Loading...
HomeMy WebLinkAbout2006-06-13 - AGENDA REPORTS - OVERLAY SLURRY SEAL PGM M0046 (2)Agenda Item: � r CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR City Manager Approval: Item to be presented by: DATE: June 13, 2006 SUBJECT: 2005-2006 ANNUAL OVERLAY AND SLURRY SEAL PROGRAM, PROJECT NOS. M0046 AND M0049 - AWARD CONSTRUCTION CONTRACT DEPARTMENT: Public Works RECOMMENDED ACTION 1. City Council approve the plans and specifications; award the construction contract for the 2005-2006 Annual Overlay and Slurry Seal Program, Project Nos. M0046 and M0049, to Security Paving Company, Inc., the lowest responsive bidder, in the amount of $7,306,572.10, and authorize a 10 percent contingency in the amount of $730,657.21; 2. Approve the expenditure of $223,500.00, from Account No. M0046001-8001 for construction management services; 3. Approve the transfer of $200,000.00 from the 2004-2005 Overlay Program Account No. M0039001-8001 to the 2005-2006 Overlay Program Account No. M0046001-8001; 4. Increase Revenue Account No. 455-4511 by $800,000.00 and appropriate to Expenditure Account No. M0046455-8001; and 5. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND The Annual Overlay and Slurry Seal project is an integral part of the City's pavement management program. Each year, streets are evaluated and identified for the need for asphalt overlay and slurry seal maintenance treatments. The overlay portion of the project will resurface streets in various areas of the City (see attached list of streets). This will provide a smoother ride APPROVED for traffic, enhance the appearance of the roadway and surrounding area, and extend the life of the roadway. Slurry seal involves the surface preparation and application of emulsion slung seal to seal cracks, enhance skid -resistance properties, and also increase pavement life. The streets to be included in this program are located throughout the City. To ensure efficient and proper procedures in construction, a full -rime inspector must be assigned to the project. Costs for construction inspection services were anticipated and identified in the original budget. Pavement Engineering, Inc. has extensive experience in construction management and inspection. Pavement Engineering, Inc. will be responsible for the field review and inspection of the project. Construction is estimated to be completed in 90 working days. Staff recommends adding construction inspection services for this project to the contract with Pavement Engineering, Inc. in an amount of $223,500.00. Staff has identified savings from the Fiscal Year 2004-2005 Annual Overlay and Slung Seal Project Account No. M0039001 in the amount of $200,000.00, and requests that these funds be transferred to the 2005-2006 Annual Overlay and Slurry Seal Project Account No. M0046001. On May 25, 2006, the City's Purchasing Division received the following bids for the project: Comvany Location Bid Amount Sully -Miller Contracting Anaheim, CA $7,656,498.51 Security Paving Company Sun Valley, CA $7,306,572.10 Granite Construction Co. Watsonville, CA $7,754,871.00 The Engineer's Estimate for the construction of this project is $8.0 million. The lowest bid was submitted by Security Paving Company, Inc. in the amount of $7,306,572.10. After reviewing the bid summary, staff verified the apparent low bidder's contractor's license, surety companies, and project references. Based on the investigation, staff recommends awarding the construction contract to Security Paving Company, Inc., the lowest responsive bidder, in the amount of $7,306,572.10. As part of the annual street maintenance project, the City also updates the Pavement Management System (PMS) with any additional streets that need to be added to show the increase in maintained lane miles within the City. Recent annexations to the City added 22 lane miles to the system. The City is now responsible for the maintenance of a total of 955 lane miles. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT The following funds are currently available in the following accounts: General Fund M0046001-8001 $4,081,064.18 Gas Tax M0046201-8001 $701,887.00 Prop. C M0046205-8001 $2,000,000.00 General Fund M0049001-8001 $500,000.00 TOTAL $7,282,951.18 These funds do not adequately address the need for the 2005-2006 Overlay Program. The additional requested appropriations and transfers of : Developer Fees to General Fund to TOTAL M0046455-8001 M0046001-8001 JI $TI# II will increase the total available project budget to $8,282,951.18 which will adequately provide for anticipated project costs of $8,269,706.31, which includes construction, inspection, testing, and labor compliance costs. ATTACHMENTS List of Streets for Overlay Location Map Final Streets for Overlay 2005-2006 Overlay/Slurry Seal Project Street Name Limits of Street Avenue Hall Avenue Stanford - Avenue Crocker Creekside Road McBean Parkway - Valencia Boulevard Decoro Drive Vista Delgado Drive - Seco Canyon Road Seco Canyon Road Paragon Drive -100 feet south of Tupelo Ridge Drive Soledad Canyon Road Squib Street - Langside Drive Valley Street 8h Street - Maple Street Via Princessa Sierra Highway - City Boundary 8th Street Valley Street - Cross Street S:\PW\ENG-CIVI\05-06 overlay-Sluny0esip Info\exhibit city council memo overlay steels final list.doc Wei t - 1i� CITY OF SANTA CLARITA 2005-2006 ANNUAL OVERLAY AND SLURRY SEAL PROGRAM - - NTS