Loading...
HomeMy WebLinkAbout2006-12-12 - AGENDA REPORTS - ANNUAL OVERLAY SLURRY M0052 (2)CONSENT CALENDAR DATE: SUBJECT: DEPARTMENT: Agenda Item: CITY OF SANTA CLARITA AGENDA REPORT City Manager Approval: Item to be presented by: December 12, 2006 I � �I 0 lj6v-, 1 2006-07 ANNUAL OVERLAY AND SLURRY SEAL PROGRAM, PROJECT NO. M0052 - AWARD DESIGN CONTRACT Public Works RECOMMENDED ACTION City Council award the contract to Pavement Engineering Inc. for engineering design services for the 2006-07 Annual Overlay and Slurry Seal Program, Project No. M0052, in the amount of $132,035.00, and authorize a $13,205.00 contingency expenditure; and authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND The Annual Overlay and Slurry Seal Programs are an integral part of the City's pavement management program and operate on a five-year to seven-year cycle. Each year, streets are studied to identify the need for overlay or slurry. Streets will be selected using the City Pavement Index Map, street surveys, and input from the public. The Annual Overlay and Slurry Seal Programs improve various streets Citywide by resurfacing and sealing surface cracks to enhance skid resistant properties, and increase pavement life. This results in a smoother ride for traffic, an enhanced appearance of the area, and extends the economic life of the roadway. Staff prepared a Request for Proposals (RFP) for the subject project. Included in the RFP was the requirement to design the necessary improvements and evaluate streets in need of improvement. The RFP was sent to firms on the City's Design Consultants List. Four firms submitted proposals. They were Pavement Engineering of San Luis Obispo, MNS Engineers, Inc. of Santa Barbara, M 3 Civil, Inc. of Camarillo, and KDM Meridian of Lake Forest. Based on technical qualifications and methodology for the project, Pavement Engineering Inc. is the recommended firm. APPROVED ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT Funds to cover the design and construction costs of the 2006-07 Overlay Program and Slurry Seal Program have been appropriated as follows: $2,611,800.00 in Account No. M0052001-8001, and $700,000.00 in Account No. M0052201-8001; $2,388,200.00 in Account No. M0052205-8001; and $1,300,000.00 in Account No. M0052455-8001. These appropriated funds will adequately provide for design costs. ATTACHMENTS 104M