Loading...
HomeMy WebLinkAbout2006-04-25 - RESOLUTIONS - MC 03-358 KEYSTONE (2)RESOLUTION NO. 06-37 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA, CALIFORNIA, APPROVING MASTER CASE 03-358 (VESTING TENTATIVE TRACT MAP 60258, GENERAL PLAN AMENDMENT 03-002, ZONE CHANGE 03-002, CONDITIONAL USE PERMIT 03-016, HILLSIDE REVIEW 03-006, OAK TREE PERMIT 03-066), AND CERTIFYING THE ENVIRONMENTAL IMPACT REPORT (SCH #2004081017) FOR THE DEVELOPMENT OF THE 246 -ACRE KEYSTONE PROJECT IN THE CITY OF SANTA CLARITA THE CITY COUNCIL OF THE CITY OF SANTA CLARITA DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. FINDINGS OF FACT. The City Council does hereby make the following findings of fact: a. An application for Master Case 03-358, the Keystone project, was filed by the project applicant, Synergy, A Land + Development Company and Brookfield Homes, LLC (the "applicant"), with the City of Santa Clarita on August 26, 2003. The entitlement requests (collectively, "Entitlements") included: i. Approval of Vesting Tentative Tract Map 60258 to subdivide the Keystone project site into 96 single-family lots, 3 residential development lots, 1 private recreational facility lot, and lots for recreation/parks, junior high school, YMCA, utilities, roadways, manufactured slopes and open space; General Plan Amendment 03-002 to change the land use designation of the project site from Residential Very Low and Industrial Commercial with a Significant Ecological Area (SEA) overlay to Residential Suburban west of the City of Los Angeles, Department of Water and Power (DWP) right-of-way and to Residential Moderate east of the DWP right-of-way, maintaining the SEA overlay. In addition, a 0.5 acre lot south of the Santa Clara River would remain as Industrial Commercial (IC) land use designation, with no proposed development and conditions of approval would require the parcel to be dedicated to the City; iii. Zone Change 03-002 to change the land use designation of the project site from Residential Very Low and Industrial Commercial with a Significant Ecological Area (SEA) overlay to Residential Suburban west of the DWP _.. right-of-way and to Residential Medium east of the DWP right-of-way, maintaining the SEA overlay. In addition, a 0.5 acre lot south of the Santa Clara River would remain as Industrial Commercial (IC) land use Resolution No. 06-37 Page 2 designation, with no proposed development and conditions of approval would require the parcel to be dedicated to the City; iv. Conditional Use Permit 03-016 for the approval of the Innovative Application for development on ridgelines, to allow for the YMCA recreational use, and to allow for gate -guarded residential entries; V. Hillside Review 03-006, including an Innovative Application, to develop on land with an average cross slope of ten percent or greater and development on ridgelines classified as secondary; and vi. Oak Tree Permit 03-066 for the removal of 3 of the 8 oak trees, two located off-site and one located on-site. b. The Keystone project is a 246 -acre site located in the central part of the City at the western terminus of Ermine Street, east of Bouquet Canyon Road between Plum Canyon Road to the north and the Santa Clara River and Soledad Canyon Road to the south. A DWP right-of-way bisects the project site. The project proposed the subdivision of the site into 132 lots for a mix of residential (single family and multi -family), recreational, educational, YMCA facility and open space uses. The original proposed project included the development of 979 dwelling units consisting of 96 single-family lots, 216 multi -family apartment units and 667 townhouse units on multi -family development pads, and finished graded lots for a junior high school and 30,476 square foot YMCA facility. The proposal included a trail system that connects to regional trails as well as on-site trails. Access to the site would be provided by the future extension of Golden Valley Road (GVR) from its northern connection at Plum Canyon and southern connection to Newhall Ranch Road. In addition, the project proposed to construct the 1,890 foot extension of GVR west of the project site to connect to Newhall Ranch Road. The project also proposed a connection to Ermine Street. The current zoning for the project site is Residential Very Low (RVL); and Industrial Commercial (IC). The applicant is proposing to change the General Plan Land Use designation and zoning for the site to Residential Suburban (RS) west of the DWP right-of-way and Residential Medium High (RMH) east of the DWP right-of-way. A small 0.5 acre parcel located south of the Santa Clara River will remain designated as IC with no proposed development. The proposed project requires 5.4 million cubic yards (mcy) of grading (plus 1.8 mcy of remedial grading) all of which will be balanced on-site. The grading is required for construction of the project, and the extension of Golden Valley Road west of the project site. C. The project application was deemed complete on January 6, 2004. d. On June 25, 1991, the City Council adopted Resolution No. 91-98, adopting the General Plan of the City of Santa Clahta and certifying the Environmental Impact Report. The City's General Plan presently designates the Keystone project site as Residential Very Low and Industrial Commercial with Significant Ecological Resolution No. 06-37 Page 3 �. Area ("SEA") Overlay. Zoning on the Keystone project site is presently Residential Very Low (RVL) and Industrial Commercial (IC). e. Although the project site is vacant, the site is not in pristine condition as portions have been subject to mining and farming activities in the past. In addition, the site exhibits scars from illegal off-road activity, mostly associated with motorcycles and Quad -runners. Also, the site includes trash, construction debris, abandoned automobile parts and numerous 55 -gallon drums. In addition, a DWP right-of-way bisects the project site. f. The project site comprises approximately 246 acres that include portions of the low-lying Santa Clara River channel and adjacent northeast -southwest trending ridges. Portions of the ridges have been eroded into elevated plateaus. Topographically, the site consists of two steep canyons, three ridgelines (one primary and two secondary) and a series of mesas. The site drains to the south and discharges into the Santa Clara River. The most southeasterly canyon drains portions of the project site, as well as some off-site development to the east. This canyon is steep sided and supports riparian vegetation. The other canyon is the location of the Department of Water and Power property, which includes the transmission lines. This canyon is less steep and supports a coastal sage scrub plan community. The project site includes 8 oak trees consisting of 7 Coast Live Oak and 1 Coast Live Oak/Tucker's Oak hybrid. The proposed development would impact three of the oak trees. g. In accordance with the California Environmental Quality Act ("CEQA"), the City of Santa Clarita is the identified lead agency, and the City Council is the decision- making body, for the Keystone project. The City's Planning Commission is a recommending body for the Keystone project. The City of Santa Clarita prepared an Initial Study for the Keystone project, which determined that the project may have a significant effect on the environment and that an environmental impact report must be prepared. The Initial Study determined that the following areas must be addressed in the Keystone project Environmental Impact Report ("EIR"): geotechnical hazards, flood, traffic/access, air quality, noise, biological resources, land use, water services (including both water demand/supply and water quality), solid waste disposal, education, library services, parks and recreation, fire services, sheriff services, human made hazards, visual resources, population/housing/employment, cultural resources, floodplain modifications and wastewater disposal. h. An initial Notice of Preparation ("NOP") for the Entitlements was circulated to affected agencies, pursuant to CEQA statutes and the CEQA Guidelines (Title 14, Cal. Code of Regs. §§ 15000 et seq.), for thirty days, beginning on August 2, 2004, and numerous comments from agencies and the public were received in response. Agencies that received the NOP include, but are not limited to, the County of Los Angeles, the Regional Water Quality Control Board Los Angeles Region, the California Department of Fish and Game, the U.S. Army Corps of Resolution No. 06-37 Page 4 Engineers, the U.S. Fish and Wildlife Service, the South Coast Air Quality Management District, law enforcement agencies, school districts, waste haulers, water agencies and transportation agencies serving the Santa Clarita Valley in accordance with the consultation requirements contained in the CEQA statutes and CEQA Guidelines. i. A scoping meeting was held at the City of Santa Clarita City Council Chambers on August 26, 2004, to obtain information from the public as to issues that should be addressed in the EIR. Notice of the scoping meeting was published in The Signal newspaper on August 5, 2004, and was mailed to all property owners within 500 feet of the project site, in addition to approximately 80 agencies. Approximately 21 people attended the scoping meeting. j. On April 5, 2005, the Planning Commission conducted a site tour of the Keystone project site. k. A Draft Environmental Impact Report for the Keystone project ("Draft EIR") was prepared and circulated for review and comment by affected governmental agencies and the public, and all issues raised by the Initial Study, and by comments received on the NOP have been considered, in compliance with CEQA. The Notice of Availability/Notice of Completion for the Draft EIR was filed, posted and advertised on July 19, 2005, and the public review period extended for 45 days, from July 19, 2005 through September 1, 2005, all in accordance with CEQA. All written comments received prior to and after September 1, 2005, were accepted for inclusion in the Final EIR Responses to Comments. 1. The Keystone project was duly noticed in accordance with the noticing requirements for each of the Entitlements. The project was advertised in The Signal, through on-site posting 14 days prior to the hearing, and by direct first- class mail to property owners within 1000 feet of the Keystone project area. M. The Planning Commission held duly -noticed public hearings on the Keystone project on June 7, August 30, September 20, November 15, 2005 and January 17, 2006. These hearings were held at City Hall, 23920 Valencia Boulevard, Santa Clarita, at 7:00 p.m. Two of the five public hearings were held for the purpose of providing an opportunity for the Planning Commission and the public to consider focused discussions on the environmental issue areas discussed in the Draft EIR. The June 7, 2005 public hearing was to provide an overview presentation of the proposed entitlements requested. The Planning Commission closed the public hearing on January 17, 2005. i. On June 7, 2005, the Planning Commission opened the public hearing for the Keystone project, received a presentation on the Keystone project from staff and the applicant, and received public testimony regarding the project. Resolution No. 06-37 Page 5 ii. On August 30, 2005, Planning Commission staff responded to Planning Commission and public issues/concerns, discussed the contents and conclusions of the Draft EIR and made a focused presentation on the project description and the Draft EIR analyses on Land Use, Hazards, Cultural Resources, Utilities, Geology, Population, Mineral Resources, Energy Conservation and Hydrology and Water Quality, and the applicant presented a revised project description. iii. On September 20, 2005, Planning Commission staff responded to Planning Commission and public issues/concerns, and made a focused presentation on the Draft EOR analyses on Public Services, Air Quality, Noise, Transportation, Biology, Aesthetics and Alternatives. At the conclusion of the hearing, the Planning Commission directed staff to return to the November 15, 2005 meeting with a presentation and discussion on several development alternatives. iv. On November 15, 2005, Planning Commission staff responded to Planning Commission and public issues/concerns, and presented three development scenarios at the request of the Planning Commission. The three scenarios included the following: 1. Scenario "A" - the applicant's revised project description included a total of 648 residential units (96 single-family lots, 164 detached single family units and 388 for -sale multi -family residential units); a six -acre turnkey public park with a zero -depth water feature, dog park, picnic areas and non -programmable sports fields; smaller view parks with access from each of the residential development pads; pedestrian paseos and trails; a 1.5 -acre private recreational facility for the residential uses; Junior High School and YMCA development pads to be deeded to the Hart Union School District and YMCA, respectively; a $2,000,000 contribution to the Hart Union School District for their performing arts program; and a $200,000 contribution to the City for the construction and extension of the multi -use trail east of the project site. 2. Scenario "B" — a Single Family alternative as analyzed in the Draft EIR, included a total of 383 single family residential lots; and Junior High School and YMCA development pads to be offered for sale. 3. Scenario "C" — staff's alternative which includes a total of 499 residential units (96 single-family lots, 223 detached single family residential units and 180 for -sale townhome units); a six -acre turnkey public park with a zero -depth water feature, dog park, picnic areas and non -programmable sports fields; smaller view parks with access from each of the residential development pads; Resolution No. 06-37 Page 6 pedestrian paseos and trails; a 1.5 -acre private recreational facility for the residential uses; and Junior High School and YMCA development pads to be deeded to the Hart Union School District and YMCA, respectively; a $2,000,000 contribution to the Hart Union School District for their performing arts program. At the conclusion of the hearing, the Planning Commission directed staff to prepare all of the necessary approval documents (resolutions, ordinances, findings of fact, mitigation and monitoring reporting program, conditions, etc.) for development Scenario "C" that proposes 499 residential units, for adoption by the Planning Commission for recommendation of approval to the City Council and to incorporate the following requirements into the conditions of approval for the project: 4. Eliminate the vehicular access from Ermine Street to the project site and construct a cul de sac at the western end of Ermine Street with a pedestrian trail to connect to Golden Valley Road. 5. Provide language requiring the applicant to construct traffic mitigation on Dorothy Street and Steinway Street. 6. Require applicant to inform future residents of the proposed development that the Saugus Speedway may become operational in the future. 7. Include the following project benefits as part of meeting the Innovative Criteria under the Hillside Ordinance: a. Contribution of $200,000 towards the construction of the Santa Clara River trail east of the project site. V. As a result of comments received from the Planning Commission and its staff, from governmental agencies and from the public, the applicant modified the Keystone project, as shown on the modified vesting tentative tract map/site plan, incorporated herein by this reference, and described above in section "iv.3." As a result of these modifications, the revised site plan is now proposing a total of 499 dwelling units (96 single-family lots, 223 detached single family units and 180 for -sale townhome units). vi. The Final EIR, incorporated herein by reference as Exhibit `B," includes the Draft EIR, comments on the Draft EIR, and the following: responses to written comments on the Draft EIR, responses to public testimony regarding Draft EIR issues raised at the public hearings during the public comment period, modifications to the Draft EIR text, and the Mitigation Resolution No. 06-37 Page 7 r Monitoring and Reporting Program ("MMRP"). The Draft EIR was presented to the Commission on August 30, 2005 and September 20, 2005 and the remaining Final EIR documents were prepared and provided to the Planning Commission on January 3, 2006. On January 3, 2006, a copy of the responses to comments from the Final EIR was sent to each agency and individuals who submitted timely comments on the Draft EIR. The Planning Commission has considered the Final EIR prepared for the Keystone project, as well as information provided in staff reports, the amended text of the Final EIR, information presented to the Planning Commission from experts, and information presented in public testimony, including letters submitted to the Planning Commission following the close of the Draft EIR public comment period up to and including September 1, 2005, prior to recommending approval of the Keystone project. vii. The Final EIR, the Mitigation Monitoring and Reporting Plan ("MMRP"), and a Statement of Overriding Considerations for the Keystone project have been prepared and circulated in compliance with CEQA. viii. The Planning Commission has recommended that the City Council adopt a Statement of Overriding Considerations for those impacts of the Keystone project that cannot be mitigated to less than significant levels, and has recommended certification of the Final EIR, and the Mitigation Monitoring and Reporting Plan ("MMRP"), by Resolution No. P06-02, adopted on January 17, 2006. ix. At its hearings on the Keystone project, listed above, the Planning Commission considered staff and consultant presentations, staff reports, applicant presentations, information presented to the Commission to assist in its understanding of the Keystone project, the Keystone project EIR, and public comments, and public testimony on the Keystone project and the Final EIR for the Keystone project. Based upon the staff and consultant presentations, staff reports, applicant presentations, public comments and testimony the Commission finds that the Keystone project, as modified, will not adversely affect the health, peace, comfort, or welfare of persons residing in the area; nor will the Keystone project be materially detrimental to the use, enjoyment, or valuation of property in the vicinity of the project site; nor will the Keystone project jeopardize, endanger or otherwise constitute a menace to the public health, safety, or general welfare since the project conforms with the zoning ordinance and is compatible with surrounding land uses. The Keystone project proposes the extension of all utilities and services to the project site. Currently, all required utilities and services are available --- at locations adjacent to the project site. Resolution No. 06-37 Page 8 X. The location of the documents and other materials which constitute the record of proceeding upon which the decision of the Planning Commission is based on the Master Case 03-358 project file within the Community Development Department and is in the custody of the Director of Community Development. n. The City Council held a duly noticed public hearing on the Keystone entitlements on March 28 and continuing on April 25, 2006. On March 28, 2006, the City Council recommended, and the applicant agreed, to further modify the project, including the following revision: i. Elimination of the Planning Commission recommendation eliminating the connection of Ermine Street to the proposed project, requiring the applicant to provide a connection from the project east to Ermine Street. The Keystone project as modified would thus subdivide 246 acres into 96 single- family lots, 3 development pads for 223 detached single family residential units and 180 townhome units, a Jr. High School lot and YMCA lot, a 6 -acre public park lot, a 1.6 -acre private recreation facility lot, and lots for recreation/parks, utilities, roadways and open space, and consist of 499 residential dwelling units, and approximately 137 on-site acres of open space, including natural and graded lots to be owned and maintained by the HOA. o. All public hearings and meetings on the Keystone project were held by the City Planning Commission at 7:00 p.m. in the City Council Chambers, located at 23920 Valencia Boulevard, Santa Clarita. All public hearings and meetings on the Keystone project were held by the City Council at 6:00 p.m. in the City Council Chambers, located at 23920 Valencia Boulevard, Santa Clarita. All public hearings were advertised in the The Signal newspaper, and by direct first- class mail to property owners within 1000 feet of the project area. In addition, the date and time of each public hearing was posted on three signs at the project site. SECTION 2. GENERAL FINDINGS FOR — GENERAL PLAN AMENDMENT AND ZONE CHANGE. Based on the above findings of fact and recitals and the entire record, including, without limitation, the entire Keystone project EIR, oral and written testimony and other evidence received at the public hearings held on the Keystone project and the Keystone project EIR, reports and other transmittals from City staff to the Planning Commission and City Council, and upon studies and investigations made by the Planning Commission and City Council and on its behalf, the City Council finds, as follows: a. Following approval of General Plan Amendment 03-002 to the Land Use Element Land Use Map, the Keystone project is consistent with the General Plan Residential Suburban (RS), Residential Moderate (RM) and Industrial Commercial (IC) land use designations for the project site. Resolution No. 06-37 Page 9 Furthermore, General Plan Amendment 03-002 is consistent with the City's General Plan, as documented in the Keystone project EIR. Section V.I (Land Use) of the Keystone EIR, contains a detailed analysis documenting the project's consistency with the City's General Plan. b. Following approval of Zone Change 03-002 to Residential Suburban (RS), Residential Medium (RM) and Industrial Commercial (IC), the Keystone project is consistent with RS, RM and IC zoning designations on the project site. Furthermore, Section V.I (Land Use) of the Keystone EIR and the Keystone Innovative Application, document the project's consistency with the objectives of the Unified Development Code, the General Plan and development policies of the City of Santa Clarita. SECTION 3. FINDINGS FOR VESTING TENTATIVE TRACT MAP 60258. Based on the above findings of fact and recitals and the entire record, including, without limitation, the entire Keystone project EIR, oral and written testimony and other evidence received at the public hearings held on the Keystone project and the Keystone project EIR, reports and other transmittals from City staff to the Planning Commission and City Council, and upon studies and investigations made by the Planning Commission and City Council and on its behalf, the City Council finds, as follows: a. The proposed Keystone project, together with the provisions for its design and improvements, is consistent with the City of Santa Clarita's General Plan as amended by General Plan Amendment 03-002 and the Santa Clarita Unified Development Code as amended by Zone Change 03-002. The Keystone project includes development of the 246 acre site with a total of 96 single family lots, 223 detached single family residential units, and 180 for -sale townhome units. The project also includes: a 21 -acre lot for a future Junior High School and a 4 -acre lot for a future YMCA facility; both lots will be finished, graded and deeded to the Hart Union School District and YMCA, respectively; a 6 -acre turnkey public park is proposed to be deeded to the City of Santa Clarita; and a 1.5 -acre private recreation facility will be constructed for the residential uses. Approximately 133 acres of open space are included in the project and will be owned and maintained by the Homeowners Association. A 17.4 -acre open space river lot is proposed to be dedicated to the City of Santa Clarita. All of the proposed uses listed above are not uses known to create public health problems. The proposed project design has been reviewed by the appropriate City departments and external agencies, including the Los Angeles County Fire Department, for compliance with applicable codes and regulations. Conditions of approval and mitigation measures have been placed on the project to ensure compliance with state and local regulations. b. The Keystone project site is physically suitable for the type of development proposed. Development on the project site is divided by the existing DWP right-of-way. Resolution No. 06-37 Page 10 Development of the single family lots will be located west of the DWP right-of- way on land that is relatively flat. Development east of the DWP right-of-way will include three residential development pads, a 1.5 acre private recreational facility pad, a Junior High School and YMCA pad, and a pad for the proposed 6 - acre public park. Each development area is separated by open space areas with pedestrian trails and lookout points. Approximately 33% of the project site, or approximately 80 acres, is comprised of land with slope densities from 0% to 25%. Approximately 67% of the project site, or approximately 165 acres, contains slope densities of 25% to 76%. Golden Valley Road is proposed to be constructed, through the site between the future extension of Newhall Ranch Road and the north boundary of the project site. Golden Valley Road is proposed as a four lane split roadway with two lanes in each direction and a 15' wide Class 1 bike trail. To construct Golden Valley Road between these two points, a series of "mesas" or development pads would be created which preserve natural open space and provide graded open space slopes in between. The construction of Golden Valley Road will alter the eastern secondary ridgeline located on site. However, the applicant proposes to recreate the secondary ridgelines to their natural state. The construction of Golden Valley Road will also include the 1,890 foot extension west of the project site to Newhall Ranch Road. To minimize grading and emulate the natural contours of the site, project development within the site will employ unique grading techniques, such as landform and contour grading that will re-create the secondary ridgeline helping to create the appearance of the homes being built in a natural environment with a masking of the proposed structures behind the re-created ridgelines. Curvilinear street design and cul-de-sacs that open onto open space areas are used throughout the single-family residential components of the project to soften graded slopes and provide views to the open space. The manufactured slopes incorporate varying slope steepness to create the look of a natural hillside and provide opportunity to plant native vegetation. The required drainage benches and basins will be blended into the natural topography, and will be landscaped to foster a natural appearance. Bio-swales and water quality basins have been designed into the plan as unique features and are an extension of the re-created ridgelines and complete the visual image of a natural ridgeline and dale. The bio-swale diverts water to the water quality basin at the southern entrance of the project, while the functional water quality basin has been designed to appear like a small meadow. Landscaping and grading transitions from developed to natural drainage courses will be consistent and compatible with existing topography, especially in those areas that are highly visible, such as area slopes along the river and between the residential development pads. As a result, grading design will be similar to the variations of existing natural slopes. Good examples are the slopes proposed adjacent to the river, as well as the slopes proposed between residential development pads 98 and 97 and the slope between residential development pad Resolution No. 06-37 Page 11 _ 99 and the public park. Where retaining walls are needed, curvilinear walls and landscaping screening would be used where appropriate to soften the appearance of the walls. The Keystone project proposes to move approximately 5.4 million cubic yards of earth, which would be balanced on-site in terms of cut and fill, and additional remedial grading of 1.8 million cubic yards. These grading activities will stabilize the site and make it geologically suitable for development. The Keystone project has been designed to preserve the Santa Clara River corridor and to provide extensive open space. Approximately 70 acres, or 28% of the project site, will be preserved in a natural state and 80 acres, or 32% of the project site will be left as graded open space lots. The southern boundaries of the Junior High School and YMCA lots are located a minimum of 300' north of the Santa Clara River Floodplain line and a minimum of 400' north of the Santa Clara River Floodway line. Both lots are curvilinear and follow the natural contours of the Santa Clara River. Since the project is located outside the flood plain of the Santa Clara River, bank stabilization will not be necessary. Single family lots will be located west of the DWP right-of-way on a flat, previously disturbed plateau, with access to "I" Street. The development of the single family lots will alter the western secondary ridgeline located on site. However, the applicant proposes to use grading techniques that will re-create the ridgeline to its original state. The detached single family units and for -sale townhomes will be located east of the DWP right-of-way on three development pads with primary access to "I" Street and emergency access to Golden Valley Road, a regional roadway. All development is located a minimum of 300' north of the Santa Clara River. Development of the site has also been designed to preserve trees in place. Of the 8 oak trees on site, 3 will be removed. Of the 3 oak trees to be removed, 2 are located off-site and will be removed for the extension of Golden Valley Road west of the project site, and 1 oak tree is located on-site is located on Lot 115. C. The Keystone project site is physically suitable for the proposed density of development. With approval of the General Plan Amendment and Zone Change, the proposed project density is appropriate for the subject property. The Keystone project has revised their proposed number of total residential units to 499, which is a considerably lower density than the project originally proposed. The original project proposed 979 total residential units. Of the total number of units; 96 were proposed as single family lots, 216 rental apartments, and 667 multi -family units. The revised density for the Keystone project includes; 96 single family residential lots, 223 detached single family residential units, and 180 for -sale townhome units. This is a 50% reduction in the total number of residential units being proposed. In addition, the original project proposed both for -sale and rental units, this revised project has completely eliminated the rental product from the project. This revised density project is a compellation of the Resolution No. 06-37 Page 12 EIR Alternatives that were analyzed in the Draft EIR and reviewed by the Planning Commission at their meeting of September 20, 2005 and November 15, 2005. The proposed number of units will require a General Plan Amendment and Zone Change from the existing Residential Very Low and Industrial Commercial designations to Residential Suburban west of the DWP right-of-way and Residential Medium east of the DWP right-of-way, which would permit a total of 730 residential units with a slope density calculation. However, the applicant is proposing a total of 499 residential units, which is significantly less than what would be allowed with the approval of a General Plan Amendment and Zone Change to RS and RM. The original proposed project included a request for a General Plan Amendment and Zone Change to Residential Suburban west of the DWP right-of-way and Residential Medium High east of the DWP right-of-way, which would have permitted a total of 1,243 residential units with the slope density calculation. d. The design of the subdivision or the proposed improvements are not likely to cause substantial environmental damage or substantially and unavoidably injure fish and wildlife or their habitat. The potential environmental impacts of the Keystone project are analyzed in the project's EIR. The project includes many measures specifically designed to avoid environmental impacts, or to reduce the level of potential impacts to less than significant. Of the project's potential impacts, all are either less than significant or have been reduced to a less than significant level through imposition of feasible mitigation measures. The Keystone project is located in the center of the City and is surrounded by existing development, including residential, commercial, and light industrial. To the north is the recent County approved and under construction, residential development of 498 residential units. Single family residential development also exists directly east of the project site in the Ermine Street neighborhood. West of the proposed project site is the recently approved Riverpark residential development of 1,089 units, which includes single family, multi -family and commercial development. High intensity industrial/commercial uses exist to the south of the project site, south of the Santa Clara River. Development within the site is concentrated within four residential development pads, one private recreational facility pad, and two public/institutional development areas, each area separated by graded open space lots that contain pedestrian paseos leading to knoll/view park areas. The project's densities and intensities are well below those that were originally proposed and the density that could potentially be permitted with the requested General Plan Amendment and Zone Change. The proposed General Plan Amendment and Zone Change would allow with the slope density calculation a maximum of 730 residential units. Resolution No. 06-37 Page 13 r However, the applicant is proposing a maximum of 499 residential units, of which 319 are single family units. The project tailors its development to the site's physical features to minimize impacts to the site's significant natural topographic prominent features (Santa Clara River, Primary Ridgeline, and most of the western canyon). Approximately 52 of the 246 acres are proposed to be built with residential development on four separate development pads, and one private recreational facility pad, and approximately 32 acres will be used for the development of the Junior High School, YMCA and public park sites. The remaining acreage is proposed for natural open space, graded slope lots and streets. The project design concentrates development on the relatively flat and previously disturbed portions of the site. Approximately 80 acres of the project site, is comprised of land with slope densities from 0% to 25%. The remaining 165 acres of the project site range in slope density from 25% to 76%. The project design will disturb two ridgelines the City has classified as secondary ridgelines. The western secondary ridgeline west of the DWP right-of-way has experienced previous degradation with past activity on the site and is the flat plateau area where the 96 single family residential lots are proposed. The applicant is proposing to re -construct the secondary ridgeline to its natural state to help screen the proposed single family units. The eastern secondary ridgeline, east of the DWP right-of-way has experienced previous degradation from mining and illegal off-road vehicle activity. The intrusion into this ridgeline will be to construct the extension of Golden Valley Road through the project site to connect north of the site with Plum Canyon and west of the site to connect with the Cross Valley Connector, which is the City's highest priority roadway. Moreover, the project design significantly exceeds the minimum standards identified in the City of Santa Clarita Ridgeline Preservation and Hillside Development Guidelines. Additionally, the applicant voluntarily redesigned the project to reduce the density and impact to the site. Furthermore, most of the western canyon area, which is located within the DWP right-of-way. will be preserved in its natural state. The Keystone project has been designed to preserve the Santa Clara River corridor and to provide extensive open space. Approximately 150 acres, or 61% of the project site, will be preserved as open space in a natural state and as graded slope lots. Approximately 17 of the 150 acres of open space, constituting the acreage of the Santa Clara River through the project site, will be dedicated to the City as permanent open space. While the Santa Clara River runs along the southern portion of the project site south of the future extension of Golden Valley Road, its location and proximity to the rest of the project is separated by a distance, of more than 300' lineal feet and a height elevation change of more than 100', with the River being at a lower elevation than the rest of the project site. The residential portion of the project site is located north of Golden Valley Road more than 1,100' north of the 100' buffer for the Santa Clara River. The Junior High School Site and YMCA are Resolution No. 06-37 Page 14 located south of Golden Valley Road. The extent of the Junior High School site and its sports fields are located approximately 200' north of the 100' buffer for the Santa Clara River and has an elevation difference of approximately 100' higher than the River. The City's required 35' multi -use trail is located just north of the 100' buffer of the Santa Clara River. The trail does not encroach into the River. In response to comments from the California Department of Fish and Game, and the Santa Monica Mountains Conservancy, the Biological Assessment prepared by TLC (Appendix 3 of the Draft EIR) addresses the potential for the site to provide for wildlife movement and notes that the site is not within an area that exhibits potential for connecting the Santa Clara River with the Angeles National Forest. The portion of the Angeles National Forest approximately 3.3 miles to the south is separated from the site, by existing commercial development, Soledad Canyon Road, and the Antelope Valley Freeway. The Angeles National Forest, located approximately 2.7 miles to the north is separated by existing and future approved development. With buildout of the SunCal project to the north (currently under construction) and Riverpark (recently approved) to the west, the site (under future conditions) and existing and future residential development in the unincorporated County area surrounding the site will be developed. The Santa Clara River is the only regional wildlife corridor in the area. The portion of the site that includes the Santa Clara River will be preserved with appropriate buffers, ensuring that the Santa Clara River continues to serve as the primary east -west corridor. Development of the site has also been designed to preserve trees in place. Of the 8 oak trees on site, only 3 will be removed. Of the 3 oak trees to be removed, 2 are located off-site and will be removed for the extension of Golden Valley west of the project site, and 1 oak tree is located on-site on Lot 115. The design of the subdivision or type of improvements is not likely to cause serious health problems. The project would be required to comply with the mitigation measures identified in the EIR and the recommended conditions of approval for the project. The Keystone project's potential impacts on health were analyzed in the project's EIR, and were found to be either less than significant or significant but mitigatable to a level of less than significant. The project is primarily residential, with a component of institutional/recreational uses. The project site will not contain uses that will be engaged in hazardous activities. e. The design of the subdivision or type of improvement will not conflict with easements, acquired by the public at large, for access through or use of, property within the proposed subdivision. Adjacent properties can be accessed from the surrounding system of public streets Resolution No. 06-37 Page 15 and roads. The Keystone project site will be served by an internal street system with access from the extension of Golden Valley Road. The project will also add approximately 2,650 feet (1/2 mile) to the Santa Clara River Regional Trail through the project site, which will be open to the general public. SECTION 4. FINDINGS FOR CONDITIONAL USE PERMIT 03-016. Based on the above findings of fact and recitals and the entire record, including, without limitation, the entire Keystone project EIR, oral and written testimony and other evidence received at the public hearings held on the Keystone project and the Keystone project E1R, reports and other transmittals from City staff to the Planning Commission and City Council, and upon studies and investigations made by the Planning Commission and City Council and on its behalf, the City Council finds, as follows: a. That the proposed location, size, design, and operating characteristic of the Keystone project's proposed use is in accordance with the purpose of the City's Unified Development Code, the purpose of the zones in which the project site is located, the Santa Clarita General Plan, as amended by General Plan Amendment 03-002, and the development policies and standards of the City. The project site currently has a General Plan land use designation and zoning of Residential Very Low, and Industrial Commercial with a Significant Ecological -- Area overlay. The applicant is proposing to develop the site with a total of 499 residential units, with a mix of 96 single family residential lots, 223 detached single family units, and 180 for -sale townhome units. In addition, the project also proposes a Junior High School and YMCA site, as well as a 6 acre public park. The City's Unified Development Code (UDC) requires a General Plan Amendment and Zone Change to develop the residential units. The applicant is requesting a review and approval of a Conditional Use Permit for gating of the residential development areas, the YMCA facility use, and approval of the Innovative Application. The proposed residential development is consistent with the Unified Development Code residential development standards with the review and approval of the above mentioned entitlements. b. That the location, size, design, and operating characteristics of the proposed use will be compatible with and will not adversely affect or be materially detrimental to adjacent uses, residents, buildings, structures, or natural resources, with consideration given to: i. Harmony in scale, bulk, coverage, and density; The Keystone project is in harmony in scale, bulk, coverage and density with adjacent uses. The Keystone project is located in the center of the r City and is surrounded by existing and approved single family and multi- family residential uses, commercial and industrial development. Development within the site is concentrated within four residential development pads, one private recreational facility pad, and two Resolution No. 06-37 Page 16 public/institutional development areas, each area separated by natural open space and graded open space lots that contain pedestrian paseos leading to knoll/view park areas. The project's densities and intensities are well below the 979 units that were originally proposed and the density that could potentially be permitted with the requested General Plan Amendment and Zone Change. The proposed General Plan Amendment and Zone Changes would allow with the slope density calculation a maximum of 730 residential units. However, the applicant is proposing a maximum of 499 residential units, of which 319 are single family units. Residential densities proposed with the Keystone project are consistent with surrounding densities. For example, the Keystone single family residential lots are a minimum of 5,400 square feet in size and are as large as nearly 17,000 square feet, which is larger than the surrounding single family residential lots of the Ermine Street neighborhood. The Ermine Street neigborhood was developed under the County of Los Angeles with a zoning requirement of a minimum 5,000 square foot lot size. The Keystone single family detached units and townhome units are a transition from the Ermine Street neighborhood smaller lots to the larger lots of the Keystone single family residential area. Existing residential development in close proximity of Keystone consist of single family dwellings that are two stories in height, and approved multi- family residential buildings that exceed two stories in height or 35 feet. The proposed Keystone project will not exceed the UDC's maximum building heights for the RS or RM zones. The proposed single family, townhome units, YMCA, and Junior High School will be 35 feet in height or less and will have a maximum of two stories in height ii. The availability of public facilities, services, and utilities; Public facilities, services and utilities are available to the Keystone project and the provision of these facilities, services and utilities will not adversely affect or be detrimental to adjacent residents, buildings, structures, or natural resources. The project site is in a sensible location for development. The project site is located in an area planned for development in the central portion of the City of Santa Clarita, is adjacent to or near existing and planned infrastructure, utilities and other urban services, public transit, transportation corridors and major employment areas. The site has already been disturbed by mining and illegal off-road activities. The project includes mitigation measures and recommended conditions of approval that provide for the coordination of public infrastructure development with development of the site iii. The harmful effect, if any, upon desirable neighborhood character; The project design concentrates development on the relatively flat and previously disturbed portions of the site. Approximately 80 acres of the Resolution No. 06-37 Page 17 project site, is comprised of land with slope densities from 0% to 25%. The remaining 165 acres of the project site range in slope density from 25% to 76%. The project design will disturb two ridgelines the City has previously classified as secondary ridgelines. The western secondary ridgeline west of the DWP right-of-way has experienced previous degradation with past activity on the site and is the flat plateau area where the 96 single family residential lots are proposed. The applicant is proposing to re -construct the secondary ridgeline to its natural state to help screen the proposed single family units. The eastern secondary ridgeline, east of the DWP right-of-way has experienced previous degradation by illegal off-road vehicle activity. The intrusion into this ridgeline will be to construct the extension of Golden Valley Road through the project site to connect north of the site with Plum Canyon and west of the site to connect with the Cross Valley Connector, which is the City's highest priority roadway. Moreover, the project design significantly exceeds the minimum standards identified in the City of Santa Clarita Ridgeline Preservation and Hillside Development Guidelines. Additionally, the applicant voluntarily redesigned the project to reduce the density and impact to the site. Furthermore, most of the western canyon area, which is located within the DWP right-of-way. will be preserved in its natural state. The Keystone project has been designed to preserve the Santa Clara River corridor and to provide extensive open space. Approximately 156 acres, or 63% of the project site, will be preserved as open space in a natural state and as graded slope lots, including the 6 -acre public park. Approximately 17 of the 156 acres of open space, constituting the acreage of the Santa Clara River through the project site, will be dedicated to the City as permanent open space. iv. The generation of traffic and the capacity and physical character of surrounding streets; The Keystone project is compatible with and will not adversely affect or be materially detrimental to adjacent residents due to the generation of traffic and physical character of surrounding streets. The Keystone project will be accessed by the future extension of Golden Valley Road that will extend from the projects western boundary to its northern boundary. The applicant will construct the roadway including the 1,890 foot extension west of the project site to connect to the Cross Valley Connector, the City's highest priority roadway. As a result of these roadway improvements, particularly upon the connection to the Cross Valley Connector, the Keystone project will improve the level of service along significant portions of Soledad Canyon Road, the Valley's primary east - west route as well as, Whites Canyon Road and Bouquet Canyon Road. In addition, the Keystone project will contribute $6,981,435, consisting of Bridge and Thoroughfare fees and dedication of right-of-way. Resolution No. 06-37 Page 18 V. The suitability of the site for the type and intensity of use or development which is proposed; and The Keystone site is suitable for the type and intensity proposed and will not adversely affect or be materially detrimental to adjacent residents or uses. The Keystone project is located in the center of the City and is surrounded by existing and approved development, including residential, commercial, and industrial uses. Development within the site is concentrated within four residential development pads, one private recreational facility pad, and two public/institutional development areas, each area separated by graded open space lots that contain pedestrian paseos leading to knoll/view park areas. The project's densities and intensities are well below those that were originally proposed and the density that could potentially be permitted with the requested General Plan Amendment and Zone Change. The proposed General Plan Amendment and Zone Change would allow with the slope density calculation a maximum of 730 residential units. However, the applicant is proposing a maximum of 499 residential units, of which 319 are single family units vi. The harmful effect, if any, upon environmental quality and natural resources. The Keystone project will be compatible with and not adversely affect or be materially detrimental to adjacent residents, buildings, structures, or natural resources with consideration given to the harmful effect of the project on the environment and natural resources. The potential environmental impacts of the Keystone project are analyzed in the project's EIR. The project includes many measures specifically designed to avoid environmental impacts, or to reduce the level of potential impacts to less than significant. Of the project's potential impacts, the majority are either less than significant or have been reduced to a less than significant level through imposition of feasible mitigation measures. Compliance with the conditions of approval and the mitigation measures contained in the Mitigation Monitoring Program for the Keystone project ensures that the project will be compatible with and that it will not be materially detrimental to adjacent uses, residents, buildings, structures, or natural resources. C. That the proposed location, size, design, and operating characteristics of the proposed use and the conditions under which it would be operated or maintained will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity. The Keystone project's potential impacts on the public health, safety and general welfare and on properties or improvements in the vicinity were analyzed in the project's EIR. Those impacts were either less than significant or were significant Resolution No. 06-37 Page 19 but reduced to a level of less than significant through mitigation. The project site will not contain uses that will be engaged in hazardous activities or that will be permitted to emit substantial amounts of hazardous contaminants or pollutants into the air or water. The EIR found that the proposed location, size, design, and operating characteristics of the project's proposed uses and the conditions under which they would be operated or maintained would not be materially injurious to properties or improvements in the vicinity. d. That the proposed use will comply with each of the applicable provisions of the City's Unified Development Code, except for an approved variance or adjustment. The proposed project, with an approved General Plan Amendment, Zone Change, Vesting Tentative Tract Map, Conditional Use Permit, Oak Tree Permit, and hillside Permit, is consistent with the objectives of the Unified Development Code, the General Plan, and development policies of the City of Santa Clarita. SECTION 5. FINDINGS FOR HILLSIDE DEVELOPMENT APPLICATION 03-006. Based on the above findings of fact and recitals and the entire record, including, without limitation, the entire Keystone project EIR, oral and written testimony and other evidence received at the public hearings held on the Keystone project and the Keystone project EIR, reports and other transmittals from City staff to the Planning Commission and City Council, and upon studies and investigations made by the Planning Commission and City Council and on its behalf, the City Council finds, as follows: a. The Keystone project conserves natural topographic features and appearances by means of landform grading so as to blend any manufactured slopes or required drainage benches into the natural topography. The conditions of project approval require landform grading. b. The Keystone project retains significant, natural, topographic prominent features to the maximum extent possible. Significant, natural, topographic prominent features within the project site include: (1) the Santa Clara River, which extends across the entire southern portion of the site; (2) a large western canyon that begins at the northern portion of the site and extends down to the Santa Clara River; (3) a canyon at the south easterly project site that begins off-site and extends through a portion of the site and into the Santa Clara River; (4) a primary ridgeline that is located at the north western comer of the project site, west of the DWP right-of-way; and (4) two secondary ridgelines, one west of the DWP right-of-way and one east of the DWP right-of-way. The two most prominent features (Santa Clara River and the primary ridgeline) will be preserved, and the River will be dedicated to the City. A comprehensive Resolution No. 06-37 Page 20 trail system will provide access in the future to the City's Central Park and Discovery Park. In addition, most of the western canyon area on-site will be preserved. The project design concentrates development on the relatively flat and previously disturbed portions of the site. Approximately 80 acres of the project site, is comprised of land with slope densities from 0% to 25%. The remaining 165 acres of the project site range in slope density from 25% to 76%. Approximately 63% (156 acres) of the site will remain as natural, undeveloped open space, and graded open space lots, including both the 6 -acre public park and the 17 -acre River property. The project site design preserves approximately 156 acres of open space, including the entire 17 acre portion of the Santa Clara River that is located on site, 6 acres of a public park, a majority of the on-site oak trees, as well as public trails, and neighborhood and private recreational facilities. The exterior or southern boundaries of the Junior High School and YMCA site that are located approximately 300' north of the River are curvilinear and follow the boundary of the Santa Clara River corridor. The project's multi -use Santa Clara River Trail is also curvilinear, following the river corridor. While the River runs along the southern portion of the project site south of the future extension of Golden Valley Road, its location and proximity to the rest of the project is separated by a distance of more than 300' lineal feet and a height elevation change of more than 100', with the River being at a lower elevation than the rest of the project site. The City's required 35' multi -use trail is located just north of the 100' buffer of the Santa Clara River. The trail does not encroach into the River. Since the project is located outside the flood plain of the Santa Clara River, bank stabilization will not be necessary. The Keystone project utilizes clustered sites and buildings to substantially reduce grading alterations of the terrain and to contribute to the preservation of trees, other natural vegetation and prominent landmark features and are compatible with existing neighborhoods. Project development within the site is concentrated within four residential development pads, one private recreational facility pad, and two public/institutional development areas, each area separated by graded open space lots that contain pedestrian paseos leading to knoll/view park areas. Approximately 80 acres of development will be concentrated in slope areas of less than 25% grade to reduce grading alterations and development impacts. Resulting single-family lot sizes will range from 5,400 to nearly 17,000 square feet, which is compatible and consistent with single-family development in the surrounding areas. Clustering will limit development to 31% of the site, leaving the remainder as open space and infrastructure. Resolution No. 06-37 Page 21 _ Curvilinear street design and cul-de-sacs are used extensively throughout the single-family residential components of the project to soften graded slopes. The manufactured slopes in all Planning Areas and required drainage benches and basins will be blended into the natural topography, and will be landscaped to foster a natural appearance. Naturalized landscaping and curvilinear/staggered down -drains will be used to screen and/or enhance the appearance of slope drainage devices; swale coloration would be highly compatible with the surrounding area. Landscaping and grading transitions from developed to natural drainage courses will be consistent and compatible with existing topography, especially in those areas that are highly visible, such as area slopes along the river and between each of the residential development areas. As a result, grading design will be similar to the variations of existing natural slopes. Where retaining walls are needed, curvilinear walls and landscaping screening would be used where appropriate to soften the appearance of the walls. Significant, natural, topographic prominent features within the project site include: (1) the Santa Clara River, which extends across the entire southern portion of the site; (2) a large western canyon that begins at the northern portion of the site and extends down to the Santa Clara River; (3) a canyon at the south easterly project site that begins off-site and extends through a portion of the site and into the Santa Clara River; (4) a primary ridgeline that is located at the north western corner of the project site, west of the DWP right-of-way; and (4) two secondary ridgelines, one west of the DWP right-of-way and one east of the DWP right-of-way. The two most prominent features (Santa Clara River and the primary ridgeline) will be preserved, and the River will be dedicated to the City. A comprehensive trail system will provide access in the future to the City's Central Park and Discovery Park. In addition, most of the western canyon area on-site will be preserved. In addition, development within the Planning Areas has been designed to preserve trees in place. Of the 8 oak trees located within the project envelope, 3 will be removed, 2 of them off-site for construction of the 1,890 foot extension of GVR and 1 on-site located on lot 115. d. The Keystone project utilizes building setbacks, building heights and compatible structures and building forms that serve to blend buildings and structures with the terrain. Keystone building setbacks, building heights and compatible structures and building forms will be designed to blend with the surrounding terrain. All -- structures on site will meet the maximum building heights of the zone, and will not obstruct views of the skyline silhouette. Building forms will be consistent with the City's Architectural Guidelines Resolution No. 06-37 Page 22 e. The Keystone project will conserve and introduce plant materials to protect slopes from slippage and soil erosion and to minimize visual effects of grading and construction on hillside areas, including the consideration of the preservation of prominent trees and, to the extent possible, reduce the maintenance cost to public and private property owners. Naturalized vegetation will be reintroduced into portions of the project to protect slopes and minimize visual effects of grading and construction on visible external slopes. Naturalized vegetation will be introduced along the river edge, canyon area, and other large prominent slopes. Particular attention will be paid to plant types that are drought -resistant and fire retardant. Development within the site has been designed to preserve trees in place. Of the 8 oak trees within the development envelope, 3 will be removed, 2 of them located off-site and 1 located on-site on Lot 115. f. The Keystone project utilizes curvilinear street design and improvements that serve to minimize grading alterations and emulate the natural contours and character of the hillsides. Curvilinear street design and cul-de-sacs are used extensively throughout the single-family residential component of the project to soften graded slopes. The manufactured slopes on site and required drainage benches and basins will be blended into the natural topography, and will be landscaped to foster a natural appearance. Naturalized landscaping and curvilinear/staggered down -drains will be used to screen and/or enhance the appearance of slope drainage devices; swale coloration would be highly compatible with the surrounding area. Landscaping and grading transitions from developed to natural drainage courses will be consistent and compatible with existing topography, especially in those areas that are highly visible, such as area slopes along the river and between the residential development areas. g. The Keystone project utilizes grading designs that serve to avoid disruption to adjacent property. Landform or contour grading is incorporated into the design of the Keystone project, as reflected in the recommended conditions of project approval. Development will be clustered to minimize disruption to adjacent areas. Contour grading has been utilized to emulate the natural topography on the site's most visible slopes, such as those slopes along the river and between the residential development pads. The project site design preserves the community's views of the primary ridgeline and will re-create the secondary ridgelines to provide a natural screen of the proposed residential units. Additionally, the project has been redesigned to reduce the density to a total of 499 residential units, thereby reducing the impacts to the adjacent neighborhoods and community. Resolution No. 06-37 Page 23 Slope setbacks as outlined by the project geotechnical study will be maintained to avoid disruption to adjacent properties. To minimize grading and emulate the natural contours of the site, project development within the site will employ unique grading techniques, such as landform and contour grading that will re-create the secondary ridgeline helping to create the appearance of the homes being built in a natural environment with a masking of the proposed structures behind the re-created ridgelines. Curvilinear street design and cul-de-sacs that open onto open space areas are used throughout the single-family residential components of the project to soften graded slopes and provide views to the open space. The manufactured slopes incorporate varying slope steepness to create the look of a natural hillside and provide opportunity to plant native vegetation. The required drainage benches and basins will be blended into the natural topography, and will be landscaped to foster a natural appearance. Bio-swales and water quality basins have been designed into the plan as unique features and are an extension of the re-created ridgelines and complete the visual image of a natural ridgeline and dale. The bio-swale diverts water to the water quality basin at the southern entrance of the project, while the functional water quality basin has been designed to appear like a small meadow. Landscaping and grading transitions from developed to natural drainage courses will be consistent and compatible with existing topography, especially in those areas that are highly visible, such as area slopes along the river and between the residential development pads. As a result, grading design will be similar to the variations of existing natural slopes. Good examples are the slopes proposed adjacent to the river, as well as the slopes proposed between residential development pads 98 and 97 and the slope between residential development pad 99 and the public park. Where retaining walls are needed, curvilinear walls and landscaping screening would be used where appropriate to soften the appearance of the walls h. Site design and grading that provide the minimum disruption of view corridors and scenic vistas from and around any proposed development shall be utilized. The Keystone development will be clustered to minimize disruption to adjacent areas. Site design and contour grading techniques are used to emulate the natural topography on the site's most visible slopes, such as those slopes along the river and between the residential development areas, and to minimize disruption to view corridors and scenic vistas. Clustering of development in previously disturbed areas, will also serve to avoid disruption of view corridors and scenic vistas. The project site design preserves the community's views of the primary ridgeline, as well as, re-creates the secondary ridgelines to help screen the residential units, -- and thus would not result in the depreciation of ridgeline appearance in the vicinity. The site plan includes development primarily within the large, relatively flat, and disturbed areas of the project site, parts of the proposed development will Resolution No. 06-37 Page 24 encroach onto the secondary ridgelines, such as the extension and construction of Golden Valley Road, the Junior High School and YMCA sites which are located on the eastern secondary ridgeline. The western secondary ridgeline is the flat plateau area where the 96 single family lots are proposed. The applicant proposes to re-create both secondary ridgelines to help screen the residential units. When viewed on and off-site, these two ridgelines are currently indistinguishable from other neighboring unidentified ridgelines, and do not visually dominate the Santa Clarita Valley landscape. They do not appear prominent in size as compared to the hillsides or mountain terrain of which they are a part, are not silhouetted against the sky, do not serve as a significant natural backdrop feature, do not separate communities, are not visually dominant in the view from existing development or major corridors, and are not areas of significant ecological, historical or cultural importance like those that connect park or trail systems. Furthermore, both secondary ridgelines have been degraded by past mining activities and illegal off-road activity. The first of two City classified secondary ridgelines on site is located east of the DWP right-of-way and referred to as the eastern secondary ridgeline for purposes of this project. The ridgeline currently traverses the site in a southwesterly and northeasterly axis ending just north of the existing Ermine Street termination. This ridgeline extends approximately 3,300 feet across the site with a beginning elevation of approximately 1,430 feet above the mean sea level (msl) and ascends to approximately 1,600 feet msl at the Ermine Street location. This secondary ridgeline exhibits scars from past farming and mining activity, which have left large stair -step terraces on the south -facing slope. Additional scaring has occurred due to off-road vehicle activity. Project implementation would require cut and fill grading operations to prepare the project site for the proposed development. The portion of this ridgeline that will be impacted by project development is not visually prominent or dominant, when viewed either from the project site, from neighboring properties, or from major corridors. The extension of Golden Valley Road, which will help to alleviate congestion on Whites Canyon Road and Bouquet Canyon Road, will also encroach on this ridgeline. In addition, landform grading techniques would be implemented separating the development pads creating a re -constructed ridgeline just west and north of the existing ridge. Therefore, this ridgeline has already been degraded, any minimal visual impact to the lower portion of the ridgeline caused by the project will be confined to the immediate local neighborhood and project residents, and the ridgeline will be re -constructed to follow a similar southwesterly to northeasterly axis like the existing ridgeline. The second City -classified secondary ridgeline extends from the primary ridgeline on the north and continues generally in a southerly direction along the DWP right- of-way. The ridgeline extends approximately 2,200 feet across the 45 -acre portion of the site. As typical of the area's topography, the ridgeline undulates Resolution No. 06-37 Page 25 _ across the site with a beginning elevation of approximately 1,550 msl, ascending to 1,650 msl and continues northward meeting the primary ridgeline. The existing secondary ridgeline would not change at the southern portion of the project boundary area until it reaches the southern grading limit of the 96 single-family residential lots. At this point, the ridgeline would be modified with a re-created constructed ridge traversing the southern and eastern edge of the development and then through the DWP right-of-way. The portion of this ridgeline that will be impacted by project development is visible, when viewed from the project site, neighboring properties, and major corridors. However, a majority of the modification to this ridgeline would be for the re-creation of the ridgeline which includes the creation of two peaks; one at the southern side of the development and the other on the eastern facing slope near the DWP transmission towers. These peaks would emulate the natural surrounding topography with high and low areas. The development area would be located at a lower elevation behind the manufactured peaks. This ridgeline, while modified, would be recreated to its natural and surrounding topography. In addition it would be created to help screen the development of the 96 single- family residential units. For these reasons, development of the 96 single-family homes will not violate the visual integrity of the upper portion of this ridgeline, and will not alter a natural landmark or a prominent natural feature, but will re- create a visual natural feature viewed by the project site, neighboring properties and major corridors. To minimize grading and emulate the natural contours of the site, project development within the site will employ unique grading techniques, such as landform and contour grading that will re-create the secondary ridgeline helping to create the appearance of the homes being built in a natural environment with a masking of the proposed structures behind the re-created ridgelines. Curvilinear street design and cul-de-sacs that open onto open space areas are used throughout the single-family residential components of the project to soften graded slopes and provide views to the open space. The manufactured slopes incorporate varying slope steepness to create the look of a natural hillside and provide opportunity to plant native vegetation. The required drainage benches and basins will be blended into the natural topography, and will be landscaped to foster a natural appearance. Bio-swales and water quality basins have been designed into the plan as unique features and are an extension of the re-created ridgelines and complete the visual image of a natural ridgeline and dale. The bio-swale diverts water to the water quality basin at the southern entrance of the project, while the functional water quality basin has been designed to appear like a small meadow. Landscaping and grading transitions from developed to natural drainage courses will be consistent and compatible with existing topography, especially in those areas that are highly visible, such as area slopes along the river and between the multi -family development pads. As a result, grading design will be similar to the variations of existing natural slopes. Good examples are the slopes proposed adjacent to the river, as well as the slopes proposed between multi -family Resolution No. 06-37 Page 26 development pads 98 and 97 and the slope between multi -family development pad 99 and the public park. Where retaining walls are needed, curvilinear walls and landscaping screening would be used where appropriate to soften the appearance of the walls SECTION 6. FINDINGS FOR INNOVATIVE APPLICATION. Based on the above findings of fact and recitals and the entire record, including, without limitation, the entire Keystone project EIR, oral and written testimony and other evidence received at the public hearings held on the Keystone project and the Keystone project EIR, reports and other transmittals from City staff to the Planning Commission and City Council , and upon studies and investigations made by the Planning Commission and City Council and on its behalf, the City Council finds, as follows: a. The proposed use is proper in relation to adjacent uses, the development of the community and the various goals and policies of the General Plan. Upon approval of the General Plan Amendment and Zone Change the Keystone project will be consistent with the City's General Plan and Unified Development Code. This consistency is documented in the Keystone EIR and as set forth within this resolution. The project's residential, institutional and open space uses are consistent with the proposed General Plan land use designations and zoning for the project site. Compliance with the Residential Medium zone and the Industrial Commercial zone (0.5 acre parcel), both with a Significant Ecological Area (SEA) Overlay Zone, all of which contain the City's development policies and standards for the subject site, is a condition of project approval. The proposed project is compatible with surrounding development both in terms of land use and the goals and policies of the General Plan. The project is located in the center of the City and is surrounded by existing development, including residential and industrial. To the north is the County approved SunCal residential development, approximately 498 units, which is currently under construction. South of the project site is intense industrial uses, such as Rent -A -Bin. East of the project site is the existing and established Ermine Street residential neighborhood. The recently approved 1,089 residential unit Riverpark project has begun grading just west of the project site. The Keystone project locates single family and townhome residential neighborhoods in areas that are in close proximity to regional roadways and commercial corridors. The 96 single family residential lots are located west of the DWP right-of-way adjacent to similar large residential lots to the west. The remainder of the residential units are located on development pads which have endured disruption from past mining activities and illegal off-road activities. Further, the residential development pads as well as the Junior High School and YMCA sites are plateaus created with the grading and construction of the Golden Valley Road extension. The 0.5 acre site that will remain designated as Industrial Commercial includes no proposed development on and, conditions of approval will restrict use of the parcel. The proposed Junior High School and YMCA sites Resolution No. 06-37 Page 27 as well as the public park site are located along the future extension of Golden Valley Road. The project will implement goals of the General Plan, as it integrates a mix of residential types and institutional land uses with recreation and environmental resources, such as the 6 -acre public park and Santa Clara River corridor. The project's densities and intensities are well below the 979 units that were originally proposed and the density that could potentially be permitted with the requested General Plan Amendment and Zone Change. The proposed General Plan Amendment and Zone Change would allow, with the slope density calculation, a maximum of 730 residential units. However, the applicant is proposing a maximum of 499 residential units, of which 319 are single family units. Residential densities proposed with the Keystone project are consistent with surrounding densities. For example, the Keystone single family residential lots are a minimum of 5,400 square feet in size and are as large as nearly 17,000 square feet, which is larger than the surrounding single family residential lots of the Ermine Street neighborhood, which was developed under the County of Los Angeles with a zoning requirement of a minimum 5,000 square foot lot size. The Keystone single family detached units and townhome units are a transition from the Ermine Street neighborhood smaller lots to the larger lots of the Keystone single family residential area. b. The use or development will not be materially detrimental to the visual character of the neighborhood or community, nor will it endanger the public health, safety or general welfare. The Keystone development will be clustered to minimize disruption to adjacent areas. Site design and contour grading techniques are used to emulate the natural topography on the site's most visible slopes, such as those slopes along the river and between the residential development areas, and to minimize disruption to view corridors and scenic vistas. Clustering of development in previously disturbed areas, will also serve to avoid disruption of view corridors and scenic vistas. The project site design preserves the community's views of the primary ridgeline, as well as, re-creates the secondary ridgelines to help screen the residential units, and thus would not result in the depreciation of ridgeline appearance in the vicinity. The site plan includes development primarily within the large, relatively flat, and disturbed areas of the project site, parts of the proposed development will encroach onto the secondary ridgelines, such as the extension and construction of Golden Valley Road, the Junior High School and YMCA sites which are located on the southern secondary ridgeline. The northern secondary ridgeline is the flat plateau area where the 96 single family lots are proposed. The applicant proposes to re-create both secondary ridgelines to help screen the residential units. �. When viewed on and off-site, these two ridgelines are currently indistinguishable from other neighboring unidentified ridgelines, and do not visually dominate the Santa Clarita Valley landscape. They do not appear prominent in size as Resolution No. 06-37 Page 28 compared to the hillsides or mountain terrain of which they are a part, are not silhouetted against the sky, do not serve as a significant natural backdrop feature, do not separate communities, are not visually dominant in the view from existing development or major corridors, and are not areas of significant ecological, historical or cultural importance like those that connect park or trail systems. Furthermore, both secondary ridgelines have been degraded by past mining activities and illegal off-road activity. The first of two City classified secondary ridgelines on site is located east of the DWP right-of-way and referred to as the eastern secondary ridgeline for purposes of this project. The ridgeline currently traverses the site in a southwesterly and northeasterly axis ending just north of the existing Ermine Street termination. This ridgeline extends approximately 3,300 feet across the site with a beginning elevation of approximately 1,430 feet above the mean sea level (ms]) and ascends to approximately 1,600 feet ms] at the Ermine Street location. This secondary ridgeline exhibits scars from past farming and mining activity, which have left large stair -step terraces on the south -facing slope. Additional scaring has occurred due to off-road vehicle activity. Project implementation would require cut and fill grading operations to prepare the project site for the proposed development. The portion of this ridgeline that will be impacted by project development is not visually prominent or dominant, when viewed either from the project site, from neighboring properties, or from major corridors. The extension of Golden Valley Road, which will help to alleviate congestion on Whites Canyon Road and Bouquet Canyon Road, will also encroach on this ridgeline. In addition, landform grading techniques would be implemented separating the development pads creating a re -constructed ridgeline just west and north of the existing ridge. Therefore, this ridgeline has already been degraded, any minimal visual impact to the lower portion of the ridgeline caused by the project will be confined to the immediate local neighborhood and project residents, and the ridgeline will be re -constructed to follow a similar southwesterly to northeasterly axis like the existing ridgeline. The second City -classified secondary ridgeline extends from the primary ridgeline on the north and continues generally in a southerly direction along the DWP right- of-way. The ridgeline extends approximately 2,200 feet across the 45 -acre portion of the site. As typical of the area's topography, the ridgeline undulates across the site with a beginning elevation of approximately 1,550 msl, ascending to 1,650 msl and continues northward meeting the primary ridgeline. The existing secondary ridgeline would not change at the southern portion of the project boundary area until it reaches the southern grading limit of the 96 single-family residential lots. At this point, the ridgeline would be modified with a re-created constructed ridge traversing the southern and eastern edge of the development and then through the DWP right-of-way. Resolution No. 06-37 Page 29 The portion of this ridgeline that will be impacted by project development is visible, when viewed from the project site, neighboring properties, and major corridors. However, a majority of the modification to this ridgeline would be for the re-creation of the ridgeline which includes the creation of two peaks; one at the southern side of the development and the other on the eastern facing slope near the DWP transmission towers. These peaks would emulate the natural surrounding topography with high and low areas. The development area would be located at a lower elevation behind the manufactured peaks. This ridgeline, while modified, would be recreated to its natural and surrounding topography. In addition it would be created to help screen the development of the 96 single- family residential units. For these reasons, development of the 96 single-family homes will not violate the visual integrity of the upper portion of this ridgeline, and will not alter a natural landmark or a prominent natural feature, but will re- create a visual natural feature viewed by the project site, neighboring properties and major corridors. To minimize grading and emulate the natural contours of the site, project development within the site will employ unique grading techniques, such as landform and contour grading that will re-create the secondary ridgeline helping to create the appearance of the homes being built in a natural environment with a masking of the proposed structures behind the re-created ridgelines. Curvilinear street design and cul-de-sacs that open onto open space areas are used throughout the single-family residential components of the project to soften graded slopes and provide views to the open space. The manufactured slopes incorporate varying slope steepness to create the look of a natural hillside and provide opportunity to plant native vegetation. The required drainage benches and basins will be blended into the natural topography, and will be landscaped to foster a natural appearance. Bio-swales and water quality basins have been designed into the plan as unique features and are an extension of the re-created ridgelines and complete the visual image of a natural ridgeline and dale. The bio-swale diverts water to the water quality basin at the southern entrance of the project, while the functional water quality basin has been designed to appear like a small meadow. Landscaping and grading transitions from developed to natural drainage courses will be consistent and compatible with existing topography, especially in those areas that are highly visible, such as area slopes along the river and between the multi -family development pads. As a result, grading design will be similar to the variations of existing natural slopes. Good examples are the slopes proposed adjacent to the river, as well as the slopes proposed between multi -family development pads 98 and 97 and the slope between multi -family development pad 99 and the public park. Where retaining walls are needed, curvilinear walls and landscaping screening would be used where appropriate to soften the appearance of the walls. The proposed uses are compatible with existing uses in the area and with the goals and policies of the General Plan, in that they implement, integration of a mix of Resolution No. 06-37 Page 30 residential use with institutional and open space uses, while preserving environmental resources. The Keystone project's potential impacts on the public health, safety and general welfare and on properties or improvements in the vicinity were analyzed in the project's EIR as certified. Those impacts were either less than significant or were significant but reduced to a level of less than significant through mitigation. The project site will not contain uses that will be engaged in hazardous activities or that will be permitted to emit substantial amounts of hazardous contaminants or pollutants into the air or water. The EIR did not find that the proposed location, size, design, and operating characteristics of the project's proposed uses and the conditions under which they would be operated or maintained would be materially injurious to properties or improvements in the vicinity. C. The appearance of the Keystone development will not be different than the appearance of adjoining ridgeline areas so as to cause depreciation of the ridgeline appearance in the vicinity. The Keystone development will be clustered to minimize disruption to adjacent areas. Site design and contour grading techniques are used to emulate the natural topography on the site's most visible slopes, such as those slopes along the river and between the residential development areas, and to minimize disruption to view corridors and scenic vistas. Clustering of development in previously disturbed areas, will also serve to avoid disruption of view corridors and scenic vistas. Furthermore, please see the discussion for finding b. above for additional support of the project's consistency with this finding. d. The Keystone development will not impede the normal and orderly development and improvement of surrounding property, nor encourage inappropriate encroachments to the ridgeline area. The Keystone site is generally surrounded on all sides by existing development, including residential and industrial. To the north is the County approved SunCal residential development, approximately 498 units, which is currently under construction. South of the project site is intense industrial uses, such as Rent -A - Bin. East of the project site is the existing and established Emetine Street residential neighborhood. The recently approved 1,089 residential unit Riverpark project has begun grading just west of the project site. In addition, see the findings made with respect to criterion a, above. In summary, the Keystone single family residential lots are a minimum of 5,400 square feet in size and are as large as nearly 17,000 square feet, which is larger than the surrounding single family residential lots of the Ermine Street neighborhood, which was developed under the County of Los Angeles with a zoning requirement of a minimum 5,000 square foot lot size. The Keystone single family detached units and townhome units are a transition from the Ermine Street neighborhood smaller lots to the larger lots of the Keystone single family residential area. Resolution No. 06-37 Page 31 Furthermore, the applicant's Keystone Innovative Application (dated May 2004) incorporated herein by reference illustrates through visual simulations, cross sections and additional exhibits the project's consistency with the City's Hillside Ordinance. More specifically, Exhibits 19 through 26 of Keystone Innovative Application illustrate that those portions of the ridgelines being impacted by the Keystone project are not visually dominant or prominent when viewed from either the project site, from neighboring properties, or from major corridors and will be re-created to help screen the residential units. See the findings made with respect to criterion b, above, which also apply here. e. It has been demonstrated that Keystone development will not violate the visual integrity of the significant ridgeline through precise illustration and depiction as required in subsection D above, "Ridgeline Preservation." The potential visual impacts of the Keystone development have been analyzed in the Keystone Innovative Application (May 2004) incorporated herein by reference and Section V.13-1, Aesthetics, of the Keystone EIR, which contains the required visual simulations. The Keystone development will be clustered to minimize disruption to adjacent areas. Site design and contour grading techniques are used to emulate the natural topography on the site's most visible slopes, such as those slopes along the river and between the residential development areas, and to minimize disruption to view corridors and scenic vistas. Clustering of development in previously disturbed areas, will also serve to avoid disruption of view corridors and scenic vistas. The project site design preserves the community's views of the primary ridgeline, as well as, re-creates the secondary ridgelines to help screen the residential units, and thus would not result in the depreciation of ridgeline appearance in the vicinity. The site plan includes development primarily within the large, relatively flat, and disturbed areas of the project site, parts of the proposed development will encroach onto the secondary ridgelines, such as the extension and construction of Golden Valley Road, the Junior High School and YMCA sites which are located on the southern secondary ridgeline. The northern secondary ridgeline is the flat plateau area where the 96 single family lots are proposed. The applicant proposes to re-create both secondary ridgelines to help screen the residential units. When viewed on and off-site, these two ridgelines are currently indistinguishable from other neighboring unidentified ridgelines, and do not visually dominate the Santa Clarita Valley landscape. They do not appear prominent in size as compared to the hillsides or mountain terrain of which they are a part, are not silhouetted against the sky, do not serve as a significant natural backdrop feature, do not separate communities, are not visually dominant in the view from existing -- development or major corridors, and are not areas of significant ecological, historical or cultural importance like those that connect park or trail systems. Resolution No. 06-37 Page 32 Furthermore, both secondary ridgelines have been degraded by past mining activities and illegal off-road activity. The first of two City classified secondary ridgelines on site is located east of the DWP right-of-way and referred to as the eastern secondary ridgeline for purposes of this project. The ridgeline currently traverses the site in a southwesterly and northeasterly axis ending just north of the existing Ermine Street termination. This ridgeline extends approximately 3,300 feet across the site with a beginning elevation of approximately 1,430 feet above the mean sea level (msl) and ascends to approximately 1,600 feet msl at the Ermine Street location. This secondary ridgeline exhibits scars from past farming and mining activity, which have left large stair -step terraces on the south -facing slope. Additional scaring has occurred due to off-road vehicle activity. Project implementation would require cut and fill grading operations to prepare the project site for the proposed development. The portion of this ridgeline that will be impacted by project development is not visually prominent or dominant, when viewed either from the project site, from neighboring properties, or from major corridors. The extension of Golden Valley Road, which will help to alleviate congestion on Whites Canyon Road and Bouquet Canyon Road, will also encroach on this ridgeline. In addition, landform grading techniques would be implemented separating the development pads creating a re -constructed ridgeline just west and north of the existing ridge. Therefore, this ridgeline has already been degraded, any minimal visual impact to the lower portion of the ridgeline caused by the project will be confined to the immediate local neighborhood and project residents, and the ridgeline will be re -constructed to follow a similar southwesterly to northeasterly axis like the existing ridgeline. The second City -classified secondary ridgeline extends from the primary ridgeline on the north and continues generally in a southerly direction along the DWP right- of-way. The ridgeline extends approximately 2,200 feet across the 45 -acre portion of the site. As typical of the area's topography, the ridgeline undulates across the site with a beginning elevation of approximately 1,550 msl, ascending to 1,650 msl and continues northward meeting the primary ridgeline. The existing secondary ridgeline would not change at the southern portion of the project boundary area until it reaches the southern grading limit of the 96 single-family residential lots. At this point, the ridgeline would be modified with a re-created constructed ridge traversing the southern and eastern edge of the development and then through the DWP right-of-way. The portion of this ridgeline that will be impacted by project development is visible, when viewed from the project site, neighboring properties, and major corridors. However, a majority of the modification to this ridgeline would be for the re-creation of the ridgeline which includes the creation of two peaks; one at the southern side of the development and the other on the eastern facing slope near the DWP transmission towers. These peaks would emulate the natural Resolution No. 06-37 Page 33 ,._ surrounding topography with high and low areas. The development area would be located at a lower elevation behind the manufactured peaks. This ridgeline, while modified, would be recreated to its natural and surrounding topography. In addition it would be created to help screen the development of the 96 single- family residential units. For these reasons, development of the 96 single-family homes will not violate the visual integrity of the upper portion of this ridgeline, and will not alter a natural landmark or a prominent natural feature, but will re- create a visual natural feature viewed by the project site, neighboring properties and major corridors. To minimize grading and emulate the natural contours of the site, project development within the site will employ unique grading techniques, such as landform and contour grading that will re-create the secondary ridgeline helping to create the appearance of the homes being built in a natural environment with a masking of the proposed structures behind the re-created ridgelines. Curvilinear street design and cul-de-sacs that open onto open space areas are used throughout the single-family residential components of the project to soften graded slopes and provide views to the open space. The manufactured slopes incorporate varying slope steepness to create the look of a natural hillside and provide opportunity to plant native vegetation. The required drainage benches and basins will be blended into the natural topography, and will be landscaped to foster a natural appearance. Bio-swales and water quality basins have been designed into the plan as unique features and are an extension of the re-created ridgelines and complete the visual image of a natural ridgeline and dale. The bio-swale diverts water to the water quality basin at the southern entrance of the project, while the functional water quality basin has been designed to appear like a small meadow. Landscaping and grading transitions from developed to natural drainage courses will be consistent and compatible with existing topography, especially in those areas that are highly visible, such as area slopes along the river and between the multi -family development pads. As a result, grading design will be similar to the variations of existing natural slopes. Good examples are the slopes proposed adjacent to the river, as well as the slopes proposed between multi -family development pads 98 and 97 and the slope between multi -family development pad 99 and the public park. Where retaining walls are needed, curvilinear walls and landscaping screening would be used where appropriate to soften the appearance of the walls. f. Keystone development will minimize the effects of grading to insure that the natural character of ridgelines is preserved. The conditions of project approval require landform grading. Landform grading will be utilized to minimize the effects of grading. In addition, -- the project design concentrates development on the relatively flat and previously disturbed portions of the site. Approximately 80 acres of the project site, is comprised of land with slope densities from 0% to 25%. The remaining 165 acres Resolution No. 06-37 Page 34 of the project site range in slope density from 25% to 76%. Approximately 63% (156 acres) of the site will remain as natural, undeveloped open space, and graded open space lots, including both the 6 -acre public park and the 17 -acre river property. g. The proposed use or development maintains the appearance of natural ridgelines with uses or development consistent with density requirements established in Section 17.80.035. The project's densities and intensities are well below the 979 units that were originally proposed and the density that could potentially be permitted with the requested General Plan Amendment and Zone Change as it pertains to Section 17.80.035. The proposed General Plan Amendment and Zone Change would allow, with the slope density calculation a maximum of 730 residential units. However, the applicant is proposing a maximum of 499 residential units, of which 319 are single family units. Residential densities proposed with the Keystone project are consistent with surrounding densities. For example, the Keystone single family residential lots are a minimum of 5,400 square feet in size and are as large as nearly 17,000 square feet, which is larger than the surrounding single family residential lots of the Ermine Street neighborhood, which was developed under the County of Los Angeles with a zoning requirement of a minimum 5,000 square foot lot size. The Keystone single family detached units and townhome units are a transition from the Ermine Street neighborhood smaller lots to the larger lots of the Keystone single family residential area. To minimize grading and emulate the natural contours of the site, project development within the site will employ unique grading techniques, such as landform and contour grading that will re-create the secondary ridgeline helping to create the appearance of the homes being built in a natural environment with a masking of the proposed structures behind the re-created ridgelines. Please see discussion with respect to findings a, e, and f , above, which also support this finding. h. The proposed use or development utilizes or creates unique grading techniques, imaginative project site design and spacing of development that significantly exceeds the minimum standards identified in the City of Santa Clarita Ridgeline Preservation and Hillside Development Guidelines. Please see the findings made with respect to findings a through f, above. In summary, for purposes of minimizing grading alterations on the project site, Curvilinear street design and cul-de-sacs that open onto open space areas are used throughout the single-family residential components of the project to soften graded slopes and provide views to the open space. The manufactured slopes incorporate varying slope steepness to create the look of a natural hillside and provide opportunity to plant native vegetation. The required drainage benches Resolution No. 06-37 Page 35 and basins will be blended into the natural topography, and will be landscaped to foster a natural appearance. Bio-swales and water quality basins have been designed into the plan as unique features and are an extension of the re-created ridgelines and complete the visual image of a natural ridgeline and dale. The bio- swale diverts water to the water quality basin at the southern entrance of the project, while the functional water quality basin has been designed to appear like a small meadow. Landscaping and grading transitions from developed to natural drainage courses will be consistent and compatible with existing topography, especially in those areas that are highly visible, such as area slopes along the river and between the multi -family development pads. Project development will be concentrated within development pads that have experienced previous disruption from past mining activities and illegal off-road vehicle use. One third of the Keystone project site has slope areas of less than 25% grade, which helps to reduce grading alterations and development impacts. Building setbacks, building heights and compatible structures and building forms will be designed to blend with the surrounding terrain. Residential densities proposed with the Keystone project are consistent with surrounding densities. For example, the Keystone single family residential lots are a minimum of 5,400 square feet in size and are as large as nearly 17,000 square feet, which is larger than the surrounding single family residential lots of the Ermine Street neighborhood, which was developed under the County of Los Angeles with a zoning requirement of a minimum 5,000 square foot lot size. The Keystone single family detached units and townhome units are a transition from the Ermine Street neighborhood smaller lots to the larger lots of the Keystone single family residential area. Imaginative site design is used in order to preserve prominent features on the site, such as the Santa Clara River and the primary ridgeline. Detailed examples of the project's imaginative site design are included in the Keystone Innovative application (May 2004). In summary, these examples include the preservation of open space including the Santa Clara River, the provision of a 6 -acre public park, connections to and the extension of the Santa Clara River trail, the inclusion of a Junior High School and YMCA site, and the concentrating of project development on development pads. In addition, development within the Planning Areas has been designed to preserve trees in place. Of the 8 oak trees on site, only 3 will be removed, 2 of them are located off-site in the path of the 1,890 foot extension of Golden Valley Road west of the project site, and 1 is located on site, on Lot 115. i. The proposed use or development should be designed to mimic the existing topography to the greatest extent possible. Please see discussion with respect to findings a and f, above. Landform grading will be used to mimic the existing topography to the greatest extend possible. Re- creation of the secondary ridgelines will help to screen the residential units. Resolution No. 06-37 Page 36 Revegetation and landscaping will be utilized to blend the project manufactured slopes and benches into the natural topography j. The Keystone development demonstrates creative and imaginative site design resulting in a project that will compliment the community character and provide a direct benefit to current and future community residents of not only the proposed use or development, but the residents of the City of Santa Clarita as a whole Please see the discussion with respect to finding f, above. In summary and in addition: The inclusion of several "knoll" parks that will be owned and maintained by the Homeowners Association, will have pedestrian accessibility to the public through the network of paseos and trails that run through the project site. In addition, the applicant is also proposing a trail and trail head which connects from the Ermine Street neighborhood to the Class 1 bike trail along Golden Valley Road, providing pedestrian access from Sky Blue Mesa Elementary School to the proposed Junior High School and YMCA sites. These are additional amenities to the project and are above and beyond the trails that are required to be provided for the project site, such as the multi -use trail along the south of the project site and the Class 1 bike trail along Golden Valley Road. The Junior High School site and YMCA site would be deeded to the Hart Union School District and YMCA, respectively. In addition, the applicant is offering a contribution of two million dollars to the Hart Union School District for the Performing Arts program. The contribution is memorialized in the Mitigation Agreement between the applicant and the School District. The project includes a 1.6 acre private recreation facility along proposed "I" Street. This facility will provide private recreational amenities such as a pool and recreation room for the residents of both the Single-family and multi -family residential areas. The applicant has agreed to a monetary contribution of $200,000 to the completion of the multi -use trail east of the project site. The multi -use trail that runs along the southern portion of the project site is identified as a future trail on the City's Regional Trails Map. The multi -use trail along this portion of the City, stretches from Central Park and continues through the approved Riverpark project. The Keystone project is providing the trail through the project site with an extension west to the Riverpark project. The trail is planned to continue east of the Keystone project site to Discovery Park. In addition, the comprehensive trail system providing access across the project site, extending west to the Riverpark project and in the future to the City's Central Park and Discovery Park will provide an additional asset to the City and the community as a whole. The total length of this trail extension through the site is Resolution No. 06-37 Page 37 1/2 mile. A typical trail section would include a 35- foot easement that contains a 12 -foot equestrian trail, four -foot pedestrian trail, and 12 -foot Class I bike lane with a minimum of 7 feet of landscaping. The Keystone project provides the following specific benefits related to the innovative application: L Preservation and dedication of approximately 17.4 acres of open space, in the Santa Clara River; ii. Dedication and improvement to the City of Santa Clarita of a 6 acre public park; iii. Dedication of a 21 -acre finished lot to the Hart Union School District for the future construction of a Junior High school; iv. Dedication of a 4 -acre finished and graded lot to the YMCA for construction of a future approximately 30,740 square foot facility; V. Extension of a 1/2 mile link of the Santa Clara River trail along the southern portion of the site; vi. Extension of Class 1 Bike Trail along Golden Valley Road, connecting to the Santa Clara River trail; vii. Contribution of $200,000 to the City for the construction of the Santa Clara River that runs through the Keystone site and will extend east to Discovery Park. Each of the above described benefits results in a project that will compliment the community character and provide a direct benefit to current and future residents of not only the project but the residents of Santa Clarita. In summary, the extension of regional trail improvements and construction of the public park will further enhance the City's recreational amenities. The preservation and dedication of the Santa Clara River will be of substantial benefit to the residents of Santa Clarita Valley. The dedication of land for the construction of a much needed Junior High School and YMCA is a great benefit to the Santa Clarita Valley. Finally, the project's contribution of the extension of Golden Valley Road, will improve the level of service along significant portions of Soledad Canyon Road, Whites Canyon Road and Bouquet Canyon Road. k. The Keystone development will not alter natural landmarks and prominent natural features which enhance the character of ridgelines in their natural environment. Please see the discussion with respect to findings a and f, above, which also apply here. In summary: Resolution No. 06-37 Page 38 Keystone development will preserve the primary ridgeline located on-site and will re-create the two secondary ridgelines to their natural form, this will allow Keystone to have the ridgelines as a backdrop. The western secondary ridgeline is currently flat in some areas from past mining activities and illegal off-road vehicle uses. With this project, the applicant proposes to re-create that ridgeline to its natural state to help in screening the 96 single family lots from view. The eastern secondary ridgeline also experienced disruption from past mining activities and illegal off-road vehicle uses. This ridgeline is the location of the extension of Golden Valley Road through the project site. The applicant proposes to re-create this ridgeline as well to bring back the natural characteristics of the site. 1. The visual impacts of the Keystone development will be confined to the immediate local neighborhood and proposed new use or development area. Please see findings with respect to findings a through k, above, which also apply here. In summary, Project development will be concentrated within development pads that have experience previously disruption from past mining activities and illegal off-road vehicle use. One third of the Keystone project site has slope areas of less than 25% grade, which helps to reduce grading alterations and development impacts. Contour grading and naturalized landscaping on external slopes will be utilized to minimize visual impacts to the local neighborhood and surrounding regional roadways M. The proposed use or development will be shielded from general public view by a perimeter ridgeline or perimeter ridgeline system. Please see findings in support of findings a through k, above, which also apply here. In summary, Project development will be concentrated within development pads that have experience previously disruption from past mining activities and illegal off-road vehicle use. One third of the Keystone project site has slope areas of less than 25% grade, which helps to reduce grading alterations and development impacts. Contour grading and naturalized landscaping on external slopes will be utilized to minimize visual impacts to the local neighborhood and surrounding regional roadways. SECTION 7. FINDINGS FOR OAK TREE PERMIT 03-066. Based on the above findings of fact and recitals and the entire record, including, without limitation, the entire Keystone project EIR, oral and written testimony and other evidence received at the public hearings held on the Keystone project and the Keystone project EIR, reports and other transmittals from City staff to the Planning Commission and City Council, and upon studies and investigations made by the Planning Commission and City Council and on its behalf, the City Council finds, as follows: a. It is necessary to remove and encroach into the protected zone of oak trees to enable reasonable use of the subject property that is otherwise prevented by the presence of the trees and no reasonable alternative can be accommodated due to the unique physical development constraints of the property. Resolution No. 06-37 Page 39 The Oak Tree Preservation Ordinance is intended to prevent uncontrolled and indiscriminate destruction of oak trees. Development on the 246 -acre Keystone site has been designed to avoid or minimize removals of and encroachments to the 8 protected oak trees on-site. Of the eight oak trees, five oaks are located within the project site boundaries, area east of the DWP right-of-way. One of the oak trees within the project site boundaries will be removed for grading of a slope on Lot 115. As set forth within this resolution, the development is proposed a total of 499 dwelling units, well below the 979 dwelling units originally proposed. In addition, the proposed project will be surrounded by similar residential developments. Also, two of the trees proposed for removal are located off-site west of the proposed development in the path of the 1,890 foot extension of GVR west to connect with the Cross Valley Connector, which is the City's highest priority roadway. The other oak tree proposed for removal is located on site, on Lot 115 adjacent to the proposed Junior High School site. Alternatives to avoid these trees would require a rerouting of Golden Valley Road, which has fixed points at the western and northern boundaries, and would also require altering the location of the Junior High School site. Therefore, it is necessary to remove the three oak trees to enable the reasonable use of the subject property that is otherwise prevented by the presence of the trees and no reasonable alternative can be accommodated due to the unique physical development constraints of the property. b. The approval of the request will not be contrary to or in conflict with the general purpose and intent of the Oak Tree Preservation Ordinance. The Oak Tree Preservation Ordinance is intended to prevent uncontrolled and indiscriminate destruction of oak trees. Development on the 246 acre Keystone site has been designed to avoid or minimize removals of 8 protected oak trees on- site. Please see discussion related to finding a. above. SECTION 8. WATER SUPPLY ASSESSMENT. Pursuant to California Water Code Section 10911, the City Council hereby determines that, based on the above findings of fact and recitals and the entire record, including, without limitation, the entire Keystone project EIR, oral and written testimony and other evidence received at the public bearings held on the Keystone project and the Keystone project EIR, reports and other transmittals from City staff to the Planning Commission and City Council, and upon studies and investigations made by the Planning Commission and City Council and on its behalf, including, without limitation, the water supply assessment prepared for the project and attachments thereto, projected water supplies will be sufficient to satisfy the demands of the Keystone project, in addition to existing and planned future uses. SECTION 9. The City Council hereby approves the following Entitlements requested under Master Case 03-358 with the attached conditions of approval (Attachment A): approval of Vesting Tentative Tract Map 60258 (to subdivide the Keystone project site into 96 single-family lots, 3 multi -family lots and lots for recreation/parks, junior high school, YMCA, utilities, roadways, manufactured slopes and open space; General Plan Resolution No. 06-37 Page 40 Amendment 03-002 (to change the land use designation of the Keystone project site); Zone Change 03-002 (to change the zoning for portions of the Keystone project site); Conditional Use Permit 03-016 (to allow for vehicular gating of the residential areas, approve the YMCA use, and approve an innovative application under a hillside permit; Hillside Review 03-006, including an Innovative Application (to allow development on slopes over 10 percent, development on ridgelines classified as secondary); and Oak Tree Permit 03-066 (for removal of 3 oak trees.) SECTION 10. This resolution will take effect upon the adjournment of the City Council's April 25th City Council meeting. The change to the City's General Plan contemplated herein will take effect upon adjournment of the April 25, 2006 City Council meeting simultaneously with any other changes to the General Plan approved by the City Council at that same meeting so that for purposes of Government Code section 65358, all such changes shall constitute one amendment to the General Plan. SECTION 11. The City Clerk shall certify to the adoption of this Resolution and certify this record to be a full, complete, and correct copy of the action taken. PASSED, APPROVED AND ADOPTED this 25th day of April, 2006. MAYOR 1 114-W JR XaA/� CITY CLEPK Resolution No. 06-37 Page 41 STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) ss. CITY OF SANTA CLARITA ) I, Sharon L. Dawson, CMC, City Clerk of the City of Santa Clarita, do hereby certify that the foregoing Resolution was duly adopted by the City Council of the City of Santa Clarita at a regular meeting thereof, held on the 25th day of April, 2006, by the following vote: AYES: COUNCILMEMBERS: Smyth, McLean, Ferry, Weste NOES: COUNCILMEMBERS: None ABSENT: COUNCH-MEMBERS: None DISQUALIFIED: COUNCILMEMBERS: Kellar CITY CLERK STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES CITY OF SANTA CLARITA ) CERTIFICATION OF CITY COUNCIL RESOLUTION I, Sharon L. Dawson, City Clerk of the City of Santa Clarita, do hereby certify that this is a true and correct copy of the original Resolution No. 06-37, adopted by the City Council of the City of Santa Clarita, California on April 25, 2006, which is now on file in my office. Witness my hand and seal of the City of Santa Clarita, California, this _ day of 20_. Sharon L. Dawson, CMC City Clerk By Susan Coffman Deputy City Clerk ATTACHMENT A MASTER CASE NO. 03-358, VESTING TENTATIVE TRACT MAP 60258, GENERAL PLAN AMENDMENT 03-002, ZONE CHANGE 03-002, OAK TREE PERMIT 03-066, CONDITIONAL USE PERMIT 03-016, AND HILLSIDE REVIEW 03-006 FINAL CONDITIONS OF APPROVAL General GCI. The approval of Tentative Tract Map 60258 and the associated entitlements shall expire two years from the date of conditional approval unless modified with an approved development agreement. GC2. The subdivider may file for an extension of the conditionally approved Map prior to the date of expiration for a period of time not to exceed one year. If such an extension is requested, it must be filed no later than 60 days prior to expiration. Subsequent extensions may be requested and could be granted as provided by law or as provided for in an approved development agreement. GC3. The applicant shall be responsible for notifying the Director of Community Development in writing of any change in ownership or designation of a new engineer within 30 days of said change. GC4. Unless otherwise apparent from the context, the term "applicant" shall include the applicant and any other persons, corporation, or other entity making use of this grant. The applicant shall defend, indemnify, and hold harmless the City of Santa Clarita, its agents, officers, and employees from any claim, action, or proceeding against the City or its agents, officers, or employees to attack, set aside, void, or annul the approval of this Subdivision by the City, which action is provided for in Government Code Section 66499.37. In the event the City becomes aware of any such claim, action, or proceeding, the City shall promptly notify the applicant, or if the City fails to cooperate fully in the defense, the applicant shall not thereafter be responsible to defend, indemnify, or hold harmless the City. Nothing contained in this Condition prohibits the City from participating in the defense of any claim, action, or proceeding, if both the following occur: 1) The City bears its own attorney's fees and costs; and, 2) the City defends the action in good faith. The applicant shall not be required to pay or perform any settlement unless the settlement is approved by the applicant. GCS. Details shown on Tentative Tract Map 60258 are not necessarily approved. Any details which are inconsistent with the requirements of ordinances, general conditions of approval, or City policies and not modified by this permit must be specifically approved. GC6. In lieu of establishing the final specific locations of structures on each lot at this time, the owner, at the time of issuance of building permits, agrees to develop the property in Master Case 03-358 April 25, 2006 Page 2 of 33 conformance with the City Code, approved variances, and other appropriate ordinances, including but not limited to the Building Code, Plumbing Code, Grading Ordinance, Highway Permit Ordinance, Mechanical Code, Unified Development Code, Oak Tree Ordinance, Undergrounding of Utilities Ordinance, Sanitary Sewer and Industrial Waste Ordinance, Electrical Code, and Fire Code. Improvements and other requirements may be imposed pursuant to such codes and ordinances in accordance with vested rights as provided for in the Government Code. GC7. A grading permit shall be required for any and all grading to occur for the purpose of this project. GCB. This grant shall not be effective for any purpose until the permittee and the owner of the property involved (if other than the permittee) have filed with the Director of Community Development, their affidavit stating that they are aware of, and agree to accept, all of the conditions of this grant. GC9. The Sanitation Districts are empowered by the California Health and Safety Code to charge a fee for the privilege of connecting to the Sanitation Districts' Sewerage System or increasing the existing strength and/or quantity of wastewater attributable to a particular parcel or operation already connected. A connection fee is required to construct an incremental expansion of the Sewerage System to accommodate the proposed project that will mitigate the impact of this project on the present Sewerage System. Payment of a connection fee will also be required before a permit to connect to the sewer is issued. GC10. Individual developments associated with the proposed project may require a Districts' permit for Industrial Wastewater Discharge. Project developers should contact the Sanitation Districts' Industrial Waste Section in order to reach a determination on this matter. If this permit is necessary, project developers shall forward a copy of final plans for proposed development(s) to the Districts for review and approval prior to the issuance of building permits. GC11. The applicant shall accept the Storm Drainage Fee established by the City of Santa Clarita required by Government Code Section 66018 and City Ordinance No. 94-7, establishing storm drainage activity of the City as a utility enterprise. GC12. The applicant shall provide a disclosure statement on the title report of each residential property informing all future homeowners of all known geological hazards. Planning Division PLl. All Final Maps shall be developed in substantial conformance with Vesting Tentative Tract Map 60258 as approved by the City Council. Master Case 03-358 April 25, 2006 Page 3 of 33 PL2. It is hereby declared and made a condition of this permit that if any condition hereof is violated, or if any law, statute, or ordinance is violated, the City may commence proceedings to revoke this approval. PL3. All requirements of the Unified Development Code and of the specific zoning of the subject property shall be complied with unless set forth in the permit and/or shown on the tentative map. PL4. All mitigation measures identified in the certified environmental impact report and Mitigation Monitoring and Reporting Program (MMRP) for the project shall be complied with to the satisfaction of Director of Community Development. Prior to obtaining a grading permit the City shall hire, at the applicant's cost, a mitigation monitoring consultant to ensure all mitigation measures are completed in accordance with the project approval. PIS. The applicant shall install a single water guzzler in the open space area for wildlife enhancement to the satisfaction of the Director of Community Development. PL6. No signage is approved at this time. The applicant shall obtain Planning Division approval for any signage proposed for the project prior to its placement on the buildings/property. PL7. Street sections shall be consistent with the approved vesting tentative tract map. PL8. Disclosure information identifying transition lot data shall be recorded within the title report(s) for affected properties. A property whose grading plan identifies a cut and fill daylight line that travels through the building pad area, and properties where a transition lot has been over -excavated to relocate a cut and fill daylight line, are both considered "affected properties." The data to be recorded shall consist of text identifying the parcel as a transition lot, and a map identifying the location of the existing cut and fill daylight line, or the prior location and relocated cut and fill daylight line, whichever is appropriate. PL9. The location of the fire flow check valve, Edison transformers and other types of objects that can be seen from the street shall be indicated on the final site plan. Planning approval is required for the location and screening of these objects. PL10. All commonly owned areas shall be recorded as such and shall be maintained by the project's Homeowner Association unless maintained by LMD. PL11. Prior to the issuance of the first Certificate of Occupancy, a homeowner's association, or property owners association (where applicable) shall be formed to have responsibility and Master Case 03-358 April 25, 2006 Page 4 of 33 authority of all maintenance, including but not limited to landscaping, slopes, irrigation, drainage devices and trees in common areas. PL12. Approval to gate the residential development areas is granted. Prior to the issuance of a fine grading permit the applicant shall submit a detailed gating plan illustrating consistency with the City's Unified Development Code standards for gating. PL13. Retaining walls proposed along Golden Valley Road shall comply with the City's UDC requirements for retaining walls, Section 17.15.020(C) and shall be designed and made of individual interlocking block components that allow for planting of every block. PL14. Street improvements for the Ermine Street extension west shall include an 8'-10' sidewalk that will connect to the Class 1 Bike trail along Golden Valley Road. Landscape PL14. The applicant shall provide enhanced landscaping along Golden Valley Road and "I" Street to further buffer the residential units from the roadways. PL15. Prior to issuance of building permit(s), the applicant shall provide final landscape, lighting and irrigation plans for Planning Department/Landscape Review and approval. The plan must be prepared by a landscape architect registered in the state of California who is familiar with the plant palette suitable for Santa Clarita (Sunset Western Garden Book Zone 18, minimum winter night temperatures typically 20 — 30 degrees Fahrenheit; maximum summer high temperatures typically 105 — 110 degrees Fahrenheit. PL16. Landscape plans must conform to all current Municipal Code/Unified Development Code requirements for landscaping. Applicable code sections include but are not limited to: (a) § 17.15.020 (A) (1), (3) (property development standards for single-family residential zones); (b) § 17.15.020 (J)(9) (property development standards for multifamily residential zones); (c) § 17.18.070 (E) (parking standards); (d) § 17.28 (drainage and terracing/erosion control); (e) § 17.80.040 (K) (ridgeline preservation and hillside development/landscape design) and (f) § 13.76 (parkway trees). PL17. Trail systems and open space connectors in the development should complement Santa Clarita Beautification Master Plan guidelines. Please see attached. Master Case 03-358 April 25, 2006 Page 5 of 33 PL18. Landscape plans shall contain all elements required by the Development Review checklist for preliminary landscape plans, shall be materially similar to those approved by the City Council, and shall conform to the following: a. Trees positioned along the property's public street frontages shall be a minimum 24," box size, and shall include a proportionate number of 36," 48," and 60" box -size specimens. b. The plant palette shall not include any plants listed as invasive exotic pest plants by the California Invasive Plant Council (lists available at htt :/p /groui)s.ucanr.or /g/cggpc/). c. The plant palette shall emphasize regionally native plants on all slope plantings and where plantings abut retained native vegetation. Examples include, but are not limited to: i. Trees; Quercus agrifolia/Live Oak, Quercus lobata/Valley Oak, Quecus chrisolipus/ Canyon Oak, Juglans califomica/ Black Walnut, Platanus racemosa/ California Sycamore, Umbellaria californica/ California Bay. ii. Shrubs; Heteromeles arbutifolia/ Toyon, Ceanothus spp./California Lilac, Eriogonum spp./ Buckweat, Rhus ovata/ Lemonade Berry, Arctostaphylos spp./ Manzanita, Salvia spp./ Sage iii. Perenials & grasses; Achillea millefolium / Yarrow, Artemisia calfornica/ Sagebrush, Mimulus spp./ monkey flower, Muhlenbergia rigens/ Deergrass, Penstemon spp., Zauschneria/ California Fuchsia. d. Landscape plans shall show at least fifty (50) trees per gross acre within the portion of the project to be developed in multifamily residential units. Of these, at least twenty percent (20%) shall be twenty-four (24) inch box size or larger, seventy percent (70%) shall be at least fifteen (15) gallon size and ten percent (10%) shall be at least five (5) gallon size. e. Landscape plans shall show at least one (1) 24" box tree per four (4) parking stalls in any parking lots/areas, and 36" box trees in planters at the ends of parking aisles. The plans shall show tree species selection, distribution and spacing to provide 50% canopy coverage of all parking lots/areas within 5 years of planting (Municipal Code § 17.18.070 (E)(10)). f. Trees proposed for parking areas, including guest parking, must be capable of attaining at least 30' in height and at least 30' canopy diameter. g. Landscape plans shall show 30" high berms at specified locations on parking lot perimeters, if parking lots will be part of the project design. If there is insufficient space for berming plans shall show headlight screening hedges. Individual hedge plants shall be 36" tall and spaced so that they touch leaf -to -leaf at time of final inspection (Municipal Code § 17.18.070(D)(1)). Master Case 03-358 April 25, 2006 Page 6 of 33 h. Landscape plans shall show plant material to screen at maturity all trash enclosures, transformer boxes, vault boxes, backflow devices, air conditioner condensers, meters, and other exterior mechanical equipment. Screening material may include trees, shrubs (15 gallon minimum size), clinging vines, etc. Masonry block (concrete masonry unit) trash enclosures shall be screened with both shrubs and clinging vines (Municipal Code § 17.15.040 (B)(1-4). i. Landscape and site plans shall show continuous concrete curbing at least six (6) inches high and six (6) inches wide, at least (3) feet from any wall, fence, property line, walkway or structure when adjacent to any parking and/or drive aisles in parking lots. This 3 -foot areas shall be landscaped except as permitted by the Director of Community Development (Municipal Code § 17.18.070(E)(9). j. Landscape plans shall show all ground -mounted lighting fixtures, base dimensions, and typical finish elevations. k. The applicant shall design all irrigation systems for water conservation and is encouraged to use low flow irrigation techniques in all non -turf areas. PL19. The applicant shall apply jute netting to all graded slopes five feet (5') and higher in vertical elevation and elsewhere where needed for erosion control, and shall landscape graded slopes (Municipal Code § 17.28.020(B). Planting shall include one (1) tree per 150 square feet of slope area and one (1) shrub per 100 square feet of slope area (Municipal Code § 17.80.040 (K)(3). If the number of trees and/or shrubs is reduced to comply with Los Angeles County Fire Department, Land Development Division's fuel modification requirements, then the applicant shall proportionately increase tree container sizes up to the dollar equivalent of planting the required number of trees on project slopes. PL20. The overall slope, height or grade of any cut or fill slope shall be developed to appear similar to the existing natural contours in scale with the natural terrain of the subject site. PL21. Trees planted within fourteen (14) feet of the paved road section along all public streets shall conform to Municipal Code § 13.76.110 et seq (Parkway Tree Influence Area) and City Ordinance 92-38 (Parkway Influence Area). The property owner/manager/homeowners' association shall irrigate and maintain these trees according to City standards. PL22. Trees planted within City right-of-way shall conform to Municipal Code § 13.76 et seq (Parkway Trees). PL23. The applicant shall place water -conserving mulching material on all exposed soil planting areas not covered by turfgrass. Mulching material may include, and is not limited to, ..� Master Case 03-358 April 25, 2006 Page 7 of 33 shredded bark, river rock, crushed rock, pea gravel, etc., and must be a least three (3) inches deep. PL24. Prior to occupancy, the applicant shall install all proposed irrigation and landscaping, including irrigation controllers, staking, mulching, etc., to the satisfaction of the Director of Community Development. The Director may impose inspection fees for more than one landscape installation inspection. PL25. Prior to occupancy, the applicant shall submit to the Director of Community Development a letter from the project landscape architect certifying that all landscape materials and irrigation have been installed and function according to the approved landscape plans. PL26. Prior to the recordation of an applicable final tract/parcel map, a homeowner's association (HOA) shall be formed to have responsibility and authority of all landscape maintenance, including but not limited to landscaping, irrigation, slopes and drainage devices. PL27. Landscaping requirements for manufactured slopes adjacent to the Santa Clara River shall be per the requirements of the Mitigation Monitoring and Reporting Program. Building and Safety BSI. All structures shall comply with the detailed requirements of the 2001 California Building, Mechanical, and Plumbing Codes, 2004 California Electrical Code, 2005 California Energy Code, and the 2002 City of Santa Clarita amendments to the California codes. A copy of the City amendments is available at the Building and Safety public counter and on our website at www.santa-clarita.com. BS2. Two complete sets of plans prepared by a licensed Architect or Engineer shall be submitted to Building and Safety for a building permit(s). The submitted plans shall include architectural and structural plans, structural and energy calculations, soil/geology report, truss drawings and calcs, etc. BS3. A complete soils and geology report will be required for the project. The report shall be formally submitted to the Engineering Division for review and approval. BS4. Prior to issuance of building permits: rough grading and/or recompaction must be completed; a final compaction report and rough grading or pad certification shall be submitted to and approved by the Engineering Division. BSS. The property is located within 1000 feet of a natural hillside brush area and shall comply with the City's Fire Hazard Zone Ordinance. Master Case 03-358 April 25, 2006 Page 8 of 33 BS6. We have identified wells on the property. Have the Soils Engineer/Geologist determine the exact location and apply for an approval from the Division of Oil and Gas. Some well can not be built over and must maintain a minimum distance away for some wells. BST All structures (including pools and fences) shall be setback from any ascending and descending slopes per section 1806.5 of the California Building Code. Depending on the height of slopes, buildings may need to be setback up to 15 feet from the toe of slopes and up to 40 feet from the top of slopes. BS8. The building requires connection to a public sewer. BS9. DWV and on-site sewer lines and laterals shall have a minimum 2% slope per CPC. Set your pads accordingly. BS10. Accessibility requirements shall apply to apartment buildings containing 3 or more units and condominium buildings containing 4 or more units. All ground floor single -story units and all units within an elevator building shall comply with chapter 11A of the California Building Code. All common use areas, such as recreation areas, pools, walkways, etc shall be made accessible for the disabled with a path of travel to the public way and at least one disabled accessible parking space. BS 11. Accessibility requirements now apply to multi -story dwelling units, such as townhomes (formally exempt). At least 10% of such multi -story units on the site shall be accessible which includes an accessible path to the primary level entrance, all ground floor requirements, and at least one accessible bathroom on the primary entry level. All public and common use areas such as recreation areas, pools, walkways, etc shall be made accessible for the disabled with a path of travel to the public way and at least one disabled accessible parking space. Applies to projects submitted for plan review on or after July 1", 2005, per Senate Bill 1025. BS12. Prior to issuance of building permits, additional clearances from agencies not present at this DRC will be required from: a. William S. Hart School District and appropriate elementary school district, b. Castaic Lake Water Agency, c. L. A. County Sanitation District, d. L. A. County Health Services, Water & Sewerage Control (for on-site sewers). An agency referral list is available at the Building and Safety public counter. BS13. Prior to submitting plans to Building and Safety, please contact Deanna Hamrick, (661) 255-4935, for addresses. An application, site plan and floor plan will be required. BS14. The Building and Safety Division is scanning plans for permanent storage. To facilitate this effort, please incorporate the following information into the plans: Master Case 03-358 April 25, 2006 Page 9 of 33 a. The Permit Number, Sheet Title, and the Sheet Number shall be located in the lower right hand corner of each sheet of the drawings. b. A copy of the Planning Conditions. c. The Truss drawings. d. ICBG, UL and other outside agency reports for products or materials, when those reports contain information required by the contractor for construction or installation. e. The Recommendation Section of the Soils Report. BS15. These conditions are based on a review of conceptual building plans submitted. A thorough review will be performed and specific conditions will be generated when the final building plans are submitted to Building and Safety. Environmental Services Division Stormwater: ES 1. This project is a development planning priority project under the City's NPDES .— Municipal Stormwater Permit as a development with 10 or more dwelling units. An Urban Stormwater Mitigation Plan (USMP) that incorporates appropriate post construction best management practices (BMPs) into the design of the project must be prepared and approved prior to issuance of any grading or building permits. Please refer to the Standard Urban Stormwater Mitigation Plan (SUSMP) attached. ES2. This project is greater than one acre in size and is therefore subject to a General Construction Permit under the City's Municipal Stormwater Permit. The applicant must submit a State Notice of Intent (NOI) and Stormwater Pollution Prevention Plan (SWPPP) to the City prior to obtaining a grading permit. ES3. Please note the applicant shall be required to pay the $1271 USMP review fee and the $486 SWPPP review fee upon formal submittal. Contact the Environmental Services Division at (661) 284-1422 with any questions. Solid Waste: ES4. All single family residential dwellings should be designed with space provided for three 90 -gallon trash bins. ESS. For Multi -Family Developments, the City Standard is one 3 yard recycling bin and one 3 yard trash bin for the first 20 units with one 3 yard recycling bin and one 3 yard trash bin for each 20 units thereafter. The submittal is not clear as to whether there will be bins or individual trash cans used. If trash bins are to be used, provide sufficient trash enclosures to house 44 -three yard bins. Master Case 03-358 April 25, 2006 Page 10 of 33 ES6. Bins should be arranged in solid waste enclosures large enough to house either two or four bins. Half of the bins in each enclosure should be reserved for recycling. ES7. All trash enclosures should be shown on the site plan. ESS. All trash enclosures should be consistent with the surrounding architecture and be located to provide convenient pedestrian and collection vehicle access and have a solid roof. ES9. All new construction projects valuated greater than $500,000 must comply with the City's Construction and Demolition Materials (C&D) Recycling Ordinance. ES 10. If the project is valuated above $500,000 the applicant shall comply with the following: • A minimum of 50% of the entire project's inert (dirt, rock, bricks, etc.) waste and 50% of the remaining C&D waste must be diverted from landfills. • A Construction and Demolition Materials Management Plan (C&DMMP) must be prepared and approved by the Environmental Services Division prior to obtaining any grading or building permits. • A deposit of 3% of the estimated total project cost or $50,000, whichever is less, is required. The deposit will be returned to the applicant upon proving that 50% of the inert and remaining C&D waste was diverted. ES 11. Effective January 1, 2006, all projects within the City that are not self -hauling their waste materials must use one of the City's ten franchised haulers for temporary and roll -off bin collection services. Please contact Environmental Services staff for a complete list of franchised haulers in the City. Urban Forestry/Oak Trees Division OAK TREES UFI. The applicant and their contractors shall be in compliance with the City of Santa Clarita Oak Tree Ordinance and Preservation and Protection Guidelines at all times throughout the said project. UF2. The applicant and their contractors shall adhere to all recommendations set forth in the applicant's oak tree report that has been prepared by Mr. Thomas Leslie of Thomas Leslie Corporation originally dated October 17, 2003 and revised January 3, 2005. UF3. The applicant shall contact the City Oak Tree Specialist for a preconstruction meeting (on-site) prior to any grading or construction. At this time the protective fencing may be inspected for approval. The Oak Tree Specialist can be reached at (661) 294-2548. Master Case 03-358 April 25, 2006 Page 11 of 33 UF4. The applicant is given permission to remove tree number two (2) and tree number six (6) both are coast live oak (Quercus agrifolia) trees. Mitigation for these two trees shall be no less than $35,700.00 (tree number #2 appraised at $13,800.00 and tree number #6 appraised at $21,900.00). UFS. The applicant is given permission to remove oak tree number eight (8) identified as a scrub oak (Quercus john-tuckerii). Mitigation for this tree shall be consistent with Section VI. Mitigation Measures under item "b" of the applicant's oak tree report. UF6. All required mitigation oak trees shall be planted on site in areas that allow for the future growth of native trees. UFT Prior to grading approval, the applicant shall submit a preliminary landscape plan that identifies all existing oak trees and proposed locations for all mitigation oak trees. This site plan shall include a detailed planting legend which includes a breakdown of quantity, size, species, and monetary value of oak trees to confirm mitigation compliance. UF8. All oak trees that are 48" diameter box or larger that are proposed for mitigation shall be ._ planted in areas highly visible to the public (examples are entry points into the development, major landscape pockets near recreational facilities etc...). U179. In addition to the required mitigation oak trees, the applicant shall install one native oak tree for every five trees required on all slope plantings. (This requirement shall be addressed on the preliminary site plan as addressed in condition #6). Additional oak species may include but are not limited to Blue oak (Quercus douglasii) and Canyon oak (Quercus chrysolepis). UF10. All landscaping proposed for below the canopy of any oak tree shall consist of planting material/vegetation compatible with native species of oak. UF11. All mitigation oak trees shall be required to have a minimum mitigation period of five (5) years. The five year mitigation begins once the project has received the final certificate of occupancy. UF12. Protective fencing consisting of chain link material shall be installed at the protected zone (five feet from outside edge of canopy) of the remaining five oak trees that are located in the open space area (lot 121). Protective fencing shall consist of five (5') foot high chain link material supported by two (2") diameter steel poles driven directly into the ground and spaced at eight (8') foot intervals. Each tree may have one four (4') foot wide non - gated opening to allow for monitoring by the applicant's project arborist. U1713. Each oak tree (or group of oak trees) requiring protective fencing shall have installed at 50 foot intervals the following signage, "WARNING — THIS FENCE IS FOR THE PROTECTION OF THIS TREE AND SHALL NOT BE REMOVED OR RELOCATED Master Case 03-358 April 25, 2006 Page 12 of 33 WITHOUT WRITTEN AUTHORIZATION FROM THE CITY OF SANTA CLARITA DEPARTMENT OF COMMUNITY DEVELOPMENT AND THE CITY OAK TREE SPECIALIST." U1714. All protective fencing shall include 24" inch high or greater "silt fencing" at the base to eliminate additional soil or any other material from entering the protected zone of the oak tree. UF15. The applicant shall install and maintain a permanent irrigation system to all mitigation oak trees and all additional required oak trees. Irrigation system shall be approved by the Department of Community Development and the City Oak Tree Specialist. Once the oak trees have become established, the irrigation shall be shut off to eliminate the risk of various diseases and funguses to the root system, but must be kept in working condition to irrigate during periods of drought. U1716. Prior to final occupancy the applicant shall submit a Mitigation Monitoring and Reporting Plan to the City Oak Tree Specialist. Reports shall be submitted to the City Oak Tree Specialist once every three (3) months (quarterly) for the first three (3) years and once every six (6) months for the remaining two (2) years. Each report shall include colored photos of the all mitigation trees. UF17. No construction debris, building materials, equipment, or vehicles shall be placed or stored within the protected zone of any oak tree at any time. At no time shall the cleaning of tools, rinsing of concrete, or any other contaminates be permitted to enter the soil within the protected zone of any oak tree. UF18. All necessary pruning to any oak tree to allow for the necessary construction shall be performed by an ISA Certified Arborist or an approved licensed qualified tree trimming contractor. All wood chips generated from any oak tree pruning shall be evenly distributed beneath the canopy of the oak tree which was pruned. All trimming shall be completed according to the ANSI A300 companion publication "Best Management Practices Tree Pruning," and ISA Pruning Standards. UF19. The applicant shall have an exact count on all proposed oak trees for the project and separate by individual species. This information shall be included on the landscape plan. STREET TREES U1720. The applicant shall install a minimum of one (1) 24 inch box tree in the right of way of each residential unit. UF21. All streets public and private shall have approved street trees installed within the parkways. Street trees shall be spaced at a minimum distance of 30' feet on center and shall not exceed 40' feet on center. Master Case 03-358 April 25, 2006 Page 13 of 33 U1722. The applicant shall be required to install and maintain irrigation to all trees planted within the public right of way and all private streets and major thoroughfares. UF23. All trees planted in front of each residential unit, public right of ways, thoroughfares, and parkways shall be approved by the City of Santa Clarita Urban Forestry Department. UF24. Each street tree shall be planted according to the City of Santa Clarita Tree Planting and Staking Detail Sheet which is provided by the Urban Forestry Department. U1725. All trees planted within the public right of way shall meet or exceed the minimum requirements set forth in the California Department of Forestry and Fire Protection Specification Guidelines for Container -Grown Landscape Trees. U1726. Prior to grading the applicant shall submit a preliminary landscape plan that includes the proposed street trees and their locations. The site plan shall include a detailed plant legend identifying size, common and botanical names of trees and number of individual species be planted. U1727. All trees planted within a landscaped parkway that consist of lawn, shall have a minimum 36 -inch round tree well installed at the base of each tree with 3 -inches of natural bark or woodchips. Lineal root barriers shall be installed along the edge of both sidewalk and curb at a minimum distance of 10 -lineal feet. Root barriers shall be a minimum height of 18 -inches. Each tree planted shall have an 8-9 inch arbor guard placed at the base of each tree. UF28. All trees planted within the public right-of-way shall be approved by the City of Santa Clarita Urban Forestry Division. Once the trees are planted within the public right-of-way, all trees shall be protected under the City of Santa Clarita Street Tree Ordinance 90-15. UF29. Prior to final occupancy the applicant shall contact the Urban Forestry Division/Oak Tree Specialist for a final inspection to verify compliance with the above Conditions of Approval. Upon approval of the above conditions the applicant may remove all protective fencing. Urban Forestry/Oak Tree Specialist can be reached at (661) 294-2548. Parks and Recreation Division PRI. Prior to approval of the Tentative Map, the applicant is to provide conceptual landscape and trail plans for the review and approval by the Director of Parks, Recreation, and Community Services Department. PR2. Prior to the recordation of an applicable final tract/parcel map, the applicant is required to provide a park amenity plan at 1" = 40' per Exhibit "", which includes a 6.0 acre turn -key Master Case 03-358 April 25, 2006 Page 14 of 33 park. The plan shall be submitted for review and approval by the Director of Parks, Recreation and Community Services. • Park amenities to be completed to the satisfaction of the Director of Park, Recreation, and Community Services by 167`h occupancy. • Trail improvements and connections to be completed by 167th occupancy. • Paseos to be completed by first occupancy of each final tract/parcel map. PR3. Prior to the recordation of an applicable final tract/parcel map, the applicant is required to provide approximately 7.74 acres of land, or a combination of land and fees, to fulfill the Park Dedication Fee equal to the value of land established per the City's General Plan, "Parks and Recreation Element," with up to a 30% credit for the private recreational facilities to the satisfaction of the Director of Parks, Recreation and Community Services. An estimate is attached as Exhibit "El". The applicant shall be required to provide a certified real estate appraisal to establish the fair market value (FMV) of an acre of land within this project. PR4. Prior to the recordation of an applicable final tract/parcel map, the applicant is to provide to the City of Santa Clarita all applicable permits and letters of authorization from the Army Corps of Engineers, the California Department of Fish and Game and any other entity that has jurisdiction over any portion of the dedicated park area or trail/paseo areas. PRS. All water quality basins shall be separate lots owned and maintained by the homeowner's association. Water quality basins shall be fenced and screened from view with landscaping to the satisfaction of the Director of Parks, Recreation and Community Services. PR6. All applicable natural areas subject to yearly fuel modification clearance shall be maintained by the homeowner's association as required by the Fire Department. PR7. The applicant shall provide separate lots for City park land and open space lots to the satisfaction of the Director of Parks, Recreation and Community Services. PR8. No water quality basins should be located within the boundaries of park; final locations of the basins shall be reviewed and approved by the Director of Parks, Recreation and Community Services. PR9. Prior to the 167`h issuance of Certificate of Occupancy for the project, the applicant is required to have completed construction on the active park, the Santa Clara River Trail, and the Class I bike lanes along Newhall Ranch Road and Golden Valley Road. All other bike lanes, recreation areas, paseos and connections located within the project, shall be constructed prior to the 1" occupancy of the phase or unit in which they are located. Master Case 03-358 April 25, 2006 Page 15 of 33 PR10. Prior to the issuance of the first Certificate of Occupancy, the applicant shall dedicate, in fee, river bottom, habitat buffer and an 0.5 acre IC lot to the City of Santa Clarita. PRI. 1. The applicant shall provide project signage for park, trails and open space. The design of the signs shall be according to the City of Santa Clarita's Beautification Master Plan. Prior to the issuance of building permit, a final signage plan including the locations, content, and design of the signs shall be submitted for the review and approval of the Director of the Parks, Recreation and Community Services. Signs to be provided include a City of Santa Clarita park monument sign at the park entrance off "I" Street, directional signs, trail mile marker signs, and environmental interpretive signs to the satisfaction of the Director of Parks, Recreation, and Community Services. The applicant shall install all signage prior to the issuance of the 167"' Certificate of Occupancy. PR12. Prior to the issuance of rough grading permits, provide trail construction phasing plans for review and approval. Show all trail and paseo connections to the project, landscaping, fencing, lodge pole specifications, and signage required for the trail. Each trail connection to the project must be at minimum 10' in width with a minimum of 1' clearance on each side with a maximum gradient of 5%. The landscaping at each connection shall be maintained by the homeowner's association. PR13. Prior to the 167a' occupancy, the entire 35' Santa Clara River Trail extending from the East side of Golden Valley Road to the easterly project boundary, and the Class I bike lane from Golden Valley Bridge on Newhall Ranch Road to northerly project limits shall be completed. This includes all offsite trail improvements necessary to connect with adjacent approved Tract 53425. In addition, all City maintained trail connections to the 35' Santa Clara River Trail shall be constructed and operational to the satisfaction of the Director of Parks, Recreation, and Community Services. PR14. Prior to the issuance of the 167`" occupancy permit, the applicant is required to extend all trails, paseos, and bike paths to the extent of the project lines to the satisfaction of the Director of Parks, Recreation, and Community Services. PR15. Prior to the issuance of the first occupancy permit, the applicant shall provide a written agreement with William S. Hart Union School District stating the school shall maintain the "Loop trail' at east end of school site. PR16. Prior to the recordation of an applicable tract map the applicant will be required to provide trail right-of-way, easements and fee titles to the satisfaction of the Director of Parks, Recreation, and Community Services. This is to include, but is not limited to providing public access easements for all trail and open space lots 131, 142, 117-118, 121 and 122. These lots shall be owned and maintained by the HOA, however, the trail that crosses through them shall have an easement to the City for public access and maintenance by the City. Master Case 03-358 April 25, 2006 Page 16 of 33 Engineering Division General Requirements ENl. At issuance of permits or other grants of approval, the applicant agrees to develop the property in accordance with City codes and other appropriate ordinances such as the Building Code, Plumbing Code, Grading Code, Highway Permit Ordinance, Mechanical Code, Unified Development Code, Undergrounding of Utilities Ordinance, Sanitary Sewer and Industrial Waste Ordinance, Electrical Code, and Fire Code. EN2. Prior to issuance of permits, the applicant shall file with the County Recorder a map prepared by or under the direction of a registered civil engineer or licensed land surveyor in the State of California. The map must be reviewed and approved the City Engineer. The applicant shall note all offers of dedication by certificate on the face of the map. The applicant shall pay a deposit as required to review documents and plans for final map clearance in accordance with Section 16.26.060 of the Unified Development Code. EN3. Prior to final map approval, the applicant shall label driveways as "Private Driveway and Fire Lane" on the map, as directed by the City Engineer. EN4. Prior to final map approval, the applicant shall remove existing structures. ENS. Prior to final map approval, the applicant shall provide proof of access and delineate said access on the map. EN6. Prior to final map approval, the applicant shall quitclaim or relocate easements running through proposed structures, as directed by the City Engineer. ENT Prior to final map approval, the applicant must inform the City if he intends to file multiple final maps. The boundaries and phasing plan of these maps shall be designed, as directed by the City Engineer and the Director of Planning and Building Services. ENS. Prior to final map approval, the applicant shall show that portion which is not divided for the purpose of sale, lease, or financing as a "Designated Remainder" on the map. EN9. At map check submittal, the applicant shall provide a preliminary subdivision map guarantee. A final subdivision map guarantee is required prior to final map approval. EN10. Prior to final map approval, the applicant shall obtain approval of the City Engineer and the City Attorney for Covenants, Conditions and Restrictions (CC&R's) for this development. The applicant shall reimburse the City for the City Attorney's review and approval fee. The CC&R's shall include a disclosure to comply with the Geologist's recommendations in the Geology Report for restrictions on watering, irrigation, and planting, and recommend types of plants. The CC&R's shall also include language to Master Case 03-358 April 25, 2006 Page 17 of 33 inform future residents of the Keystone development of the possible future use of the Saugus Speedway located on Soledad Canyon Road. ENll. This tentative map approval is subject to the applicant's acceptance of the following conditions for acquisition of easements: a. The applicant shall secure at the applicant's expense sufficient title or interest in land to permit any off-site improvements to be made. b. If the applicant is unable to acquire sufficient title or interest to permit the off-site improvements to be made, the applicant shall notify the City of this inability not less than six months prior to approval of the final map. c. In such case, the City may thereafter acquire sufficient interest in the land, which will permit the off-site improvements to be made by the applicant. d. The applicant shall pay all of the City's costs of acquiring said off-site property interests pursuant to Government Code Section 66462.5. Applicant shall pay such costs irrespective of whether the final map is recorded or whether a reversion occurs. The cost of acquisition may include, but is not limited to, acquisition prices, damages, engineering services, expert fees, title examination, appraisal costs, acquisition services, relocation assistance services and payments, legal services and fees, mapping services, document preparation, expenses, and/or damages as provided under Code of Civil Procedures Sections 1268.510-.620 and Overhead. e. The applicant agrees that the City will have satisfied the 120 -day limitation of Government Code Section 66462.5 and the foregoing conditions relating thereto when it files its eminent domain action in superior court within said time period. f. At the time the applicant notifies the City as provided in "b." hereinabove, the subdivider shall simultaneously submit to the City in a form acceptable to the City all appropriate appraisals, engineering specifications, legal land descriptions, plans, pleadings, and other documents deemed necessary by the City to commence its acquisition proceedings. Said documents must be submitted to the City for preliminary review and comment at least 30 days prior to the applicant's notice described hereinabove at "b." g. The applicant agrees to deposit with the City, within five days of request by the City, such sums of money as the City estimates to be required for the costs of acquisition. The City may require additional deposits from time -to -time. h. The applicant shall not sell any lot/parcel/unit shown on the final map until the City has acquired said sufficient land interest. i. If the superior court thereafter rules in a final judgment that the City may not acquire said sufficient land interest, the applicant agrees that the City may initiate proceedings for reversion to acreage. j. The applicant shall execute any agreements mutually agreeable prior to approval of the final map as may be necessary to assure compliance with the foregoing conditions. Master Case 03-358 April 25, 2006 Page 18 of 33 k. Failure by the applicant to notify the City as required by "b." hereinabove, or simultaneously submit the required and approved documents specified in "e." hereinabove, or make the deposits specified in 'T." hereinabove, shall constitute subdivider's waiver of the requirements otherwise imposed upon the City to acquire necessary interests in land pursuant to Section 66462.5. In such event, subdivider shall meet all conditions for installing or constructing off-site improvements notwithstanding Section 66462.5. EN12. Prior to final map approval, the applicant is tentatively required to grant easements on the final map. Offsite easements shall be granted by separate document. The easements are subject to review by the City Engineer to determine the final locations and requirements. EN13. Prior to final map approval, the applicant shall provide a Will Serve Letter stating that Community Antenna Television service (CATV) will be provided to this project. EN14. Prior to occupancy, the applicant is required to install distribution lines and individual service lines for Community Antenna Television service (CATV) for all new development. Grading, Drainage & Geology Requirements EN15. Prior to issuance of grading permits, the applicant shall submit a grading plan consistent with the approved tentative map, oak tree report and conditions of approval. The grading plan shall be based on a detailed engineering geotechnical report specifically approved by the geologist and/or soils engineer that addresses all submitted recommendations. EN16. Prior to final map approval, the applicant shall dedicate all required easements on the final map; and prior to occupancy, construct required drainage improvements. Offsite easements shall be dedicated by separate document. ENIT Prior to issuance of building permits, the applicant shall eliminate all geologic hazards associated with this proposed development, or delineate restricted use areas on the final map as approved by the consultant geologist, as directed by the City Engineer. EN18. Prior to final map approval, the applicant shall dedicate to the City the right to prohibit the erection of buildings and other structures within all restricted use areas on the final map. EN19. Prior to grading plan approval, the applicant shall comply with all State requirements for construction within a special studies zone. A geology report must be submitted and approved. Copies of the report must be sent to the State geologist. EN20. Prior to grading plan approval, specific recommendations will be required from the consultant(s) regarding the suitability for development of all lots/parcels designed as Master Case 03-358 April 25, 2006 Page 19 of 33 ungraded site lots. The applicant shall file a report with the State Real Estate Commissioner indicating that additional geologic and/or soils studies may be required for ungraded site lots/parcels by the Soils and Geology Section. EN21. Prior to storm drain plan approval, the applicant shall obtain written approval from the Los Angeles County Flood Control District of all easements needed for future maintenance by the District. EN22. Prior to final map approval, the applicant shall submit drainage plans and necessary support documents to comply with Engineering requirements, as directed by the City Engineer. EN23. Prior to issuance of permits or final map approval, whichever comes first, the applicant shall pay a Storm Drain Transfer Security Cash Deposit (Deposit) of $100,000.00, which may be increased or decreased based upon an estimated cost to complete the transfer approved by the City Engineer. In order to receive a refund of the Deposit, the applicant or subsequent property owners shall complete the construction of all required storm drain infrastructure, provide all required materials and documentation, and complete the storm _ drain transfer from the City of Santa Clarita to the Los Angeles County Flood Control District within one year of the issuance of a "Notice of Completion" by the Los Angeles County Department of Public Works. If the transfer is not completed within one year, the City may use the Deposit to complete the transfer. If the Deposit is insufficient to complete the transfer, the City may seek additional funds from the applicant. Any funds remaining will be reimbursed to the applicant. The applicant or subsequent property owners shall also be responsible for providing regularly scheduled maintenance of the storm drain infrastructure, as directed by the City Engineer, until such time that full maintenance is assumed by the Flood Control District. EN24. Prior to final map approval, the applicant shall indicate by note on the map, prohibiting the lot owners within this development from interfering with the established drainage and from erecting concrete block walls or similar solid constructions, except as approved by the City Engineer. EN25. Prior to final map approval, the applicant shall show on the map all Los Angeles County Flood Control District right-of-ways. A permit will be required for any construction affecting the right-of-way or facilities. EN26. Prior to final map approval, the applicant shall establish a Home Owners' Association, or similar entity, to ensure the continued maintenance of any drainage improvements that are not eligible for transfer to the Los Angeles County Flood Control District for r maintenance. The applicant shall maintain all bio basins and swales within the project. Master Case 03-358 April 25, 2006 Page 20 of 33 EN27. Prior to grading plan approval, the applicant shall have approved by the City Engineer, a drainage study demonstrating that post -development flows from the site will not be increased from pre -development flows, or mitigate for the increase. EN28. Prior to issuance of building permits, the applicant shall construct all grading and drainage facilities within the project site. EN29. Prior to final map approval, the applicant shall provide for contributory drainage from adjoining properties and return drainage to its natural conditions and secure off-site drainage acceptance letters from affected property owners. EN30. The tentative map does not show proposed buildings. Specific drainage requirements for the site will be established at building permit application. EN31. Prior to final map approval, the applicant shall adjust lot/parcel lines near the top of slopes or at similar locations acceptable for establishment of slope maintenance responsibilities, as directed by the City Engineer. EN32. Prior to issuance of building permits and after final map recordation, the applicant file with the County Recorder an amending map prepared by or under the direction of a registered civil engineer or licensed land surveyor in the State of California, that has been reviewed and approved the City Engineer, to adjust lot/parcel lines near the top of slopes or at similar locations acceptable for establishment of slope maintenance responsibilities. EN33. Prior to final map approval, the applicant shall adjust, relocate, and/or eliminate lot lines, lots, streets, easements, grading, geotechnical protective devices, and/or physical improvements to comply with ordinances, policies, and standards in effect at the date the City determined the application to be complete, all, as directed by the City Engineer. EN34. Prior to issuance of grading permits or the commencement of any work within any natural drainage course, the applicant shall acquire permits from the Army Corps of Engineers and the California Department of Fish and Game. Flood Plain/Hazard Area Requirements EN35. A portion of the site is located in Zone "A" per the Federal Flood Insurance Rate Map. The applicant is required to comply with FEMA requirements to revise the rate map. Prior to grading permit, the applicant shall complete a CLOMR. Prior to occupancy, the applicant shall complete a LOMR. Street Improvement Requirements EN36. All streets shall be designed in accordance with the City's Unified Development Code and street design criteria; construction shall be completed prior to occupancy. If the City Master Case 03-358 April 25, 2006 Page 21 of 33 Engineer determines that it is more beneficial for the City to construct the required improvement at a later time, the applicant shall pay a cash in -lieu fee that is equivalent to the cost of improvement. EN37. Prior to any construction (including, but not limited to, drive approaches, sidewalks, curb and gutter, etc.), trenching or grading within public or private street right-of-way, the applicant shall submit a street improvement plan consistent with the approved tentative map, oak tree report and conditions of approval and obtain encroachment permits from the Engineering Division. EN38. Prior to occupancy, the applicant shall construct the final lift of asphalt on Golden Valley Road and "I" Street using asphalt rubber hot mix (ARHM) in accordance with section 302-9 of the latest edition of the Standards and Specifications for Public Works Construction and City standards . The design of the ARHM shall be reviewed and approved by the City Engineer. EN39. Prior to street plan approval, the applicant shall contact the City's Urban Forestry Division for street tree location, species, and approved method of installation and _ irrigation. The location of street trees shall not conflict with private sewer laterals. The applicant shall submit a street tree planting plan to the Urban Forestry Division for review and approval. EN40. Prior to issuance of encroachment permits for public improvements, the applicant, by agreement with the City Engineer, may guarantee installation of the improvements through faithful performance bonds, letters of credit or any other acceptable means. Occupancy shall be withheld if the improvements are not completed. EN41. Prior to final map approval, the applicant shall offer private and future street right-of-way for a total of 31 feet from centerline on "A" and `B" Street within the project site, as directed by the City Engineer. EN42. Prior to final map approval, the applicant shall offer street right-of-way for a total of 31 feet from centerline on "A" Street from "I" Street to the westerly edge of the DWP easement within the project site, as directed by the City Engineer. EN43. Prior to final map approval, the applicant shall offer private and future street right-of-way for a .total of 29 feet from centerline on "C", "D", "F", "G", and "H" Street within the project site, as directed by the City Engineer. EN44. Prior to final map approval, the applicant shall offer private and future street right-of-way for a total of 30 feet from centerline on "E" Street within the project site, as directed by the City Engineer. Master Case 03-358 April 25, 2006 Page 22 of 33 EN45. Prior to final map approval, the applicant shall offer street right-of-way for a total of 33 feet from centerline on "I" Street within the project site, as directed by the City Engineer. EN46. Prior to final map approval, the applicant shall dedicate right of way for Newhall Ranch Road, Golden Valley Road, and "I" Street, as shown on the tentative tract map. Right of way dedications for roadways shall be completed on the final map. Right of way dedication for the offsite portion of Golden Valley Road and Newhall Ranch Road shall be dedicated by separate document prior to final map approval. EN47. Prior to final map approval, the applicant shall provide a Drainage Acceptance Letter whenever there is an offer of future and private right-of-way. EN48. Prior to first occupancy of the first phase, the applicant shall construct the following required street improvements: Street Name Curb & Base & Street Street Sidewalk Landscaped Gutter Paving Lights Trees (5'min) Median Golden Valley Road x X x x x x "I" Street x X x x x Prior to first occupancy of each phase, the applicant shall construct the following required street improvements to provide adequate access to the satisfaction of the City Engineer: Street Name Curb & Base & Street Street Sidewalk Landscaped Gutter Paving Lights Trees (5'min) Median A, B, C, D, E, F, G, and H Street x X x x x EN49. Prior to final map approval, the applicant may be required to dedicate sidewalk easements sufficient to encompass the ADA specification sidewalks installed with drive approaches per the current City standard APWA 110-1, type C or equivalent; and prior to occupancy, construct all such drive approaches using a modified commercial driveway design that will provide a street/drive approach transition with a maximum algebraic grade difference of 7%. Construction details shall be shown on the street plan providing a transition no greater than this maximum. EN50. Prior to final map approval, the applicant shall provide for sight distance along extreme slopes, curves, or at intersections, as directed by the City Engineer, and provide the sight distance easement on the final map. Master Case 03-358 April 25, 2006 Page 23 of 33 EN51. Prior to the final map being filed with the County Recorder, the applicant shall not grant or record easements within areas proposed to be granted, dedicated, or offered for dedication for public streets or highways, access rights, building restriction rights, or other easements; unless subordinated to the proposed grant or dedication. If easements are granted after the date of tentative map approval, subordination must be executed by the easement holder prior to the filing of the final map. EN52. Prior to final map approval, the applicant shall provide letters of slope easements and drainage acceptance from adjacent property owners, as directed by the City Engineer. EN53. Prior to final map approval, the applicant shall obtain approval of the City Engineer and the City Attorney for a Home Owners Association Maintenance Agreement. The applicant shall reimburse the City for the City Attorney's review and approval fee. EN54. Prior to final map approval, the applicant shall dedicate slope easements, as directed by the City Engineer. EN55. Prior to final map approval, the applicant shall dedicate the right to prohibit direct vehicular ingress and egress rights on the final map on Golden Valley Road. EN56. Prior to final map approval, the applicant shall pay street maintenance fees to cover the cost of one-time slurry seal of all pavements constructed as public streets within the development. EN57. Prior to final map approval, the applicant shall pay fees for signing and striping of streets as determined by the City Engineer or shall prepare signing and striping plans for all multi -lane highways/roadways within or abutting the project, as directed by the City Engineer. EN58. Prior to occupancy, the applicant shall construct and landscape medians on Golden Valley Road and Newhall Ranch Road, or if medians are not desired at this time, shall pay an in -lieu fee for the cost of construction, as directed by the City Engineer. EN59. Prior to occupancy, the applicant shall install mailboxes and posts in accordance with the City's standards, and secure approval of the U.S. Postal Service prior to installation. EN60. Prior to occupancy, the applicant shall construct off-site improvements required to adequately serve this development. It is the sole responsibility of the developer to acquire the necessary right-of-way and/or easements. EN61. Prior to occupancy, the applicant shall repair any broken or damaged curb, gutter and sidewalk, and refurbish the half section of pavement on streets within or abutting the project. Master Case 03-358 April 25, 2006 Page 24 of 33 EN62. Prior to occupancy, the applicant shall construct full -width sidewalk at all walk returns. EN63. Prior to occupancy, the applicant shall construct a wheelchair ramp at intersections, as directed by the City Engineer. EN64. Prior to occupancy, the applicant shall provide and install street name signs, as directed by the City Engineer. Traffic Requirements EN65. All commercial driveways shall have a minimum stacking distance of: a. 20 feet from face of curb off of residential local collectors. b. 40 feet from face of curb off of secondary or major highways. c. 100 feet from face of curb off of secondary or major highways with a potential traffic signal. EN66. Adequate sight visibility is required at all intersections (street -street intersections or driveway -street intersections) and shall follow the latest Caltrans manual for applicable requirements. Adequate sight visibility (including comer sight visibility) shall be demonstrated on the final map, street improvement plan and grading plan. All necessary easements for this purpose shall be recorded with the final map. This shall be shown on all applicable plans prior to issuance of first building permit. EN67. All private driveways and roadways shall intersect with a public street at 90 degrees or as close to 90 degrees as topography permits (no less than 80 degrees). This shall be shown on all applicable plans prior to issuance of first building permit. EN68. No access will be permitted within curb return. This shall be included as a note on all applicable plans prior to issuance of first building permit. EN69. If a project component has a frontage facing a major road and also a side street, the access points (driveways) shall be on the side street, unless approved otherwise by the City Traffic Engineer. EN70. If any access points (driveways) are off of a roadway with a speed of 35 mph or higher, the inbound driveway lane shall have a minimum of 16 feet to allow right turns not to interfere with outgoing traffic. Curb radii for the non-residential access points shall be large enough to allow trucks in and out in a reasonable manner. The applicant shall use applicable templates for the size and type of the development. This shall be done prior to approval of the site plan by the City Engineer. Master Case 03-358 April 25, 2006 Page 25 of 33 EN71. No residential driveways shall be permitted along residential collector streets, residential roadways with 64 -foot right-of-way, or along residential roadways projected to carry over 2,000 vehicles per day (per UDC Section 16.07.020). Such a restriction is subject to the discretion of the City Traffic Engineer. EN72. Any future signalized intersections not identified in the approved EIR shall be approved by the City Traffic Engineer, and shall be a minimum of 1,300 feet from adjacent signalized intersections to ensure proper signal timing. EN73. Subject to the discretion of the Director of Public Works, the applicant shall install traffic -calming features along, but not limited to, Dorothy Street, Ermine Street, and Steinway Street. These features may include, but not be limited to, narrow street sections, intersection chokers, traffic circles and street closure, which shall be of a method and location to the satisfaction of the Director of Public Works. All traffic calming features shall be submitted to the Director of Public Works prior to approval and subject to L.A. County Fire Department approval. The actual design of the preferred traffic calming measures shall be brought to the City Council for their review and comment prior to final design and approval. All traffic calming features shall be shown on all applicable plans prior to approval. EN74. All unsignalized public roadway, private roadway and/or private driveway access locations along Golden Valley Road shall be limited to right -tum in/right-turn out only and shall include acceleration/deceleration lanes as deemed necessary by the City Traffic Engineer. This shall be shown on all applicable plans prior to issuance of the first building permit. EN75. Prior to the issuance of the first residential occupancy permit, the intersections listed below shall be in place and shall include their required number of lanes and operational traffic signals. a. Valencia Boulevard and Magic Mountain Parkway Eastbound: 2 left -turn lanes, 1 through lane, 1 shared through/right-turn lane Westbound: 2 left -turn lanes, 2 through lanes, 1 right -turn lane Northbound: 1 left -turn lane, 2 through lanes, 1 shared through/right-tum lane Southbound: 1 left -turn lane, 3 through lanes, 2 right -turn lanes b. Bouquet Canyon Road and Newhall Ranch Road: Eastbound: 2 left -turn lanes, 3 through lanes, 2 right -turn lanes Westbound: 2 left -turn lanes, 3 through lanes, 1 right -tum lane Northbound: 2 left -turn lanes, 4 through lanes, 1 right -turn lane Southbound: 2 left -tum lanes, 4 through lanes, 2 right -turn lanes Master Case 03-358 April 25, 2006 Page 26 of 33 c. Bouquet Canyon Road and Soledad Canyon Road: Eastbound: 2 left -turn lane, 2 through lanes, 1 shared through/right-turn lane Westbound: 2 left -tum lanes, 3 through lanes, 1 right -turn lane Northbound: 1 left -tum lane, 4 through lanes, 1 right -turn lane Southbound: 2 left -turn lanes, 3 through lanes, 2 right -turn lanes d. Golden Valley Road and Newhall Ranch Road: Eastbound: 2 left -turn lanes, 3 through lanes Westbound: 3 through lanes, 2 right -turn lanes Southbound: 2 left -turn lanes, 2 right -turn lanes e. Soledad Canyon Road and Whites Canyon Road Eastbound: 2 left -tum lanes, 3 through lanes Westbound: 2 left -turn lanes, 3 through lanes Northbound: 2 left -turn lanes, 2 through lanes, 1 right -tum lane Southbound: 2 left -turn lanes, 2 through lanes, 1 right -turn lane f. Golden Valley Road and "I" Street North Eastbound: 1 left -tum lane, 1 right -turn lane Northbound: 1 left -turn lane, 2 through lanes Southbound: 1 through lane, 1 shared through/right-turn lane g. Golden Valley Road and "I" Street South Eastbound: 1 left -turn lane, 1 through lane, 1 shared through/right-turn lane Westbound: 1 left -tum lane, 1 through lane, 1 shared through/right-tum lane Northbound: (school driveway access) Southbound: 1 shared left-turn/through lane, 1 right -turn lane EN76. Prior to the issuance of the first residential occupancy permit, all roadways listed below shall be in place and functional. a. GOLDEN VALLEY ROAD Project's northern boundary to Newhall Ranch Road New four -lane roadway (ROW per TTM) with sidewalks, Class I Bike Trail and raised landscaped medians. Master Case 03-358 April 25, 2006 Page 27 of 33 Bouquet Canyon Road to Golden Valley Road New four -lane roadway graded to full width (ROW per TTM) with sidewalks, Class I Bike Trail and raised landscaped medians at ultimate locations. c. NEWHALL RANCH ROAD/GOLDEN VALLEY ROAD BRIDGE New bridge (ROW per TTM) with three travel lanes in each direction, Class I Bike Trail and sidewalk on one side. EN77. Prior to issuance of the first residential occupancy permits, the applicant shall install traffic calming features along private streets and driveways in the project area, which shall be of a method and location to the satisfaction of the Director of Transportation and Engineering Services and Director of Planning and Building Services. Roadway designs, including traffic calming features, shall be submitted to the City Traffic Engineer prior to approval and subject to L.A. County Fire Department approval. The necessary right-of- way shall be dedicated prior to map recordation. All traffic calming features shall be shown on all applicable plans prior to approval. EN78. No gates for public residential streets are approved as part of this project. EN79. Any gates on private residential streets shall be designed and located to provide adequate stacking and turn -around areas. Prior to issuance of the first residential building occupancy permits, the design for all residential gates shall be submitted to the City Traffic Engineer prior to approval and subject to L.A. County Fire Department approval. The necessary right-of-way shall be dedicated prior to map recordation. All residential gates on private streets shall be shown on all applicable plans prior to approval. EN80. The applicant is required to install three-inch traffic signal conduits with 12 pair #19 interconnect cable and 96 -strand single -mode fiber-optic interconnect cable along all secondary and major arterials (on and off site), between all proposed traffic signals and the closest adjacent traffic signal, in at least two directions. This interconnect conduit and cable shall also be required along new frontage improvements. All improvement plans for the above interconnect shall be approved by the City Traffic Engineer. The interconnect conduit and cable shall be installed at the time of the respective traffic signal and/or frontage improvements. EN81. All new or modified intersections of a major arterial with another major arterial or a secondary arterial shall be designed to furnish and install a fifth surveillance video camera (pan -tilt -zoom), in addition to any vehicle detection equipment as approved by the City Traffic Engineer. The video camera/s shall be installed at the time the respective intersection is installed or modified. Master Case 03-358 April 25, 2006 Page 28 of 33 EN82. The applicant shall pay a traffic -signal timing fee for the update of the traffic -signal timing at up to 20 intersections in the surrounding area. The cost is $4,000 per intersection ($80,000 total). The fee shall be paid prior to issuance of the first building occupancy permit. Sewer Improvement Requirements EN83. Prior to final map approval, the applicant shall dedicate all necessary sewer easements. The sewer plans shall be approved by the City Engineer. EN84. Prior to occupancy, the applicant shall construct main -line sewers with separate laterals to serve each lot/parcel. Main -line sewers shall have a straight alignment, and shall be located five feet from and on the northerly and easterly sides of the centerlines of streets or alleys, except on major or secondary highways where separate sewers shall be located in the roadway six feet from each curb line, per the City of Santa Clarita Municipal Code, Section 15.32.460. EN85. Prior to final map approval, the applicant shall send a print of the land division map to the County Sanitation District with the request for annexation in writing. EN86. The discharge of sewage from this land division into the public sewer system will not violate the requirements of the California Regional Water Quality Control Board pursuant to Division 7 (commencing with Section 13000) of the Water Code. The deposit is required upon submittal of final map and easement documents. EN87. Prior to sewer plan approval, the applicant shall provide a sewer area study for approval by the City Engineer. The area study must analyze the proposed site, contributory area including Tract 31803, and all existing development contributing to the City sewer from the proposed site to the Sanitation trunk line connection. Fees and Miscellaneous Requirements EN88. Prior to final map approval, the applicant shall pay the applicable Bridge and Thoroughfare District Fee to implement the highway element of the General Plan, as a means of mitigating the traffic impact of this project. The applicant may construct off-site improvements of equivalent value in lieu of paying the Fee, subject to approval of the City Engineer. The fee shall be paid at the times stated above and will be reimbursed upon completion and acceptance of such off-site improvements. [x ] Bouquet Canyon Bridge and Thoroughfare District ($15,030) [ ] Eastside Bridge and Thoroughfare District ($15,560) [ ] Valencia Bridge and Thoroughfare District ($10,930) Master Case 03-358 April 25, 2006 Page 29 of 33 [ ] Via Princessa Bridge and Thoroughfare District ($16,410) The fee shall be calculated as follows: Single family = the number of units (319), times the district rate ($15,030); which is equal to $4,794,570 until June 30, 2005. Townhouse = the number of units (180), times the district rate ($15,030), times 0.8; which is equal to $2,164,320 until June 30, 2005. Industrial = the gross acres (.5), times the district rate ($15,030), times 3.0; which is equal to $22,545 until June 30, 2005. The total estimated B&T fees for the project is $6,981,435. The fee is subject to change and is based on the rate at the time of payment. Golden Valley Road may be eligible for B&T reimbursement, subject to the discretion of the City Engineer EN89. Prior to final map approval, the project shall be annexed to an existing Streetlight Maintenance District, or a new District shall be formed, to finance the cost of annual streetlight maintenance. EN90. All construction plans and activities must be in compliance with the provisions of the storm water permit and associated Standard Urban Storm water Mitigation Plan (SUSMP) as required by the National Pollution Discharge Elimination System (NPDES), including all applicable Best Management Practices (BMPs), both permanent and construction -related. The permanent BMPs shall be in place prior to acceptance of the associated improvements. Construction -related BMPs shall be on the SUSMP plan and shall be in place during all phases of the construction. Transit TS 1. The Transit Impact Fee does apply. Currently the rate is $200 per residential unit. The applicant is advised that the fee is currently under revision. Fee in place at the time of final map recordation shall be paid. TS2. Applicant shall construct a pedestrian path from the bus stops to the development. TS3. Applicant shall provide a bus stop at the location of: 1. Northbound Golden Valley Road farside Newhall Ranch Road 2. Northbound "I" Street farside "A" Street 3. Southbound "I" Street farside "A" Street 4. Northbound Golden Valley Road farside "P' Street (turnout) 5. Southbound Golden Valley Road farside "P' Street (turnout) Master Case 03-358 April 25, 2006 Page 30 of 33 TS4. The bus stops shall consist of a 10'x25' concrete passenger waiting pad placed behind the sidewalk. In addition, the bus stops located on Golden Valley Road shall also consist of a 10'x25' concrete passenger waiting pad placed behind the sidewalk and include a stylized bench and trash receptacle. Bench and trash receptacle specifications and all appropriate paperwork for bus stop shall be supplied to the Transit Division prior to installation. Proposed amenities shall be approved by City Transit staff prior to installation. TSS. Bus stops shall be shown and labeled on the site plan. TS6. The bus stops shall comply with all ADA regulations as specified in the most recent version of the California Disabled Accessibility Guidebook (Ca1Dag). Proposed disabled access shall b e drawn on all plans. TS7. At the Golden Valley Road bus stop locations, a bus turnout shall be constructed to the required dimensions as determined by the Director of Public Works. TSB. The bus stop location shall be a minimum of 100' from the curb return or as specified by city staff. TS9. Prior to occupancy of the first building, the bus stop shall be installed to the satisfaction of city staff. TS 10. At the location of the bus stop, the sidewalk shall meet the street for no less than 25'. TS 11. At all bus stops applicant shall construct an in -street concrete pad pursuant to the current city standard and APWA 131-1. Special Districts SD 1. No slopes or on-site landscaped areas are allowed into an Landscape Maintenance District (LMD). Prior to the recordation of an applicable final tract/parcel map, a homeowners association (HOA) or a Property Owners Association (POA) or other funding mechanism, shall be created to have responsibility and authority of all designated landscape and maintenance including, but not limited to, parkways, slopes, weed abatement, irrigation, or any long term maintenance required to on or offsite areas as a result of this project. SD2. Prior to building permit issuance, the applicant shall annex the property into the City's Landscape Maintenance District (LMD) for the maintenance and improvement of medians and streetscapes. SD3. Prior to the recordation of the final tract/parcel map, the LMD median landscape improvements shall be bonded for or installed. The landscape improvements shall Master Case 03-358 _. April 25, 2006 Page 31 of 33 include the median landscape improvements in Golden Valley Road along the property frontage and as required for this project. SD4. All parkway landscaping is to be maintained by the adjacent property owners. SDS. Prior to the issuance of the encroachment permit for the street improvements (unless another timeframe is approved), the applicant shall provide final landscape and irrigation plans for all LMD median areas for review and approval by the Administrative Services Department. SD6. Prior to the issuance of a Certificate of Occupancy, all LMD median landscape improvements to the medians adjacent to the tract frontage and any additional median island improvements required by the City Traffic Engineer shall be made to the satisfaction of the Director of Administrative Services. Los Angeles County Fire Department FD1. Access shall comply with Section 902 of the Fire Code, which requires all weather _ access. All weather access may require paving. FD2. Fire Department Access shall be extended to within 150 feet distance of any exterior portion of all structures. FD3. Where driveways extend further than 300 feet and are of single access design, turnarounds suitable for fire protection equipment use shall be provided and shown on the final map. Turnarounds shall be designed, constructed and maintained to insure there integrity for Fire Department use. Where topography dictates, turnarounds shall be provided for driveways that extend over 150 feet in length. FD4. Private driveways shall be indicated on the final map as "Private Driveway and Firelane" with the widths clearly depicted and shall be maintained in accordance with the Fire Code. All required fire hydrants shall be installed, tested and accepted prior to construction. FDS. Vehicular access must be provided and maintained serviceable throughout construction to all required fire hydrants. All required fire hydrants shall be installed, tested and accepted prior to construction. FD6. This property is located within the area described by the Fire Department as "Very High Fire Hazard Severity Zone" (formerly Fire Zone 4). A "Fuel Modification Plan" shall be submitted and approved prior to final map clearance. (Contact Fuel Modification Unit, Fire Station #32, 605 North Angeleno Avenue, Azusa, CA 91702-2904, Phone (626) 969- 5205, for details). Master Case 03-358 April 25, 2006 Page 32 of 33 FD7. Provide Fire Department or City approved street signs and building access numbers prior to occupancy. FD8. Provide water mains, fire hydrants and fire flows as required by the County of Los Angeles Fire Department, for all land shown on map which shall be recorded. FD9. The required fire flow for public fire hydrants at this location is 5000 gallons per minute at 20 psi for a duration of 5 hours, over and above maximum daily domestic demand. 3 Hydrant(s) flowing simultaneously may be used to achieve the required fire flow. FD 10. Fire hydrant requirements areas follows: Install 43 public fire hydrant(s). Upgrade / Verify _ existing Public fire hydrant(s). Install _ private on-site fire hydrant(s). FD11. All hydrants shall measure 6"x 4"x 2-1/2" brass or bronze, conforming to current AWWA standard C503 or approved equal. All on-site hydrants shall be installed a minimum of 25' feet from a structure or protected by a two (2) hour rated firewall. ® Location: As per map on file with the office. ® Other location: Please refer to the attached map for hydrant locations. FD12. All required fire hydrants shall be installed, tested and accepted or bonded for prior to Final Map approval. Vehicular access must be provided and maintained serviceable throughout construction. FD13. Additional on-site access requirements for the multi -family, apartments, recreation/ park, school and industrial lots will be addressed with the submission of future development. FD14. As indicated, for Lots 97, 98 & 99 provide a second means of access. FD15. The residential lots (Lots 1-96), and Lots 97 & 98 have been identified to have gates installed. A separate gate detail plan for each lot is required to be submitted to the Land Development Unit. The call box and/ or guard shack shall be a minimum of 50 feet away from the street. Each entry and exit point is required to minimum paved width of 20 feet, clear -to -sky, to be posted and red curbed "NO PARKING -FIRE LANE". If the gate serves as a single entry/ exit only, provide a minimum unobstructive width of 26 feet, clear -to -sky, to be posted and red curbed. A tum -around with a 32 -foot center -line turning radius is required prior to the gates. All gate accessory hardware is required to be out of the accessway when the gate is in the fully open position. Gates shall comply with the Department's Regulation #5. Master Case 03-358 April 25, 2006 Page 33 of 33 FD16. Submit a detail plan of the "Road -abouts" to the Fire Department's Land Development Unit for review. The "Round -abouts" shall comply to the design standard of the Los Angeles County Department of Public Works. FD17. As noted on the tentative map, the street design for Golden Valley shall provide turn- around capabilities every 600 feet. The turn -around shall provide a mountable curb and driveable surface for a minimum of 20 feet. FD18. Provide a striping plan for Golden Valley Road to the Fire Deparment's Land Development Unit for review, prior to further approvals. FD19. As identified on the tract map, Thirty-six (36) fire hydrants are required to have a fire flow of 5000 gallons per minute at 20 psi for a duration of 5 hours with three (3) hydrants flowing simultaneously may be used to achieve the required fire flow. FD20. As identified on the tract map, seven (7) fire hydrants are required to have a fire flow of 1250 gallons per minute at 20 psi for a duration of 2 hours with one (1) hydrant flowing simultaneously may be used to achieve the required fire flow. FD21. Additional fire hydrants will be required with the furture development of Lots 97, 98, 99, 100, 101, IOTA & 102. S:\PBS\CURREI'M!2002\02-175\fnal city council conditions of approval . Y . .1u1 ►M VESTING TENTATIVE TRACT MAP 60258 On file in the Planning Division. ATTACHMENT C General Plan Amendment Map