Loading...
HomeMy WebLinkAbout2005-11-22 - AGENDA REPORTS - PLAYGROUND EQUIP CONTR M0045 (2)CONSENT CALENDAR DATE: SUBJECT: DEPARTMENT: Agenda Item: 14 CITY OF SANTA CLARITA AGENDA REPORT City Manager Approval: Item to be presented by: November 22, 2005 PLAYGROUND EQUIPMENT UPGRADES - PROJECT NUMBER: M0045 - AWARD CONSTRUCTION CONTRACT Parks, Recreation, and Community Services RECOMMENDED ACTION City Council approve the appropriation of $30,000 from Council Contingency Account Number 2250-7401 to Account Number M0045001-8001 (Playground Equipment Upgrades Project M0045) to fully fund the project with a 10% contingency. Award construction contract to John Burgeson Contractors, Inc., in the amount of $237,119, and authorize a 10% contingency in the amount of $ 23,712 from Account Number M0045001-8001. Authorize the City Manager, or designee, to execute all documents, subject to City Attorney approval. Authorize staff to recognize $25,000 in estimated revenues in Account Number 453-5112 and appropriate $25,000 to Account Number M0045453-8001 to properly account for the California Integrated Waste Management Board Grant. BACKGROUND This project comprises three components of improvements; play equipment renovation, a shade canopy installation, and two park sign installations. The play equipment at Santa Clarita.Park and Valencia Glen Park no longer meets the current Americans with Disabilities Act (ADA) requirements and the Consumer Product Safety Commission (CPSC) standards for public playgrounds. The existing play areas will be replaced with new play equipment, silica sand, and rubberized surfacing materials. In July 2005, the City received a $25,000 grant for this project from the California Integrated Waste Management Board (CIWMB) for playground surfacing under the Waste Tire Playground Cover Grant Program. Allocation of this grant is included in the recommended action. As part of the public participation process for the playground design at Santa Clarita Park, staff met with the Saugus Action Committee (SAC) and the Arts and Events staff to receive feedback. Staff received very strong input from the SAC to retain the "robot" at Santa Clarita Park. Due to the current Americans with Disabilities Act requirements and the Consumer Product Safety Commission standards for public playgrounds, the City is required to take the robot out of service as a piece of play equipment. In October 2005, staff returned to SAC with a design to retain the robot as a form of art in the park and it was acceptable to the committee. The project budget will incorporate the robot as a piece of artwork in the park. Access to the robot's slides will be sealed up and the structure will be surrounded with a concrete seatwall, landscaping, and irrigation. An identification placard to explain the history of the robot at Santa Clarita Park will be added. Further, this project will also address two projects identified in the 2005 Parks, Recreation, and Community Services Commission priorities: the annual playground shade program, and the installation of the park monument signs. Therefore, Pamplico Park play area will be retrofitted with a shade canopy and monument signs will be installed at Santa Clarita and Newhall Parks as part of this project. The following is a list of the three bids received with regard to this project: Contractor John Burgeson Contractors, Inc., Santa Clarita Thomsen Landscape, Reseda Malibu Pacific Tennis Courts, Inc., Westlake ALTERNATIVE ACTION Other action as determined by City Council. FISCAL IMPACT Total Base Bid Amount $ 237,118.86 $ 273,993.75 $ 329,712.00 The City Council Contingency Fund balance is $714,677. Transfer funds in the amount of $30,000 from Council Contingency Fund Account Number 2250-7401 to Account Number M0045-001-8001. Recognize $25,000 in estimated revenues in Account Number 453-5112 and appropriate $25,000 to Account Number M0045-453-8001 to properly account for the California Integrated Waste Management Board Grant. Funds for this expenditure have been budgeted in the Fiscal Year 2005-06 budget. Funds for the remainder of this expenditure have been budgeted in the Fiscal Year 2005-06 budget in M045-001-8001. ATTACHMENTS Playground Equipment Upgrades Location Map