authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND This project will upgrade the City's sidewalk system and replace existing concrete pads damaged by tree root infiltration. In addition to various sidewalk improvements, the curb and gutter program will improve drainage flow into local storm drains, thereby improving stormwater quality and minimizing street erosion. The Access Ramp Program will serve our disabled community through the installation of new ramps, while meeting the requirements outlined in Title 21 of the Americans with Disabilities Act (ADA). This year's program will also include modifications to identified medians to improve traffic flow. The contracts for these projects are being combined to most efficiently use the available funding. The list of locations (Exhibit "A") was generated by residents' requests to the Field Services and Building & Engineering Departments, or were areas identified by City staff as needing restoration. APPROWED Substantial constraints and controls have been established in the construction documents to reduce potential impacts on local traffic and homeowners during the construction phase. Construction is scheduled to start in late January 2005 and is anticipated to be completed within 75 working days after the effective date of the Notice to Proceed. Staff will appoint inspectors to ensure proper work performance by the contractor and to handle daily field issues. On November 29, 2004, staff was directed by the Director of Building and Engineering to authorize the advertisement for construction bids. On December 27, 2004, the City Clerk's office received bids for the project (Exhibit "B"). The lowest responsive bid was submitted by Kalban, Inc. in the amount of $409,658.00. The Engineer's Estimate for the project construction is $350,000.00. Staff recommends that the project be awarded to Kalban, Inc., the lowest responsive bidder. Kalban, Inc. possesses a state Contractor's License and is in good standing with the State Contractor's License Board. Kalban, Inc. has executed previous capital improvement projects with the City and has provided quality service with reasonable construction impact. The bid from Kalban, Inc. in the amount of $409,658.00 was reviewed for accuracy and conformance to the contract documents and was found to be complete. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT Funds for these combined projects have been approved and budgeted in Account Nos. M0042201, M0043456, T0022201, and C0023001 for Fiscal Year 2004-2005 in the amount of $455,000.00. These funds are available in the following designated accounts: Proiects Median Modification Sidewalk Repair Program Stormwater Flowline Repair Access Ramp Construction ATTACHMENTS Exhibit "A" - List of Locations Exhibit "B" - Bid Results Available Fiscal Year Account Nos. Funds 2004-2005 C0023001 $ 80,000.00 2004-2005 M0042201 225,000.00 2004-2005 M0043456 75,000.00 2004-2005 T0022201 $ 75,000.00 Total Budget Amount: $455,000.00 EXHIBIT "A" ANNUAL CONCRETE REHABILITATION PROGRAM PROJECT NOS. M0043, M0042, T0022 AND C0023 STORM WATER FLOWLINE REPAIR PROJECT (M0043): Region Location Cyn. Cou. Pamala Dr. at Emmet Rd. Saugus Tothill Saugus Calwood Valencia Ivrea Place Cyn. Cou. Little Cedar Way Newhall Newhall Ave Cyn. Cou. La Veda Cyn. Cou. La Veda Cyn. Cou. Via Princessa Median Cyn. Cou. Mountain Dale Ct. Cyn. Cou. Honby Ave Valencia Mc Bean Ave Cyn. Cou. Meadowcreek Rd. Newhall Green Mill Ave Newhall Via Dolarita Saugus Arriola Ave, Saugus Poplar Glen Cir. Newhall Via Barra Valencia Nottingham Ct. Cyn. Cou. Fairweather St. Cyn. Cou. Babington Cyn. Cou. Goodvale Rd. Saugus Calhaven Saugus Barbacoa Dr. Saugus Kristin Lane SIDEWALK REPAIR PROJECT (MOO42) Saugus Espuella Dr. Saugus Arriola Dr. Saugus Alaminos Dr. Newhall Adamsboro Dr. Newhall Diasetta Dr. Saugus Fourl Rd. Cyn. Cou. Bannerman Cyn. Cou. Cedar Valley Wy. Cyn. Cou. Friendly Valley Pkwy. Cyn. Cou. Gimlet Cyn. Cou. Torrey Pines Saugus Santa Clarita Rd Saugus Altena Drive Saugus Cedar Falls Dr. Saugus Kingscrest Dr. Cyn. Cou. Almond Rd. Cyn. Cou. Ermine Rd Cyn. Cou. Florabunda Dr. Cyn. Cou. Meadow Creek Newhall 23716 Rotunda Newhall 23725 Rotunda S:\Tes\ENG-CIVI\concrete-0405\ljst of locations for council agenda.xls EXHIBIT "All ANNUAL CONCRETE REHABILITATION PROGRAM PROJECT NOS. M0043, M0042, T0022 AND C0023 SIDEWALK REPAIR PROJECT (M0042) Cont.: Valencia 24158 Tossano Cyn. Cou. 19266 Abdale Valencia 24053 Regents Park Cir. Cyn. Cou. 26503 Hillsfall Court Saugus 22453 Guadilamar Dr. Cyn. Cou. 20451 Delight St. Cyn. Cou. 20444 Delight St. Cyn. Cou. 27838 Northbrook Valencia 28425 Briar Ct. Cyn. Cou. 19136 Stillmore Cyn. Cou. 19118 Stillmore Cyn. Cou. 27902 Oakgale Saugus 26690 Bouquet Cyn. Rd Saugus 28859 Bouquet Cyn. Rd Saugus Rosedell Dr. & Urbandale Ave. Cyn. Cou. 20444 Delight St. Cyn. Cou. 27838 Northbrook Valencia 28425 Briar Ct. Cyn. Cou. 19136 Stillmore Cyn. Cou. 19118 Stillmore Cyn. Cou. 27902 Oakgale Saugus 26690 Bouquet Cyn. Rd Saugus 28859 Bouquet Cyn. Rd Saugus Rosedell Dr. & Urbandale Ave. HANDICAPPED ACCESS RAMP PROJECT (T0022) Region Location No. Of Ramps Cyn. Cou. Sierra Hwy./Jakes Wy. 1 Saugus Paraguay and Diaz 2 Saugus Los Tigres and Diaz 4 Cyn. Cou. Friendly Valley/ Abadale St. 2 Cyn. Cou. Abdale St./Fairgate Ave. 2 Cyn. Cou. Abdale St./Beachgrove. 2 Cyn. Cou. Friendly Valley/Sierra Estates 3 Cyn. Cou. Sierra Estates/ Fairgate Ave 4 Cyn. Cou. Sierra Estates/Gimlet 2 Cyn. Cou. Ranier/Crosspath 4 Cyn. Cou. Eveningshade/Cedarcreek I Cyn. Cou. Eveningshade/Four Oaks 3 Cyn. Cou. Cedarcreek/Esterbrook Ave. 2 Cyn. Cou. Crosspath/Four Oaks 2 Cyn. Cou. Esterbrook Ave./Newhouse St. 4 Cyn. Cou. Esterbrook Ave./Delight st. 3 Cyn. Cou. Crosspath/Cedarcreek 2 Cyn. Cou. 27838 Northbrook, 2 Cyn. Cou. 27902 Oakgale/Ermine 2 Cyn. Cou. 28003 Meadow Creek 2 Newhall 116th St / Avenida Ignacio 2 MEDIAN CURB MODIFICATION PROJECT (CO023): Region Location Valencia McBean Pkwy & Arroyo Pk. Dr S:\Tes\ENG-CIVI\concrete-0405\list of locations for council agenda.xls EXHIBIT "B" FISCAL YEAR 2004-2005 ANNUAL CONCRETE REHABILITATION PROGRAM (CITYWIDE) PROJECT NOS. M0042, M00439 T0022 AND C0023 AWARD OF CONSTRUCTION CONTRACT BID RESULTS COMPANY AMOUNT OFFICE LOCATION Kalban Inc. $409,658.00 Sun Valley, CA Dial Const. $497,593.50 Simi Valley, CA Nye & Nelson, Inc. $579,547.00 Ventura, CA JR: s: \ws\en�dvi\wn�a��05 �..hibft b -bid remlts.dw