Loading...
HomeMy WebLinkAbout2006-02-28 - AGENDA REPORTS - BENZ RD TRAFFIC (2)Agenda Item: _ /3 CITY OF SANTA CLARITA AGENDA REPORT UNFINISHED BUSINESS City Manager Approval: Item to be presented by: DATE: February 28, 2006 Andrew Yi SUBJECT: BENZ ROAD TRAFFIC RESTRICTIONS DEPARTMENT: Public Works RECOMMENDED ACTION City Council approve a two-step plan for traffic restrictions on Benz Road to address cut -through traffic; authorize staff to install Step I improvements (signs restricting peak period turning movements onto Benz Road, Sue Drive, and Buckhom Lane); and, if Step I improvements do not result in the desired traffic reduction, authorize staff to install Step 2 improvements (signing and striping restricting all but outbound right -turn movements from Benz Road and Buckhom Lane onto Copper Hill Drive). Tlie proposed restrictions on Copper Hill Drive at Buckhorn Lane is contingent on the County Board of Supervisor's approval. BACKGROUND During the meeting of January 24, 2006, City Council directed staff to conduct further reviews into proposed traffic restrictions on Benz Road, and report back at the February 28, 2006 City Council meeting. (Tlie Agenda Item for the January 24, 2006 City Council meeting is included as Exhibit "D.") On February 22, 2006, staff will meet with Crosscreek residents to discuss their concerns and other possible alternatives on this matter. Staff will present the outcome of this meeting at the February 28, 2006 City Council Meeting. As requested, staff has further reviewed the possibility of placing turn restrictions at intersections within the internal neighborhood. Such restrictions could be very disruptive and even more inconvenient to many of the residents within the neighborhood. These restrictions would have an impact on local outbound trips, as well as the inbound trips needing to be controlled. The originally proposed turn restrictions are to be placed at intersections along major arterials. The goal being to keep traffic, which is not directly accessing local properties, on the arterial street network where those trips belong. APPROVE1 Staff surveyed the different routes that residents may choose to access their properties if the restrictions are applied. Staff recorded increased travel distances and travel times for those routes. These studies indicated that travel distance would increase by up to 2.5 miles, or up to seven minutes of additional time. After completing the additional studies, staff still recommends the same two-step plan of action as presented at the previous meeting as follows: Step I Restrict left-tums from Bouquet Canyon Road onto Benz Road and Sue Drive during morning peak hours. Restrict right-tums from Copper Hill Drive onto Benz Road and Buckhorn Lane during evening peak hours. Step I will be implemented and monitored for four months to see if it achieves the desired trip reduction on Benz Road (to less than 2,000 trips per day). Should Step I fail, Step 2 will be implemented (see Exhibit "B"). Step 2 Full-time turn restrictions at the intersection of Copper Hill Drive at Benz Road and Buckhom Lane; allowing only outbound right-tums at these intersections (see Exhibit "C"). ALTERNATIVE ACTIONS Other action as deten-nined by the City Council. FISCAL IMPACT Cost estimates are approximately $1,200 for Phase 1, and $2,500 for Phase 2. Funds are available in the Striping and Signing Maintenance Account No. 4814-7335, ATTACHMENTS Exhibit "A" - Location Map Exhibit "B" - Step I Diagram Exhibit "C" - Step 2 Diagram Exhibit "D" - January 24, 2006 Benz Road Traffic Restrictions Agenda Item Z �6 4 0, BENZ ROAD AREA C QUERRA I GALTQN: x HA+P(30 1--Rc 00 7 1 cl >\ or FRAN 0 Y V., Q� r4L APDAC DM-OTHn c6i v IIFF SoQe ?00 0, CITY OF SANTA CLARITA Benz Road Area EXHIBIT "All 37-1 � w X�z a- 11 Ex 0 w L) CCLL (CKL LJ 0 < 0- 0 W M V) z Pq a: z 0 w m m C , 1. AVA n -K IWN- m -r x LLJ