HomeMy WebLinkAbout2005-01-25 - AGENDA REPORTS - RIVERPARK PROJ (2)PUBLIC HEARING
DATE:
SU13JECT:
DEPARTMENT:
Agenda Item: —41
W W
CITY OF SANTA CLARITA
AGENDA REPORT
City Manager Approval:
Item to be presented by:
January 25, 2005
RIVERPARK PROJECT
Planning and Economic Development
RECOMMENDED ACTION
City Council receive the staff report; open the public hearing for testimony; provide direction to
staff on project related issues; and continue the public hearing to the March 22, 2005 City
Council Meeting.
BACKGROUND
APPLICATION
In 2002, Newhall Land (herein referred to as the "applicant" and the owner of the property)
submitted an application for a General Plan amendment, zone change, tentative tract map,
conditional use permit, hillside review permit, an oak tree permit and an adjustment to subdivide
695.4 acres into 545 lots consisting of 439 single family dwellings, 744 multi -family units, two
commercial parcels and lots for parks, utilities, roadways, and open space.
Staff processed the application which included several development review committee meetings
with City staff and 11 Planning Commission meetings (included nine public hearings) that went
from March 2, 2004 to December 21, 2004.
CURRENT PROJECT DESCRIPTION
Substantial revisions have been made to the project as a result of comments from public
agencies, members of the public, and the Planning Commissioners. A complete description of
the project as currently proposed is set forth on Attachment A, Project Description, attached to
this report. A summary of the current project and entitlements is set forth below.
Winum To.,AZL",?,� 2 , ��
CURRENT PROJECT SUMMARY
The project now proposes the development of 1,123 dwelling units (reduced from the 1,183
originally proposed), together with related infrastructure, including 419 detached single-family
dwellings located in Areas A-1, A-2 and B, and 704 multi -family units including 380 for -sale
condominiums or townhouses on three lots in Area C (northeastern portion of the site), and 324
apartments on two lots in Area D (northwestern portion of the site behind the existing Von's
shopping center on Bouquet Canyon Road). The streets in Areas A-1, B and C would be private
and gated, but built to City standards. A portion of Santa Clarita Parkway (one traffic lane in
each direction with enhanced landscaping in the remaining right-of-way) would be built as part
of the project, and would divide Areas A-2 and B.
The project also proposes an approximately one -acre commercial site (reduced from 3 acres)
generally located at the southeast comer of Newhall Ranch Road and Bouquet Canyon Road,
with a maximum of 16,000 square feet of general commercial -type uses (i.e., retail, restaurant
establishments), together with related infrastructure.
At build -out, the project would necessitate the extension of Newhall Ranch Road, including the
Newhall Ranch Road/Golden Valley Road Bridge, to the Soledad Canyon Road flyover. This
extension would complete the Cross Valley Connector, and the applicant would contribute,
through right-of-way dedication and bridge and thoroughfare fees, nearly $24,000,000 to this
segment of the Cross Valley Connector. Based upon the project's traffic study, the project would
be allowed to occupy up to 500 units prior to the extension of Newhall Ranch Road to the
Soledad Canyon Road flyover.
The project also proposes a 29 -acre active/passive park (located between Areas A- I and A-2 and
abutting the Santa Clara River) that would be dedicated to the City, three primary private
recreational facilities (one each in Areas A-1, C, and D), and four secondary private recreational
lots (two in Area A- I and two in Area B). The project would include a public trail system that
would connect the Class I trail along Newhall Ranch Road to the Santa Clara River Trail. Within
the project, the Santa Clara River Trail would consist of a 12 -foot equestrian trail, a four -foot
pedestrian trail, and a 12 -foot Class I bike lane with a minimum of 7 feet of landscaping. Three
of the four secondary private recreation lots would also provide connections to the City-wide trail
system.
In addition, the project includes buried bank stabilization, and erosion or toe protection, to
protect Newhall Ranch Road and the residential and commercial areas. Implementation of the
project would result in the removal of 17 oak trees, 14 of which would be relocated on-site,
primarily within the passive portion of the 29 -acre active/passive park, and 3 encroachments. A
majority of the project development would occur outside of the existing Significant Ecological
Area (SEA) boundaries with the exception of a portion of the residential development in Area
A-2 , graded slopes within A-2, and B, as well as portions of the bank stabilization, toe or
erosion projection, proposed trails and portions of the Newhall Ranch Road, including all of the
Newhall Ranch Road/Golden Valley Road Bridge and associated piers and abutments. Project
site grading would require the movement of approximately 9.1 million cubic yards of earth,
which would be balanced on site. Approximately 3.6 million cubic yards of the 9.1 million cubic
yards will consist of remedial grading.
The project now proposes preservation of approximately 350 acres (increased from 330 acres) of
the Santa Clara River and adjacent upland areas predominately in its natural state. In addition,
the project applicant has agreed to dedicate approximately 130 acres of the South Fork of the
Santa Clara River and open space on-site adjacent to Central Park.
CURRENT ENTITLEMENT SUMMAR Y
General Plan Amendment
The applicant is proposing a general plan amendment to accommodate the project's design layout
of residential units, commercial uses, and open space. Currently, the General Plan designations
for the project site are RM (Residential Moderate), IC (hidustrial Commercial), CC (Community
Commercial), CO(SEA, VCQ (Commercial Office with an Significant Ecological Area overlay
and Valley Center Concept designation), and CC(VCQ (Conummity Commercial with a Valley
Center Concept designation). These general plan designations would allow approximately
3,000,000 to 13,000,000 square feet of commercial square footage (with some of that industrial
for the IC designation) and roughly 3,000 to 15,000 dwelling units without considering any of the
on site constraints.
The applicant's proposal consists of changing the general plan designations to RM(SEA, VCQ
and CC(VCQ which would allow, without considering any of the site constraints, 7,616
dwelling units (I I dwelling units per acre) and approximately 49,000 commercial square feet.
The applicant is proposing 1,123 dwelling units and 16,000 commercial square feet. In either
case, the Riverpark project is well below what could be permitted by the City's General Plan and
the applicant's proposed General Plan amendment.
The applicant is also proposing to maintain the SEA and VCC overlay designations that already
exist on the site. The SEA overlay would extend over the Santa Clara River, as that overlay is
currently shown on the General Plan map.
The existing VCC designation would also be adjusted to include only the residential and
commercial areas of the project, and to exclude the Santa Clara River.
The proposed General Plan Amendment also includes defining the specific alignments for Santa
Clarita Parkway and Newhall Ranch Road as shown on Vesting Tentative Tract Map 53425.
Zone Chan
A zone change is being requested by the applicant to amend the zoning designations of the site
from RM, IC, CO(PD), CC(PD), CC, and MHP to RM(PD) and CQPD) [are these correct?].
The applicant is proposing the amendment to be consistent with the General Plan Amendment
and to accommodate the project's design layout of residential units, commercial uses, and open
space. The existing zoning designations using the Hillside Ordinance's average cross slope
density calculations (average cross slope of the entire project site is 14.8 %) would allow
approximately 3,023 dwelling units, 3,400,000 commercial square feet, and 500,000 industrial
square feet.
The applicant's proposal consists of changing the zoning designations to RM(PD) and CQPD).
The RM(PD) designation would allow (using the Hillside Ordinance's average cross slope
density calculations) up to 6,667 dwelling units. The CQPD) designation would allow (not
using the Hillside Ordinance, as the proposed three acres are flat) approximately 49,000
commercial square feet. As noted, the applicant is proposing 1,123 dwelling units and 16,000
commercial square feet.
The applicant would also continue to include the PD overlay on the entire project which requires
new development, such as the applicant's Riverpark project, to obtain a conditional use permit.
Tract Map
The project is proposing to subdivide the site's 695.4 acres into 419 singe family lots, five
multi -family lots (for 704 multi -family units), and lots for commercial, recreation/parks, utilities,
roadways, and open space.
The detached single family housing would be located in Residential Areas A- 1, A-2, and B. The
lots in these Residential Areas would range in size from 5,000 to 9,418 square feet and would
include development on approximately 83.9 acres of the 695.4 acre site. The average single
family lot size would be 5,775 square feet.
The project would also construct 704 multi -family units on five lots in Residential Areas C (380
for sale condominiums/townhouses) and D (324 rental apartments ).
The project proposes a one acre commercial lot at the southeast comer of Newhall Ranch Road
and Bouquet Canyon Road. A maximum of 16,000 square feet of general commercial type uses
(retail, restaurant establishments) could be situated on the site.
Conditional Use Permit
A conditional use permit (CUP) is being requested, as is required because of the existing and
proposed Planned Development (PD) Overlay zone on the project site. The project proposal also
requires a CUP to allow residential building heights in Areas C and D in excess of two stories
and 35 feet tall (up to a maximum of 50' or three stories), approval of the Hillside Innovative
Application to allow for development on two ridgelines classified by the City as secondary
ridgelines, and vehicular gating of Planning Areas A-1, B, and C.
Oak Tree Permit
The applicant is requesting an oak tree permit to remove 17 healthy oak trees and to encroach
upon three (3) oak trees within the protected zone. Fourteen of the 17 oak trees are proposed to
be relocated on site. Three of the 14 trees proposed for relocation are of heritage size. There are
a total of 87 oak trees within the project site.
Hillside Review Permit
A Hillside Permit is required for the proposed development on slopes with an average cross slope
of greater than 10 and development on ridgelines classified by the City as secondary ridgelines.
The intent of the hillside ordinance is to "regulate the development and alteration of hillside
areas and ridgelines, to minimize adverse effects of hillside development and to provide for the
safety and welfare of the City of Santa Clarita while allowing for the reasonable development of
hillside areas." (UDC Section 17.80.010.)
An Innovative Application is required to develop on City -identified ridgelines classified as
secondary ridgelines. The Riverpark project proposes encroachment on two ridgelines classified
by the City as secondary ridgelines. Both of these ridgelines are located both on and off the
project site. The applicant is requesting under the Hillside Pen -nit and Conditional Use Permit
that the project site be considered an "innovative project" in order to encroach upon these two
ridgelines.
The first City -classified secondary ridgeline enters the project site from the north, to the east of
the future intersection of Santa Clarita Parkway and Newhall Ranch Road. Approximately 1,690
linear feet or 45% of the northern portion of the ridgeline was impacted and graded by the
construction of the CLWA Rio Vista Water Treatment Plant and Administrative Offices. The
project would impact the remaining southern portion of the ridgeline (approximately 55% or
2,062 linear feet). However, approximately 700 or 34% of the 2,062 linear feet would be
impacted as a result of the extension of Newhall Ranch Road and the Santa Clarita Parkway.
The remaining 1,362 linear feet or 66% of the 2,062 linear feet would be impacted by a portion
of the residential development in Area B.
The second City -classified secondary ridgeline also enters from the north into Planning Area C
on the eastern portion of the project site. A majority of this ridgeline is located off-site, however;
only approximately 29% or approximately 597 linear feet of the ridgeline is located on the
project site. Moreover, after further research and comparison, the ridgeline as shown on the
City's Ridgeline Map is incorrect. This ridgeline actually extends approximately 372 linear feet
into the project site, not 597 linear feet as shown on the City's Ridgeline Map. Therefore, the
project would impact (as a result of Planning Area C development) approximately 225 of the 372
linear feet of the ridgeline.
Included in the Planning Commission's recommendation to the City Council is the
Commission's determination that the project meets all of the required innovative findings, as the
project employs a site design that tailors the development to the site and minimizes impacts to
the significant natural topographic prominent features (Santa Clara River, central canyon, etc.)
within the project site; and the project leaves a substantial portion of the project site as open
space, by concentrating development on the flatter and disturbed portions of the site. In addition,
the Planning Commission believed that the Riverpark project provides the following specific
benefits related to the innovative application:
• Preservation and dedication of approximately 450 acres of open space, including
approximately 350 acres of the Santa Clara River;
• Dedication to the City of Santa Clarita and improvement of a 29 -acre active/passive park;
• Extension of over two miles of the Santa Clara River Regional Trail, including
construction of a bike/pedestrian/equestrian bridge over the LA DWP Aqueduct;
• Extension of nearly two miles of Class I (roadway separated trail) along Newhall Ranch
Road;
• Dedication of approximately 130 acres of the South Fork of the Santa Clara River,
including adjacent upland area — the property is located between Valencia Boulevard and
Wiley Canyon Bridge; and,
• Contribution, through right-of-way dedication and bridge and thoroughfare fees, of nearly
$25,000,000 to the construction of this segment of the Cross Valley Connector.
Adiustmen
An adjustment is being requested by the applicant to allow for a 16 -foot front yard setback on
traditional garage facing street designs, so long as 95% to 100% of the garages on these lots are
set back a minimum of 5 feet from the front elevation. All driveways shall be 20 feet long (20
percent adjustment). The minimum front yard setbacks in the RM zone are 20 feet. Also
requested under the adjustment is an increase to the height of the sound walls to a maximum of
seven feet in order mitigate noise levels. The maximum height of property line walls outside of
front yard setbacks is six feet. The proposed walls will be used as property line walls and sound
walls where lots are adjacent to Newhall Ranch Road or Santa Clarita Parkway.
ENVIRONMENT4L IMPACTREPORT
A Draft Environmental Impact Report for the Riverpark project ("Draft EIR") was prepared and
circulated for review and comment by affected governmental agencies and the public. All issues
raised by comments on the Initial Study, and by comments on the Notice of Preparation (NOP)
and the Revised NOP have been considered, in compliance with CEQA. The Notice of
Availability/Notice of Completion for the Draft EIR was filed, posted and advertised on March 2,
2004, and the public review period extended for 60 days, from March 3, 2004 through 5:00 p.m.
on May 3, 2004, in accordance with CEQA. After release of the Draft EIR for public comment,
the Draft EIR's Biological Resources section was revised due to the recent detection of the
presence of a special status species (Western Spadefoot Toad) on the project site, and a revised
Notice of Availability/Notice of Completion was filed, posted and advertised on March 24, 2004,
and the public review period for that revised section extended for 45 days, from March 24, 2004
through May 10, 2004.
The Draft EIR addresses the following environmental factors: Geotechnical Hazards (§ 4.1),
Flood (Hydrology; § 4.2), Traffic (§ 4.3), Air Quality (§ 4.4), Noise (§ 4.5), Biological Resources
(§ 4.6), Land Use (§ 4.7), Cultural Resources (§ 4.18), Visual Resources (§ 4.16), Water Service
(§ 4.8), Water Quality (§ 4.8.1), Wastewater Disposal (§ 4.21), Solid Waste Disposal (§ 4.9),
Education (§ 4.10), Library Services (§ 4.11), Parks and Recreation (§ 4.12), Fire Services (§
4.13), Sheriff Services (§ 4.14), Population, Housing and Employment (§ 4.17), Agricultural
Services (§ 4.19), Human -Made Hazards (§ 4.15) and Floodplain Modification (§ 4.20). The
DEIR also includes a detailed Project Description (§ 1.0), Environmental and Regulatory Setting
Section (§ 2.0), Project Alternatives (§ 6), Cumulative Impacts (§ 3.0 and §§ 4.1 through 4.21),
and Growth Inducing Impacts (§ 7.0).
Unavoidable significant impacts have been identified in the following sections: Air Quality;
Traffic/Access; Biological Resources; Solid Waste Disposal; Visual Resources; Agricultural
Resources; and Noise.
The Final Environmental Impact Report (Final EIR) was prepared for the project after the review
period had concluded. The Final EIR contains: (1) revised Draft EIR pages reflecting minor
revisions to the original document based on issues raised by the commentators, minor revisions
to the project, and/or issues raised by staff-, (2) all of the written comment letters received by the
City both during and following the comment periods on the Draft EIR and Revised Draft EIR
Section 4.6; (3) detailed Responses to Comments, including 6 comprehensive topical responses
and detailed responses to the comment letters (each of the commentators has received a copy of
the Final EIR); (4) transcripts of the Public Hearing Testimony before the Planning Commission;
(5) detailed Responses to Public Hearing Testimony; (6) the Mitigation Monitoring and
Reporting Program (MMRP), which includes all of the required mitigation measures and
identifies who is responsible for their implementation; (7) Appendices to the Final EIR and, by
incorporation by reference; (8) the complete Draft EIR.
On December 1, 2004, the Final EIR was forwarded to the Planning Commission, members of
the public who commented on the Draft EIR, and to commenting agencies, and was placed in the
same libraries where the Draft EIR had been placed. On December 21, 2004, the Final EIR for
the Riverpark project was recommended by the Planning Commission to the City Council for
certification in a vote of 4: 1. On December 22, 2004, the Final EIR in CD format was forwarded
to the City Council for their review.
PLANNING COMMISSION RECOMMENDAT
The Planning Commission held nine public hearings on the Riverpark project and closed the
public hearing on August 31, 2004, at which time it conceptually recommended approval of the
project to the City Council. At that meeting, the Planning Commission directed staff to prepare
all of the necessary documents, incorporating all direction and changes received from the
Planning Commission, for a recommendation of approval to the City Council. At the December
21, 2004 meeting, the Planning Commission in a 4:1 vote recommended approval of the project
and associated entitlements to the City Council.
Substantial revisions were made to the project by the Planning Commission primarily due to
comments from public agencies, members of the public, and the Planning Commissioners. These
revisions are as follows:
* Vehicular gating of single-family internal streets in Areas Al and B, and the internal
street in the multi -family Area C (but not in Area A2 where public access to the park is
required), and conversion of the gated streets from public to private streets.
• Reroute the equestrian trail in the area adjacent to the L.A. Aqueduct from the river
bottom to the pedestrian bike trail, and widen the pedestrian/bike bridge over the
aqueduct from 15' to 20' to accommodate equestrian traffic.
• Construct Santa Clarita Parkway with two vehicle lanes rather than six (four potential
future lanes will be landscaped).
• Convert Area C (420 units) from apartments to condominium/townhomes, resulting in a
reduction in density in this area from 420 units to 380 units.
• Revise the Park Plan per the Parks and Recreation Commission's recommendation, which
necessitated the removal and relocation of two additional oak trees. Additional Parks and
Recreation Commission revisions included:
Relocate the drainage to the western boundary of the active area of the park. (The
previous proposal included drainage through the park site, bisecting the active area.)
• Change and widen the shape of the active park to create the best use of the developed
active park.
• Relocate 5 homes to the other side of street 'M' to provide over 300' of additional
street frontage.
• Add a drivable pathway to the park to allow police and emergency vehicles a route to
pass through the park.
• Adjust the southern grade of the active park (results in the relocation of two
non -heritage oak trees within the developed park) to bring the grade of the park to
closer to street level.
Dedicate to the City the open space adjacent to Central Park.
Subject to CLWA approval, install a temporary trail fi7om the Riverpark project boundary
north of Newhall Ranch Road near Santa Clarita Parkway to an established dirt trail
accessing Central Park.
Redesign Area D — eliminating grading on the nose of the ridgeline facing the Emblem
neighborhood resulting in the relocation of apartment buildings further away from the
Emblem neighborhood, providing a decorative wall and landscaping along the area
between the existing commercial area and the nose of this ridge, and recording a "no
building or structures restriction" on the open space lot between these apartment
buildings and the Emblem community.
0 Dedicate to the City approximately 30 off-site acres of the South Fork of the Santa Clara
Dedicate to the City approximately 30 off-site acres of the South Fork of the Santa Clara
River, including the adjacent upland area, located between Valencia Boulevard and
Magic Mountain Parkway, and approximately 100 additional acres of the South Fork of
the Santa Clara River from the Magic Mountain Parkway bridge south to the Wiley
Canyon Bridge, for a total of approximately 130 acres.
Although the adjustment to reduce the front yard setback from 20 to 16 feet was granted,
require all driveways to be 20 feet long and all single-family lot widths to be 50 feet.
Finally, the most substantial revision made by the Commission was to revise the project to move
the development further away from the River corridor to preserve the mature riparian resources
located along the western portion of the project starting near the Burger King property in the west
and ending at the park site, excluding the affected portion of the Newhall Ranch Road extension.
Santa Clara River Boundary Limits
Prior to the applicant making the revisions to push the project further away from the Santa Clara
River, staff provided the Planning Commission at the July 20, 2004 Planning Commission
meeting with a brief summary describing different scenarios that could be used to establish the
limits of the Santa Clara River corridor on the Riverpark site. These consisted of the (1)
Resource boundary, (2) Federal Emergency Management Agency (FEMA) 100 -year storm
boundary, (3) Q -Cap boundary, and the (4) Natural River Management Plan boundary. The
Planning Commission directed the applicant to revise the site plan to reflect the Resource
boundary line scenario, as the Commission felt that it established the true edge of the River
corridor. It's important to note that all of the scenarios were used to establish a River corridor
"boundary line" only and that the applicant is complying with all of the FEMA, NRMP, and
Q -cap requirements.
The following is a brief Summary of the Resource boundary scenario recommended by the
Planning Commission and is reflected in the site plan that is before the City Council tonight:
e Resource Line Scenario (Recommended by the Planning Commission)
This scenario was created in large part due to analysis in the DEIR and comments from CDFG
and several environmental groups. The DEIR indicates that habitat on the western portion of the
project site, along the edge of the river, is of relatively high biological value. Other high-value
habitat along the river on the eastern portion of the site would not be impacted by the project.
This scenario would require pulling back the bank stabilization along the western portion of the
Riverpark site where a mature riparian resource edge exists. This scenario would preserve the
mature resources along river edge and create the DEIR recommended 100 foot upland preserve
from the eastern commercial parcel to the western boundary of the active park, excluding the
affected portion of Newhall Ranch Road which is a fixed alignment and cannot be modified.
This revision recommended by the Planning Commission, combined with additional
Commission directed requirements in this area of the project, resulted in a reduction of 20 single
family lots, as well as the loss of approximately two of the three commercial acres proposed by
the project.
This scenario would also preserve the higher value riparian resources on the project site and
would result in these portions of the project complying with the DEIR recommended 100 foot
upland preserve (areas where at least 100 feet of upland habitat from the riparian resource
occurs). The remaining portions of the project that would not adhere to this standard consist of
lower value habitat adjacent to areas that have historically been disturbed by agricultural
operations (Area A2) and areas characterized by high bluffs (portions of Area B) which limits the
use of this upland zone by riparian species. Finally, the remaining encroachments within the
I 00 -foot upland preserve occur due to the extension of Newhall Ranch Road and the Santa Clara
River Regional Trail (primarily on the eastern portion of the project site where topography
necessitates its location along the River).
Brief summaries of the other three River corridor scenarios are included in Attachment A, titled
Project Description, that is attached to this report.
The above described revisions have resulted in a reduction of residential units from 1, 183 to
1,123, including the conversion of Area C to condominiums/townhomes. Additionally, the
commercial acreage was reducedfrom a total of three acres to one acre.
In addition, the Planning Commission directed staff to incorporate the following requirements
into the conditions of approval for the project:
• Enhanced landscaping along Newhall Ranch Road and Santa Clarita Parkway to further
buffer these proposed residential units from the roadways.
• Require the Newhall Ranch Road/Golden Valley Road Bridge and bridge abutments to be
subject to the City's Cross Valley Connector Aesthetics' Guideline Book.
• Require the applicant to pay 25% of the costs associated with the construction of a
pedestrian bridge over Newhall Ranch Road providing regional trail access from Central
Park to the Santa Clara River Regional Trail. If feasible, the pedestrian bridge should be
located in Area D and the western portion of Area A-1.
• Install two guzzlers along the Santa Clara River for enhancement of this identified
wildlife corridor.
• Enhance the Pipeline corridor under the Newhall Ranch Road Bridge for its potential use
for on-site wildlife mobility.
• Final colored elevations of the residential units and the final site plan shall be submitted
to and approved by the Planning Commission prior to issuance of a building permit.
• Provision of a decorative wall and landscaping from the wall located on the eastern
property line of the "Von's" commercial center to the western terminus of the ridgeline
separating Area D development from the Emblem community.
• Submission of a detailed gating plan illustrating consistency with the City's Unified
Development Code standards for gating prior to issuance of a fine grading permit.
The Planning Commission, in recommending approval of the project to the City Council found
that the project meets all of the innovative findings contained within the City's Hillside
Ordinance as it employs a site design that tailors the development to the site and minimizes
impacts to the significant natural topographic prominent features (Santa Clara River, central
canyon, etc.) within the project site; and the project leaves a substantial portion of the project site
as open space and concentrates development on the flatter and disturbed portions of the site. In
addition, the Planning Commission believed that the Riverpark project provides the following
specific substantial benefits related to the innovative application:
I . Preservation and dedication of approximately 440 acres of open space, including
approximately 338 acres of the Santa Clara River and 10 acres of open space adjacent to
the City's Central Park;
2. Dedication and improvement to the City of Santa Clarita of a 29 acre active/passive park;
3. Extension of over two miles of the Santa Clara River Regional Trail; including bridging
over the LA DWP Aqueduct;
4. Extension of nearly two miles of Class 1 (roadway separated trail) along Newhall Ranch
Road;
5. Dedication of approximately 130 acres of the South Fork of the Santa Clara River,
including adjacent upland area — the property is located between Valencia Boulevard and
Wiley Canyon Bridge; and,
6. Contribution, through right-of-way dedication and bridge and thoroughfare fees, of
approximately $24,000,000 to this segment of the Cross Valley Connector.
FISCAL IMPAC
As stated above, the last unfunded link (Newhall Ranch Road) for the Cross Valley Connector
runs through the Riverpark project site. Based on the 1, 123 dwelling units currently depicted on
the project site, in addition to providing the right-of-way for this unfunded link, the project would
provide the following:
Cost Breakdown Based on 2003 Estimates
Cross Valley Connector
(Bouquet to Soledad Flyover)
6 Lane Road / 4 Lane Bridge
No Rive1park With Riverp
Design $3,000,000 $3,000,000
*ROW Acquisition $ 10,000,000 $0
Construction $ 26,500,000 $ 26,500,000
Contingency /Overhead $ 10,000,000 $ 10,000,000
Subtotal $ 49,500,000 $ 39,500,000
** B&T Contribution N/A - $ 13.139.000
Total $ 49,500,000 $ 26,361,000
* ROW acquisition cost expected to be higher — based upon 2000 estimate and based upon
past ROW acquisition on similar projects being higher than estimated.
**B&T obligation cited above is based upon 1, 123 residential units and a one -acre
commercial site
ALTERNATIVE ACTIONS
1. Other action as determined by the City Council.
ATTACHMENTS
Attachment A: Riverpark project description
Attachment B: Riverpark Vesting Tentative Tract Map
- Staff Reports for the Planning Commission meetings held on March 2, 2004, April 20, 2004,
April 29, 2004, May 13, 2004, May 18, 2004, June 15, 2004, June 29, 2004, July 20, 2004,
August 31, 2004, October 5, 2004, November 16, 2004, and December 21, 2004 available in the
City Clerk's Reading File
- Minutes from the 12 Planning Commission meetings available in the City Clerk's Reading File
- Planning Commission Resolutions PO4-31 and PO4-32 available in the City Clerk's Readin
File el
ATTACHMENT A
RIVERPARK PROJECT DESCRIPTION
PROJECT DESCRIPTION
PROJECT SUMMARY
The project includes the development of 695.4 acres of land for 1,123 single- and multi -family
units, a maximum of 16,000 square feet of commercial uses, and recreational/park uses, along
with associated infrastructure, and open space within 6 planning areas. The project also includes
the construction of a portion of Santa Clarita Parkway, approximately 9,000 linear feet of buried
bank stabilization, 1,500 linear feet of erosion or toe protection, a neighborhood park, and related
infrastructure. Implementation of the project would result in the removal of 17 oak trees, 14 of
which would be relocated on-site. The project, at build -out, also necessitates the extension of
Newhall Ranch Road, including the Newhall Ranch Road/Golden Valley Road Bridge, to the
Soledad Canyon Road flyover.
Below, is the updated Riverpark Statistical Summary reflecting all of the revisions directed by
the Planning Commission.
Riverpark Statistics Summary date 12/14/04
Land Use
Acres
Dwelling Units
Residential Uses
Single Family
78.4
419 d.u.
Multi -Family
73.4
704 d.u.
Subtotals
151.8
1,123 d.u.
Non Residential Uses
Commercial
1.3
16,000 s.f.
Subtotals
1.3
16,000 s.f.
Recreation and Open Space
Active/Passive Park (includes 1.7 ac WO basin)
28.7
Open Space
Santa Clara River Corridor (including adjacent
upland areas)
76.1
346.8
River Trail/Open Space
7.7
City Maintained Slope Lots Adj. to
10.4
Public Right of Way
Private Recreation
1.2
Subtotals
470.9
Community Facilities
Roadways
69.6
Water Quality Basin (serving area Al)
1.8
Subtotals
71.4
I otals
695.4
1,123 d.u./
16,000 s.f.
Riverpark Project
January 25, 2005
Page 2 of 9
Residential Component
The project includes the development of 1,123 dwelling units, including 419 detached single-
family dwellings and 704 multi -family units. Detached single family housing would be located
in Planning Areas A-1, A-2 and B. This housing type is characterized by traditional single
family lots with minimum lot sizes of 5,000 square feet and a gross density of 4.91 single family
dwelling units per acre. The single-family lots would consist of fee lots where homeowners
would own the land and home. The lots would range in size from 5,000 to 9,418 square feet and
would include development on approximately 83.9 acres of the 695.4 acre site. The average
single family lot size would be 5,775 square feet.
The project applicant would also construct multi -family units on three lots in Planning Area C
(380 for sale condominiums/townhomes) located at the northeastern portion of the site, and two
lots in Planning Area D (324 rental apartment) located in the northwestern portion of the site
behind the existing Von's shopping center on Bouquet Canyon Road.
Commercial Component
The project proposes a one -acre commercial site at the southeast comer of Newhall Ranch Road
and Bouquet Canyon Road in Planning Area E. It is expected that a maximum of 16,000 square
feet of general commercial -type uses (retail, restaurant establishments) could be situated on the
site.
Recreation/Park Component
The proposed project includes lots dedicated to public park areas and development of a public
trail system. A 29 -acre park (5 acre active area, 0.5 acre passive area, and 23.5 acre open space
area) would be dedicated to the City and would be located between Planning Areas A- I and A-2.
The applicant would obtain Quimby credit for the 5 acres of active park, with the remaining
acreage proposed as mitigation for the project's oak tree impacts (discussed below). The park
would abut the Santa Clara River and includes a public trail system that would connect the Class
I trail along the extension of Newhall Ranch Road to the Santa Clara River Trail. The 2 -mile
extension of the Santa Clara River Trail would contain a 12 -foot equestrian trail, four -foot
pedestrian trail, and a 12 -foot Class I bike lane with a minimum of 7 feet of landscaping; a
pedestrian/bike/equestrian bridge would extend this trail over the Los Angeles Department of
Water and Power Aqueduct. In addition, the project would include 3 primary pn . vate
recreational facilities, one each in Planning Areas A-1, C, and D. Additionally, the applicant is
proposing 4 secondary private recreational lots, 2 in Planning Area A -I and 2 in Planning Area
B. Three of the 4 secondary private recreation lots would also provide connections to the City-
wide trail system.
Open Space/Conservation Component
A portion of the Santa Clara River is located within the project site, and extends along the site's
southern boundary. The General Plan has designated a Significant Ecological Area (SEA)
overlay for portions of the project site. The City has defined the boundaries of this SEA as those
Riverpark Project
January 25, 2005
Page 3 of 9
areas within the Federal Emergency Management Act (FEMA) 100 -year flood boundary.
Approximately 350 acres of the Santa Clara River and adjacent upland areas would be
maintained predominately in their natural state. A majority of the project development would
occur outside of the existing SEA boundaries, with the exception of portions of residential lots
located in Area A-2 (Lots 338 -352), graded slopes within Areas A-2, and B, as well as the bank
stabilization, toe or erosion projection, proposed trails and portions of the Newhall Ranch Road,
including all of the Newhall Ranch Road/Golden Valley Road Bridge and associated piers and
abutments.
Newhall Ranch Road/Golden Valley Road and Santa Clarita Parkway
The Circulation Element of the City's General Plan shows two major arterial roadways planned
through the Riverpark project site. The first is Newhall Ranch Road, including the Newhall
Ranch Road/Golden Valley Road Bridge, which runs along the northern portion of the site in an
east/west direction and forms the last unbuilt, unfunded segment of the "Cross Valley
Connector". The second major arterial roadway is Santa Clarita Parkway, which runs through
the center of the project site in a north/south direction, dividing Planning Areas A-2 and B. The
applicant is proposing to construct a portion of Santa Clarita Parkway from Newhall Ranch Road
to an area just north of the Santa Clara River. There will be access points off of both roadways
for the development.
The following is a list of the Cross Valley Connector segments starting at the Interstate
5/126 Interchange and ending at the Golden Valley Road/14 Freeway interchange and the
status of each Interstate 5/126 Interchange to the Newhall Ranch Road/Rye Canyon Road
intersection is in the environmental stage and is fully funded. Construction is anticipated
to begin in mid -2005 with completion in mid -2006.
Newhall Ranch Road/Rye Canyon Road intersection to the Newhall Ranch
Road/Bouquet Canyon Road intersection is built.
Newhall Ranch Road/Bouquet Canyon Road intersection to the Santa Clara River just
north of the Soledad Canyon Road "Flyover" is being analyzed in the Riverpark EIR and
will also be analyzed in a separate EIR/EIS being prepared for this segment.
Area just south of the Santa Clara River to an area just south of Soledad Canyon Road
(named the Soledad Canyon Road/Golden Valley Road flyover, which is a bridge over
Soledad Canyon Road) is under construction.
From the terminus of the Soledad Canyon Road/Golden Valley Road flyover to the
Golden Valley Road/Sierra Ifighway intersection is built.
Golden Valley Road/Sierra Ffighway intersection to the 14 Freeway is built and will be
opening shortly.
As noted above, the Riverpark EIR analyzes the extension of Newhall Ranch Road (including
Riverpark Project
January 25, 2005
Page 4 of 9
the Newhall Ranch Road/Golden Valley Road Bridge over the Santa Clara River) from Bouquet
Canyon Road to the Soledad Canyon Road/Golden Valley Road flyover, with construction of 4
to 6 vehicle lanes, a landscaped median and a Class I trail. The Riverpark project, by itself,
would necessitate the construction of only two lanes on Newhall Ranch Road, including the
Newhall Ranch Road/Golden Valley Road Bridge, for its full build -out, not 4 to 6 vehicle lanes.
In addition, the City is also addressing the extension of Newhall Ranch Road, including the
construction of the Newhall Ranch Road/Golden Valley Road Bridge, in a separate EIR/EIS.
This separate environmental document is being prepared for two reasons: (1) although Newhall
Ranch Road would provide access to the proposed project, this roadway is primarily needed to
alleviate existing traffic congestion in the City, and is necessary with or without the Riverpark
project, and (2) the City has utilized state and federal funding sources on other portions of the
Cross Valley Connector (Newhall Ranch Road) and will likely be utilizing them on this portion
of the roadway as well. Given the potential use of federal funding sources and the time
considerations associated with state/federal review, and the fact that the roadway projects are
independently necessary regardless of the Riverpark project, it was determined that two separate
environmental analyses would be conducted.
A small portion of this extension of Newhall Ranch Road is located off-site (at the northem
boundary above Planning Area B of the project site); however, CLWA has given permission to
construct the road in that location on their property.
Lastly, the applicant is proposing to construct a portion of Santa Clarita Parkway with a total of
two lanes (one in each direction), a landscaped median, and Class I trail, from Newhall Ranch
Road southerly approximately 1,500 linear feet. The project does not include the construction of
the Santa Clarita Parkway Bridge over the Santa Clara River. The applicant has also agreed to
provide enhanced landscaping in the right-of-way needed for 4 additional lanes.
Grading and Bank Stabilization
Project site grading would require the movement of approximately 9.1 million cubic yards of
earth, which would be balanced on site. Approximately 3.6 million cubic yards of the 9.1
rn�i Ilion cubic yards would consist of remedial grading.
Bank stabilization would be installed along ponions of the Santa Clara River within the project
site. The applicant is proposing to use buried bank stabilization adjacent to Planning Areas E
and A-1, and toe or erosion protection adjacent to Planning Area B and the Newhall Ranch
Road/Golden Valley Road Bridge abutment. Approximately 3,000 linear feet of bank
stabilization is necessary to protect Newhall Ranch Road and approximately 6,000 linear feet of
bank stabilization is necessary to protect the residential and commercial areas. The buried bank
stabilization would extend from the western tract boundary (adjacent to Planning Area E) and
terminate in the general area of the future Santa Clarita Parkway Bridge east of Planning Area A-
2 and west of Planning Area B. Toe protection (exposed soil cement) is being proposed at the
base of the bluff (approximately 1,500 linear feet in length) below Planning Area B. A
combination of buried bank stabilization and concrete would be utilized in the area of Newhall
Ranch Road/Golden Valley Road Bridge. The area between the end of the toe protection
Riverpark Project
January 25, 2005
Page 5 of 9
adjacent to Planning Area B and the Newhall Ranch Road/Golden Valley Road Bridge abutment
would not include any type of bank stabilization.
Utilities
All required utilities and services are currently at locations adjacent to the project site and would
serve the project site. Natural gas service would be supplied by Southern California Gas
Company, electric service would be supplied by Southern California Edison, and telephone
service would be supplied by Pacific Bell.
Water service would be provided by the Santa Clarita Water Company Division of Castaic Lake
Water Agency (CLWA). The project also includes the construction of a pedestrian bridge over
the Los Angeles Department of Water and Power Aqueduct.
Lastly, wastewater for the site would be treated by the Saugus Water Reclamation Plant and the
Valencia Plant.
Oak Trees
The project site includes 87 oak trees consisting of 25 California Live oaks, 15 Valley oaks, one
Blue oak, and 46 Scrub oaks. Of the 87 oak trees on the Riverpark project site, ten are of
heritage size. Two of the 10 heritage oak trees are dead (one Live oak and a Valley oak) and will
be removed. A majority (67) of the project site's oak trees are found near the center of the
project site in a canyon which is proposed to be dedicated to the City as part of the 29 -acre
active/passive park. The remaining oak trees are scattered widely throughout the site.
The proposed development would remove 17 oak trees (three Scrub oaks and 14 Valley oaks).
Of the 17 healthy oak tree removals, 14 (Valley oaks) are proposed to be relocated within the
project site. Three of the 12 trees proposed for relocation are of heritage size. The two
previously mentioned dead oak trees on site do not require a permit for removal. Mitigation for
the removal/relocation of the oaks includes the dedication of oak tree habitat (the central canyon)
and the planting of additional oak trees on site.
In addition to the oak trees that would be removed and relocated, project development would
encroach within the protected zones of three oak trees. Two of the encroachments are Live oaks
of which one is of heritage size and the third encroachment is a heritage Valley oak.
PHYSICAL CHARACTERISTICS OF THE SITE
The northern portion of the project site is characterized by southwest to southeast trending ridges
that descend from plateaus elevated up to about 350 feet above the Santa Clara River. The
proposed project site contains hillside areas with slopes in excess of 10 percent. Two ridgelines
classified by the City as secondary ridgelines cross portions of the site (in Planning Areas B and
C, respectively) and another ridgeline classified by the City as a secondary ridgeline occurs just
north of the project site. No primary ridgelines exist on the site. A substantial portion of the
ridgeline classified as a secondary ridgeline that extends into Planning Area B has been disturbed
Riverpark Project
January 25, 2005
Page 6 of 9
by development of the CLWA administrative offices and treatment plant. The portion of the
City -Classified secondary ridgeline that appears to extend into Planning Area C in fact is the
result of a mapping error. Elevations on the site range from approximately 1,155 feet above sea
level along the river to 1,490 feet above sea level along the northeastern comer of the site.
Slopes range from gentle to moderately steep with the steepest slopes in the side canyons.
A portion of the Santa Clara River traverses the southern portion of the project site
EXISTING USES ON SITE
The project site is predominantly vacant, but has been disturbed by human activity. The site
includes several buildings presently used for a construction business. A modular building houses
the office of the construction company. A metal shed (maintenance shop) and a red wooden
building are the only permanent structures currently on the parcel. The project site also includes
existing water wells, the CLWA pipeline, easements for the Los Angeles Aqueduct and the Kern
River Company. Other utility structures such as Southern California Edison electrical
transmission lines traverse portions of the project site. Portions of the site were previously used
for agricultural purposes.
CURRENT GENERAL PLAN DESIGNATIONS COMPARED TO PROJECT
Currently, the City's General Plan designations for the project site include RM (Residential
Moderate), RM(SEA) (Residential Moderate with a Significant Ecological Area Overlay),
IC(SEA) (Industrial Commercial with a Significant Ecological Area Overlay), CC (Community
Commercial), CO(SEA) (Commercial Office with an Significant Ecological Area overlay) , and
CC(SEA) (Community Commercial with a Significant Ecological Area Overlay). In addition,
the Valley Center Concept Overlay (VCQ encompasses the entire project site. These General
Plan designations would allow approximately 3,000,000 to 13,000,000 square feet of commercial
square footage (with a small portion of that space for industrial square footage for the IC
designation) and roughly 3,000 to 15,000 dwelling units. The Riverpark project is substantially
lower in density and intensity that what could be permitted under the City's General Plan.
The project applicant is requesting a General Plan Amendment to designate the site RM with
VCC and SEA overlays where appropriate. A small portion of the site (approximately I acre)
would be designated CC (VCQ. The project proposes to develop 419 single-family homes and
704 multi -family units on 151.8 acres of land within the 695.4 acres of the site proposed for an
RM designation. This results in an overall gross density of 1.6 dwelling units per acre. The RM
land use designation allows for densities ranging from 6.7 to 15 units per acre with a mid range
density of 11 dwelling units per acre. Although the proposed development density for residential
is less than the range described in the General Plan, the General Plan does not prohibit lower
densities and the RM designation is necessary to allow both single- and multi -family units in the
project.
Riverpark Project
January 25, 2005
Page 7 of 9
The CC General Plan land use designation allows for a floor area ratio (FAR) range from .25 to
.5: 1, with a midpoint FAR of .375: 1. This project proposes a maximum of 16,000 square feet of
commercial floor area or a floor area ratio of .22:1 which is below the maximum square footage
allowed.
SANTA CLARA RIVER BOUNDARY LIMITS
Below is a brief Summary of each of the remaining other three scenarios that were referenced in
the agenda report which include the FEMA, Q -Cap, and NRMP scenarios:
* Existing FEMA Boundary
The City's boundary limits of the Santa Clara River SEA are based on FEMA's existing 100
year storm limit elevation. However, the FEMA line does not reflect the location of riparian
resources along the River. The Riverpark DEIR identifies a "resource line" that corresponds to
the actual riparian or SEA like resources on the Riverpark site. Moreover, the FEMA flood
hazard zone would be modified upon the completion of floodway improvements (i.e. bank
stabilization), as the once affected property would no longer be subject to flood hazard.
Under this scenario, the bank stabilization for the project would be "pulled back" in Area A2
(disked field) as well as the eastern portion of Area Al. However, the FEMA Boundary scenario
would permit the removal of substantial riparian resources in the western portion of Area Al
(these riparian resources are outside of the SEA/FEMA line), an area that the DEIR indicates has
high value and that CDFG would like to preserve.
In summary, utilizing the FEMA boundary scenario as the project's grading limits would remove
up to 40 residential lots from Areas A -I and A-2, and the entire proposed 3 acre commercial
area. In addition, this scenario would move the active neighborhood park northerly and further
into the canyon, necessitating the removal or relocation of more oak trees and additional
residential lots to maintain similar active park acreage as the applicant's proposal. Portions of
Newhall Ranch Road would be located within the FEMA boundary or SEA; since the road
alignment is fixed, a "pull back" of bank stabilization in these affected areas was not considered.
An important note on this scenario is that the FEMA boundary scenario was chosen for purposes
of establishing a River boundary line for the Planning Commission's and City Council's review.
The FEMA line is used primarily to establish an elevation, based upon present site conditions
that would be at least one foot above FEMA's 100 year storm event. In summary, if a hydrology
analysis supports it, a project could encroach much further into the River corridor than Riverpark
and meet FEMA requirements provided that flood protection was required and the building pad
was elevated in accordance with FEMA requirements.
The revised Riverpark project, as recommended by the Commission, complies with all of the
FEMA requirements.
0 Q -Cap Line
The County's Q -cap is based on a theoretical four-day storm event occurring right after the
watershed has been burned with a resulting flow or runoff rate being increased by bulking,
yielding a peak flow that is 32 %to 80% higher than a 50 -year storm over an unbumed-unbulked
watershed. The County's Q -cap yields greater design flows than FEMA's methodology for
Riverpark Project
January 25, 2005
Page 8 of 9
calculating the 100 -year and 500 -year floods.
An important note and as with the FEMA 100 -year line, the Q -cap line corresponds to the
present maximum floodway elevation of a capital storm. The land within the Q -cap line can be
developed as long as bank stabilization is installed, there are no significant upstream or
downstream hydrologic impacts and required elevations are met.
Alternative 2 analyzed within the DEIR, a "pullback" of the bank stabilization to correspond to
the Q -cap line or upland preserve/buffer setback line, whichever is more restrictive. It's
important to note that this alternative and all the other alternatives would meet the Q -cap
requirements; however, this alternative would also push development back behind the existing
Q -cap line, whereas the others alternatives would meet the requirements of the Q -cap without
pushing development back.
The DEIR indicates that this alternative would result in the loss of 54 single family lots in Al, 24
single family lots in A2, one acre of commercial land, and four acres of the active park.
However, the applicant provided a more detailed analysis at the Commission level which
indicates that this scenario would result in the loss of up to 75 lots in Areas Al and A2.
Additionally, two acres of the commercial area would be eliminated as well as three acres of the
active park. As with the FEMA scenario, the active park would be pushed back farther into the
canyon, resulting in the removal/relocation of more oak trees and additional residential lots.
The revised Riverpark project, as recommended by the Commission, would comply with all of
the Q -cap requirements.
0 Natural River Management Plan (NRMP) Boundary
On November 30, 1998, the Army Corps of Engineers (ACOE), California Department of Fish
and Game (CDFG), and the Regional Water Quality Control Board (RWQCB) approved the
Natural River Management Plan (NRMP) for the Santa Clara River. The NRMP is a long-term
master plan that provides for various infrastructure improvements on the lands adjacent to the
Santa Clara River and portions of two of its tributaries. More specifically, the NRMP governs a
portion of the main -stem of the Santa Clara River from Castaic Creek to the Riverpark eastern
project boundary. The NRMP was prepared in response to an ACOE request to prepare a long-
range management plan for projects and activities potentially affecting the Santa Clara River and
San Francisquitc, Creek. The certified EIRJEIS prepared in conjunction with the NRMP,
analyzed impacts, primarily biota and hydraulic, associated with the implementation of various
infrastructure improvements (bank stabilization, bridges, utility crossings, storm drain outlets,
etc.) along and within portions of the Santa Clara River, including those portions within the
Riverpark site.
In summary, the NRMP EIRJEIS reviewed and evaluated the hydrological and biological context
and impacts of these river -related improvements and imposed conditions to mitigate their
potential impacts to a less than significant level. In addition to locating bridges and utility
crossings, the NRMP established a "top of bank stabilization" line for development projects
adjacent to the Santa Clara River.
The cur -rent project design complies with the NRMP requirements. The applicant has, with the
exception of two locations, moved the bank stabilization further back or away from the River as
compared to what was permitted in the NRMP. The two exceptions were necessary to save a
Riverpark Project
January 25, 2005
Page 9 of 9
heritage oak tree (#74) and the second occurs at the Newhall Ranch Road/Golden Valley Road
bridge and is necessary to accommodate a change in the alignment for the bridge partially as a
result of accommodating a trail connection from the Class I bike trail on Newhall Ranch Road to
the Santa Clara River Trail. Additionally, the applicant has removed a significant portion of
bank stabilization that was permitted under the NRMP, by pulling a portion of the project away
from the River. With regards to the NRMP boundary, the applicant would have been permitted
to develop the property with an additional 69 single family homes and two more acres of
commercial than what is currently being proposed by the applicant.
NOTICE OF CONTINUED PUBLIC HEARING
CITY OF SANTA CLARITA
CITY COUNCIL
NOTICE IS HEREBY GIVEN that the City Council of the City of Santa Clarita, at its regular meeting held
January 25, 2005, continued a public hearing on
RIVERPARK PROJECT - A request by Newhall Land to develop 695.4 acres in the center of
the City located at the terminus of Newhall Ranch Road, east of Bouquet Canyon Road between
the Castaic Lake Water Agency property and the Santa Clara River, north of Soledad Canyon
Road
to March 22, 2005. The continued public hearing will be held at or after 6:00 p.m. in the Council Chamber
at 23920 Valencia Blvd., Santa Clarita, California.
Dated this 26'h day of January, 2005.
SHARON L. DAWSON, CITY CLERK
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES SS. AFFIDAVIT OF POSTING
CITY OF SANTA CLARITA
1, SHARON L. DAWSON, being first duly swom, deposes and says that she is the duly
appointed and qualified City Clerk of the City of Santa Clarita and that on January 26,2005, she caused the
above notice to be posted at the door of the Council Chamber located at 23920 Valencia Blvd., Santa
Clarita, California.
'&� Z�� 94te�
SHARON L. DAWSON, CITY CLER—K
Santa Clarita, California
PublicHearings/CONTPH.doc