Loading...
HomeMy WebLinkAbout2007-10-09 - AGENDA REPORTS - BRIDGE MAINT PGM PROJ ACCEPT (2)CONSENT CALENDAR DATE: SUBJECT: DEPARTMENT: Agenda Item: e+ CITY OF SANTA CLARITA AGENDA REPORT City Manager Approval: Item to be presented by: October 9, 2007 Curtis Nay 2005-2006 BRIDGE MAINTENANCE PROGRAM, PROJECT NO. M4004 - PROJECT ACCEPTANCE Public Works RECOMMENDED ACTION 1. City Council accept the completion of the 2005-2006 Bridge Maintenance Program, Project No. M4004. 2. Direct the City Clerk to file the attached Notice of Completion. 3. Approve an additional expenditure for $26,246 to Griffith Company. 4. Direct staff to release the 10 percent retention 35 days after the Notice of Completion is recorded, provided no stop notices have been filed, as provided by law. BACKGROUND On February 14, 2006, the City Council awarded the contract for the 2005-2006 Bridge Maintenance Program, Project No. M4004, to Griffith Company in the amount of $635,187. Construction commenced on October 26, 2006. The work generally consisted of repairing and sealing surface cracks in the concrete bridge deck. Other maintenance items included removal and replacement of driveways, sidewalk, curb and gutter, and repairs to the picket railing, and drainage improvements. The construction contract was completed to the satisfaction of the City Engineer on June 29, 2007. During construction, the contractor performed additional work required for two bridges. The Newhall Ranch Road bridge needed spalled concrete repairs on the bridge deck after the deck was cleaned with abrasive blasting and prior to the application of methacrylate. Additionally, the Sierra Highway bridge required a polyester concrete overlay in lieu of the methacrylate sealant due to exposed rebar that was discovered after the deck was cleaned by the abrasive blasting. � A�OooQ Q 6 The total construction cost was $661,433. Although the extra work was significant and the cost exceeded the contractor's contingency amount, the additional work does not exceed the project budget amount. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT There is no fiscal impact created by the approval of the recommended action. Adequate funding has been budgeted in Account Nos. M4004601-5161.001 and M4004260-5161.001 to provide for project costs. ATTACHMENTS Notice of Completion List of Bridges RECORDING REQUESTED BY: City of Santa Clarita Public Works Department WHEN RECORDED, MAIL TO: Sharon L. Dawson, CMC, City Clerk City of Santa Clarita 23920 Valencia Boulevard, Suite 304 Santa Clarita, CA 91355-2196 RECORDING FEES EXEMPTED G.C. • 6103 and 27383 Space Above This Line For Recorder's Use NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN: 1. The City of Santa Clarita, a municipal corporation, is the owner on file of a certain public improvement known as Fiscal Year '2005/2006 Bridge Maintenance Program, Project No. M4004. 2. The City's address is 23920 Valencia Boulevard, Suite 300, Santa Clarita, California 91355-2196. 3. The locations of said public improvement is as follows: Wiley Canyon Road and Tournament Road bridges over the Pico Canyon Channel, Orchard Village Road and Valencia Boulevard bridges over the Santa Clara River South Fork, Soledad Canyon Road and Sierra Highway bridges over the Mint Canyon Wash, Pamplico Drive and Tupelo Ridge Drive bridges over the Dry Canyon Channel, Sand Canyon Road bridge over the Santa Clara River, Whites Canyon Road bridge over the SP/UP Railroad and Newhall Ranch Road bridge over the San Francisquito Creek. 4. On February 14, 2006, a contract to construct said public improvement was awarded to Griffith Company, 12631 E. Imperial Hwy, Santa Fe Springs, CA 90670. 5. Work under said contract was completed on June 29, 2007, to the satisfaction of the City Engineer, and was accepted by the City on October 9, 2007. STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) ss. CITY OF SANTA CLARITA ) I have read the foregoing Notice of Completion and know its contents. I am the City Clerk of the City of Santa Clarita and am authorized to make this verification for and on its behalf, and I make this verification for that reason. I am informed and believe and on that ground allege that the matters stated in the foregoing document are true. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Sharon L. Dawson, CMC, City Clerk City of Santa Clarita Date s: \ pw\eng-civi\M4004bridgemaintenanceprogram \ projectcompletion.doc BRIDGE LIST FY 05-06 Bridge Maintenance Program Bridoe Number Bridoe Location 1851 Wiley Canyon Road over Pico Canyon Channel 1932 Orchard Village Road over Santa Clara River SO FK 2319 Soledad Canyon Road over Mint Canyon Wash 2345 Pamplico Drive over Dry Canyon Channel 2376 Tournament Road over Pico Canyon Channel 2878 Tupelo Ridge Drive over Dry Canyon Channel 3537 Sand Canyon Road over Santa Clara River 3538 Sierra Highway over Mint Canyon Wash 3653 Whites Canyon Road over SP/UP RR 3679 Valencia Boulevard over Santa Clara River SO FK 3695 Newhall Ranch Road over San Francisquito Creek