Loading...
HomeMy WebLinkAbout2006-06-27 - AGENDA REPORTS - ANNUAL CONCRETE REHAB PGM (2)CONSENT CALENDAR Ia7:74Y:1 SUBJECT: f706V1.ilIUVtam Agenda Item: I— CITY OF SANTA CLARITA AGENDA REPORT City Manager Approval: Item to be presented by: June 27, 2006 FISCAL YEAR 2005-2006 ANNUAL CONCRETE REHABILITATION PROGRAM, PROJECT NOS. M0048, M0050, AND T0023 - PROJECT ACCEPTANCE Public Works RECOMMENDED ACTION City Council accept the completion of the construction contract executed by FS Construction for the Fiscal Year 2005-2006 Annual Concrete Rehabilitation Program for removal and replacement of sidewalk, curb and gutter, driveway approaches, and handicapped access ramps, Project Nos. M0048, M0050, and T0023; authorize the expenditure of $40,000.00 from Account No. 4815-8055 to provide for additional work; direct the City Clerk to file the Notice of Completion; and direct staff to release the retention amount 35 days after the Notice of Completion is recorded, provided no stop notices have been filed, as provided by law. BACKGROUND On December 13, 2005, the City Council awarded a construction contract in the amount of $476,047.00 for the Fiscal Year 2005-2006 Annual Concrete Rehabilitation Program, Project Nos. M0048, M0050, and T0023, to FS Construction. The total budget for these three projects was previously approved by the City Council in an amount of $485,000.00 The purpose of this project was to improve and upgrade sidewalks and drainage systems Citywide by removing and replacing the existing damaged concrete sidewalks and curb and gutter systems. This damage was due to uplifting caused by tree root infiltration and pavement settlement. The contracts for these projects (M0048, M0050, and T0023) were combined to ensure the most efficient use of the available budget. By combining these projects, the City was able to remove and replace 23,056 square feet of sidewalk and driveway approaches and 4,579 linear feet of curb 'F'i E and gutter, and install 21 new handicapped access ramps at various intersections. During the course of construction, there was a need to remove and replace an additional 4,672 square feet of sidewalk and driveway approaches, and add 4 more new handicap ramps. This additional work was authorized as the contractor was already in the area with the equipment and materials needed to complete those repairs, and including these repairs as a part of this project was an efficient use of time and resources. An authorization to use funds in the amount of $40,000.00 is needed for this extra work. The construction contract was completed on time and to the satisfaction of the Director of Public Works on May 25, 2006. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT Funds totaling $485,000.000 were approved and budgeted in the current fiscal year. The $40,000.00 to pay for the enhancements to these projects is available in Expenditure Account No. 4815-8055 (Street Maintenance -Concrete). ATTACHMENTS Notice of Completion List of Locations EXHIBIT "A" ANNUAL CONCRETE REHABILITATION PROGRAM PROJECT NOS. M0048, M0050 AND T0023 SIDEWALK REPAIR PROJECT (M0048): Region Location Saugus Espuella Dr. Saugus Cantos Dr. Saugus Gavilan Dr. Saugus Balerna Dr. Saugus Serino Dr. Saugus Bouquet Cyn. Rd. Cyn. Cou. Bannerman Ave. Cyn. Cou. Cedar Valley Wy. Cyn. Cou. Friendly Valley Pkwy. Cyn. Cou. Gimlet Dr. Cyn. Cou. Torrey Pines Dr. Cyn. Cou. Sierra Estates Dr. Cyn. Cou. Aumond Ave. Cyn. Cou. Aldbury St. Cyn. Cou. Ermine St. Cyn. Cou. N. Ermine St. Cyn. Cou. Northbrook Ave. Cyn. Cou. Lacomb Dr. Cyn. Cou. Glasser Ave. Valencia Wiley Cyn. Rd. Valencia Via Adoma STORMWATER FLOWLINE REPAIR PROJECT (11110050): Saugus Soleded Cyn. Rd. Saugus Arriola Ave. Saugus Hyssop Ln. Saugus Wellston Dr. Saugus Kingcrest Dr. Saugus Susan Carol Dr. Saugus Sue Dr. Cyn. Cou. Cedar Valley Wy. Cyn. Cou. Friendly Valley Pkwy. Cyn. Cou. Torrey Pines Dr. Cyn. Cou. Sierra Estates Dr. Cyn. Cou. Abdale St. Cyn. Cou. Whispering Leaves Dr. Cyn. Cou. Ridge -Vale Dr. Cyn. Cou. Green Mountain Dr. Cyn. Cou. Aldbury St. Cyn. Cou. Ermine St. Cyn. Cou. Northbrook Ave. Cyn. Cou. Meadowcreek Rd. Cyn. Cou. Steinway St. Cyn. Cou. Keaton St. Cyn. Cou. Drasin Dr. Cyn. Cou. Drycliff St. Cyn. Cou. Fairport Ave. Cyn. Cou. Deeptree Ave. Cyn. Cou. Goodvale Rd. S:\PW\ENG-CI\MConcRehabO5-OMpecs\list of locatlons for council agenda EXHIBIT W ANNUAL CONCRETE REHABILITATION PROGRAM PROJECT NOS. M0048, M0050 AND T0023 STORMWATER FLOWLINE REPAIR PROJECT (M0050) Cont.: Valencia Wiley Cyn. Rd. Valencia Cortina Dr. Valencia Valencia Blvd. Newhall Everett Dr. HANDICAPPED ACCESS RAMP PROJECT (T0023): Region Location Saugus Oaklar Dr./Shine Ave. Cyn. Cou. Friendly Valley Pkwy./Abadale St. Cyn. Cou. Abdale St./Fairgate Ave. Cyn. Cou. Abdale St./Beachgrove Ct. Cyn. Cou. Friendly Valley Pkwy./Sierra Estates Dr. Cyn. Cou. Sierra Estates DrJFairgate Ave. Cyn. Cou. Sierra Estates Dr./Gimlet Dr. Cyn. Cou. Drycliff St./Camp Plenty Rd. Cyn. Cou. Drycliff StJDolton Dr. Newhall Lyons Ave./Atwood Blvd. a No. Of Ramps 2 2 2 2 3 S:\PW\ENG-CIVI\ConcRehab05-06\Specs\list of locatlons for coundl agenda