HomeMy WebLinkAbout2005-04-26 - AGENDA REPORTS - GVR BRIDGE PROJ S4013 CONTR (2)Agenda Item: �r CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR City Manager Approval: Item to be presented by: Curtis Nay DATE: April 26, 2005 SUBJECT: GOLDEN VALLEY ROAD BRIDGE OVER SANTA CLARA RIVER, PROJECT NO. S4013 - AWARD DESIGN CONTRACT DEPARTMENT: Building and Engineering RECOMMENDED ACTION City Council award the design contract to Dokken Engineering for the preparation of Plans, Specification, and Estimate (PS&E) package for construction of the Golden Valley Road Bridge over Santa Clara River, Project No. S4013, in the amount of $911,627.00, and authorize a 15 percent contingency expenditure in the amount of $136,744.00; authorize the City Manager or designee to execute all documents, subject to City Attorney approval; increase Revenue Account No. 301-6714 by $2,000,000.00; appropriate $2,000,000.00 to Account No. S4013301-8001; and ,authorize the transfer of $1,300,000.00 from S4003109-8001 to S4013109-8001 for future bridge construction costs. BACKGROUND The Circulation Element of the City's General Plan identifies the ultimate roadway network for build out of the General Plan. This network includes Golden Valley Road. This roadway is also identified in the Bridge and Thoroughfare (B&T) District and represents an important additional roadway link to improve travel within the City. The Golden Valley Road Bridge over Santa Clara River consists of the construction of a six -lane roadway. This bridge will connect the future extension of Newhall Ranch Road to the Golden Valley Road/Soledad Canyon Road Interchange. This bridge, over the Santa Clara River, is part of the Cross Valley Connector that needs to be constructed independent of the River Park project. It is the link that will connect the Cross Valley Connector south of the river to the north of the river, thus allowing the north -south connection. APPROVED On February 24, 2005, the Building and Engineering Department received proposals for the preparation of the PS&E for the Golden Valley Road Bridge over the Santa Clara River from the following five consultants: Comoanv Location Dokken Engineering T.Y. Lin International Willdan Tetra Tech, Inc. Parsons Brinckerhoff Rancho Cordova, CA Riverside, CA Foothill Ranch, CA Irvine, CA Los Angeles, CA On March 14, 2005, interviews were conducted with each listed consultant. Based on technical qualification and methodology for the project, staff recommends that Dokken Engineering be awarded the design contract for the project. This consulting firm has performed similar bridge design projects for the City and other local agencies in Southern California. ALTERNATIVE ACTIONS 1. Postpone award of the design contract. Delays in the design may impact the completion date of the Cross Valley Connector project. 2. Other action as determined by the City Council. FISCAL IMPACT There is no fiscal impact to the City. The County of Los Angeles has issued a warrant in the amount of $2,000,000.00 to the City for bridge design costs. ATTACHMENTS Warrant Authorization from the County of Los Angeles Location Map February 7, 2005 COUNTY OF LOS ANGELES DEPARTMENT OF PU13LIC WORKS 'To Enrich Lives Through Effective and Caring Service' 900 SOUTH FREMONT AVENUE ALHAMBRA. CALIFORNIA 91803.1331 Talephm: (624) 458-5100 www.(adpw.org ADDRESS ALL CORRESPONDENCE To: P.O. BOX 1460 ALHAAB3RA, CALIFORNIA 918021460 IN REPLY PLEASE REPER TO PILE LD -4 Mr. Robert Newman Director of Building and Engineering FC City of Santa Clarita 23920 West Valencia Boulevard, Suite 300 Santa Clarita, CA 91355-2196 TES, fe473�n,, Dear Mr. Newman: ,.ADO,, fs nn cesenl rre °ea FUNDING FOR GOLDEN VALLEY ROAD -RIVER BRIDGE DESIGN. This is in response to your December 8, 2004, letter requesting $2 million from the County's Bouquet Canyon Bridge and Major Thoroughfare District fund for the proposed Golden Valley Road River Bridge project. Based on our current funding situation, the County is able to provide the requested amount. A warrant for the amount of $2 million from the district fund will be issued to your City within a month. We look forward to continuing cooperation with your City to assist in completing this regional transportation project. If you have any questions regarding the subject matter, please contact Mr. Bary S. Witler of Land Development Division at (626)458-4351 Very truly yours, DONALD L. WOLFE Acting Director,of.Public Works BRIAN T. SASAKI Deputy Director 4 pr - JKC:ca P:Vd9ub1TRANSPLAMChin=LDENVALLEY ERIDGEDESIGN.doc cc: City of Santa Clarita (Hoon Hahn) Y 4�1 ...... ... .. MIN C4 6 ag CD K9 C/) < 0 CD 0 Cl) CL CD 5F