CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR City Manager Approval:
Item to be presented by: Curtis Nay
DATE: April 26, 2005
SUBJECT: GOLDEN VALLEY ROAD BRIDGE OVER SANTA CLARA
RIVER, PROJECT NO. S4013 - AWARD DESIGN CONTRACT
DEPARTMENT: Building and Engineering
RECOMMENDED ACTION
City Council award the design contract to Dokken Engineering for the preparation of Plans,
Specification, and Estimate (PS&E) package for construction of the Golden Valley Road Bridge
over Santa Clara River, Project No. S4013, in the amount of $911,627.00, and authorize a
15 percent contingency expenditure in the amount of $136,744.00; authorize the City Manager or
designee to execute all documents, subject to City Attorney approval; increase Revenue Account
No. 301-6714 by $2,000,000.00; appropriate $2,000,000.00 to Account No. S4013301-8001; and
,authorize the transfer of $1,300,000.00 from S4003109-8001 to S4013109-8001 for future bridge
construction costs.
BACKGROUND
The Circulation Element of the City's General Plan identifies the ultimate roadway network for
build out of the General Plan. This network includes Golden Valley Road. This roadway is also
identified in the Bridge and Thoroughfare (B&T) District and represents an important additional
roadway link to improve travel within the City. The Golden Valley Road Bridge over Santa
Clara River consists of the construction of a six -lane roadway. This bridge will connect the
future extension of Newhall Ranch Road to the Golden Valley Road/Soledad Canyon Road
Interchange.
This bridge, over the Santa Clara River, is part of the Cross Valley Connector that needs to be
constructed independent of the River Park project. It is the link that will connect the Cross
Valley Connector south of the river to the north of the river, thus allowing the north -south
connection.
APPROVED
On February 24, 2005, the Building and Engineering Department received proposals for the
preparation of the PS&E for the Golden Valley Road Bridge over the Santa Clara River from the
following five consultants:
Comoanv Location
Dokken Engineering
T.Y. Lin International
Willdan
Tetra Tech, Inc.
Parsons Brinckerhoff
Rancho Cordova, CA
Riverside, CA
Foothill Ranch, CA
Irvine, CA
Los Angeles, CA
On March 14, 2005, interviews were conducted with each listed consultant. Based on technical
qualification and methodology for the project, staff recommends that Dokken Engineering be
awarded the design contract for the project. This consulting firm has performed similar bridge
design projects for the City and other local agencies in Southern California.
ALTERNATIVE ACTIONS
1. Postpone award of the design contract. Delays in the design may impact the completion date
of the Cross Valley Connector project.
2. Other action as determined by the City Council.
FISCAL IMPACT
There is no fiscal impact to the City. The County of Los Angeles has issued a warrant in the
amount of $2,000,000.00 to the City for bridge design costs.
ATTACHMENTS
Warrant Authorization from the County of Los Angeles
Location Map
February 7, 2005
COUNTY OF LOS ANGELES
DEPARTMENT OF PU13LIC WORKS
'To Enrich Lives Through Effective and Caring Service'
900 SOUTH FREMONT AVENUE
ALHAMBRA. CALIFORNIA 91803.1331
Talephm: (624) 458-5100
www.(adpw.org
ADDRESS ALL CORRESPONDENCE To:
P.O. BOX 1460
ALHAAB3RA, CALIFORNIA 918021460
IN REPLY PLEASE
REPER TO PILE LD -4
Mr. Robert Newman
Director of Building and Engineering FC
City of Santa Clarita
23920 West Valencia Boulevard, Suite 300
Santa Clarita, CA 91355-2196 TES, fe473�n,,
Dear Mr. Newman:
,.ADO,, fs nn cesenl
rre °ea
FUNDING FOR GOLDEN VALLEY ROAD -RIVER BRIDGE DESIGN.
This is in response to your December 8, 2004, letter requesting $2 million from the
County's Bouquet Canyon Bridge and Major Thoroughfare District fund for the proposed
Golden Valley Road River Bridge project. Based on our current funding situation, the
County is able to provide the requested amount. A warrant for the amount of $2 million
from the district fund will be issued to your City within a month.
We look forward to continuing cooperation with your City to assist in completing this
regional transportation project. If you have any questions regarding the subject matter,
please contact Mr. Bary S. Witler of Land Development Division at (626)458-4351
Very truly yours,
DONALD L. WOLFE
Acting Director,of.Public Works
BRIAN T. SASAKI
Deputy Director
4
pr -
JKC:ca
P:Vd9ub1TRANSPLAMChin=LDENVALLEY ERIDGEDESIGN.doc
cc: City of Santa Clarita (Hoon Hahn)
Y
4�1
...... ... ..
MIN
C4
6 ag CD
K9
C/) <
0
CD
0
Cl)
CL
CD
5F