HomeMy WebLinkAbout2006-02-28 - AGENDA REPORTS - I-5 MAGIC MOUNTAIN PHASE 2 (2)Agenda Item:
CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR City Manager Approval:
Item to be presented by: Curtis Nay
DATE: February 28, 2006
SUBJECT: I-5/MAGIC MOUNTAIN PARKWAY INTERCHANGE
RECONSTRUCTION PHASE 2, PROJECT NO. 51003 - AWARD
OF CONSTRUCTION MANAGEMENT SUPPORT CONTRACTS,
AND AUTHORIZE THE EXECUTION OF AGREEMENTS FOR
VARIOUS UTILITY AGENCIES
DEPARTMENT: Public Works
RECOMMENDED ACTION
1. City Council authorize construction management support totaling $2,125,000.00 for the
following contracts:
• Generate a service request for overall construction inspection services, including Quality
Assurance / Quality Control for various material testing to the County of Los Angeles in
the amount of $800,000.00.
• Award the design and construction engineering support, including construction staking to
Metro Pointe Engineers in the amount of $800,000.00.
• Award the construction material testing and soil/asphalt inspection services to Fugro
West, Inc. in the amount of $400,000.00.
• Award the Labor Compliance Services contract to Padilla and Associates in the amount
of $125,000.00;
2. Increase the following revenue accounts: Revenue Account No. 304-6197 by $1,340,000.00
and Revenue Account No. 304-6191 by $660,000.00, and appropriate these revenues into
Expenditure Account S1003304-8001 to allow for utility relocation costs;
3. Authorize the execution of the facility relocation agreement with Exxon Mobile Oil
Corporation (EMOC) in the amount of $500,000.00 for removal of EMOC utility pipelines
expenses on I-5 northbound off -ramp and Magic Mountain Parkway;
4. Authorize the execution of the facility relocation agreement with Southern California Gas
Company (SCGC) in the amount of $600,000.00 for the relocation and removal of main
transmission and distribution lines on Magic Mountain Parkway, The Old Road, and I-5
ramps;
5. Authorize the execution of the facility relocation agreement with the Los Angeles County
Sanitation District in the amount of $600,000.000 for the relocation and removal of force
main and pipe encasement on Magic Mountain Parkway, The Old Road, and I-5 ramps;
6. Approve the execution of the facility relocation agreements with other affected utility
companies in the amount of $300,000.00 for relocation, removal, and installation of utility
lines in the project limits; and
7. Authorize the City Manager or designee to execute all documents and agreements, subject to
City Attorney approval.
BACKGROUND
On October 25, 2005, City Council awarded the construction contract to Security Paving
Company, hic. in the amount of $22,914,428.23, authorized a 15 percent construction
contingency in the amount of $3,437,164.23, and authorized $3,437,165.00 for construction
management support. The remaining balance of the construction management support will be
expended during the time of construction.
This project includes the reconstruction of the Interstate 5/Magic Mountain Parkway Interchange
and the realignment of The Old Road. This includes reconstruction of all four freeway ramps, a
new auxiliary lane in advance of the northbound off -ramp, widening of Magic Mountain
Parkway from The Old Road to the proposed northbound ramps, necessary tapers on Magic
Mountain Parkway to join existing, and realignment and widening of The Old Road from
approximately 550 meters south of Magic Mountain Parkway to approximately 450 meters north
of Magic Mountain Parkway.
The project construction cost is funded through a Metropolitan Transportation Authority (MTA)
Proposition C-AB3090 grant of $10,435,000. The remaining construction cost is funded by
Newhall Land through an executed funding agreement.
Portions of I-5/Magic Mountain Parkway reconstruction work involve various utility relocation
and removal work with EMOC, SCGC, Los Angeles County Sanitation District, and other
affected utility agencies. This is necessary work to complete the construction and widening of
the freeway ramps for I-5/Magic Mountain Parkway and realignment of the intersection of The
Old Road 120 feet to the west to improve the increase of the intersection spacing of the
interchange and provide better traffic flow.
This item will also allow the City to execute future agreements with various utility agencies in
the amount of $300,000.00 if necessary. Other utility agencies performing relocation work in the
project limit include SBC/ATT, SCE, Comcast Cable, Qwest, Pacific Pipeline Oil, and Valencia
Water Company.
EMOC is required to relocate active gas pipelines and its appurtenances and remove idle
pipelines, fencing, and concrete curbing to accommodate the proposed retaining wall,
approximately 500 linear feet along the I-5 northbound off -ramp to Magic Mountain Parkway.
EMOC, SCGC, and Los Angeles County Sanitation District will be relocating, abandoning, and
installing their respective utility lines during the reconstruction of Magic Mountain Parkway and
The Old Road.
All construction costs for the above-mentioned utility relocation incurred by the City will be
reimbursed by Newhall Land.
ALTERNATIVE ACTIONS
Other action as determined by the City Council.
FISCAL IMPACT
The cost for utility work is $2,000,000.00, which increases the estimated project costs from
$30,138,556.00 to $32,138,556.00. A funding agreement was entered into between Newhall
Land and the City in October 2005, which obligates Newhall Land to form the Westside Bridge
& Thoroughfare District and to pre -pay its agreed to fair -share project costs into the District.
Fair -share allocation of project costs have been agreed to as being shared between the City, the
Valencia Bridge and Thoroughfare District, and the Westside Bridge and Thoroughfare District
and are respectively identified as:
The City has been granted $10,435,000.00 in Proposition C 25 percent funds to construct the
project. The appropriation of these funds into Account No. S1003205-8001 represents the sum
of the City's out-of-pocket costs.
All project costs in excess of the City's agreed to fair share of $10,435,000.00, including but not
limited to, $21,703,556.00 will be borne by the Valencia B&T District and the Westside B&T
District, or Newhall Land, per the executed funding agreement.
ATTACHMENTS
Project Location Map
CITY
VALENCIA B&T
WESTSIDE B&T
DISTRICT
DISTRICT
First $30,138,556.00
34%- $10,435,000.00
22%- $6,502,173.00
44%- $13,201,383.00
(percentage share/total)
Over $30,138,556.00
0%
33%
67%
The City has been granted $10,435,000.00 in Proposition C 25 percent funds to construct the
project. The appropriation of these funds into Account No. S1003205-8001 represents the sum
of the City's out-of-pocket costs.
All project costs in excess of the City's agreed to fair share of $10,435,000.00, including but not
limited to, $21,703,556.00 will be borne by the Valencia B&T District and the Westside B&T
District, or Newhall Land, per the executed funding agreement.
ATTACHMENTS
Project Location Map