Loading...
HomeMy WebLinkAbout2007-06-12 - AGENDA REPORTS - FY 2006 2007 BRIDGE MAINT PGM (2)CONSENT CALENDAR Agenda Item: CITY OF SANTA CLARITA AGENDA REPORT City Manager Approval: Item to be presented by: DATE: June 12, 2007 SUBJECT: 2006-2007 BRIDGE MAINTENANCE PROGRAM, PROJECT NO. 50030 - APPROVE THE PLANS AND SPECIFICATIONS AND AWARD THE CONSTRUCTION CONTRACT DEPARTMENT: Public Works RECOMMENDED ACTION 1. City Council approve the plans and specifications and award the construction contract for the 2006-2007 Bridge Maintenance Program, Project No. S0030, to Abbott Contracting and Engineering, Inc. in the amount of $297,527.00, and authorize a 15 percent contingency in the amount of $44,629.05. 2. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND Los Angeles County performs a bi-annual inspection of the City's bridges as required by the State of California. The County subsequently provides an inspection report to the City that lists all of the bridge deficiencies and maintenance repair items. In order to provide a well-maintained bridge system, the City repairs the items listed on the reports. This project is for Phase II of the Bridge Maintenance Program, which will improve various bridges throughout the City by repairing and sealing surface cracks in the concrete bridge deck and repairing other maintenance items identified on the inspection reports. Maintenance of the bridges will enhance the appearance of the area and extend the economic life of the bridges. On May 31, 2007, the City's Purchasing Division received the following bids for the project: Company Location Abbott Contracting and Engineering, Inc. Norco, CA Griffith Company Santa Fe Springs, CA G. Coast Construction Encino, CA MA-IrROVED� Bid Amount $297,527.00 $382,495.00 $386,590.00 The Engineer's Estimate for the construction of this project is $400,000.00. The lowest bid was submitted by Abbott Contracting and Engineering, Inc. in the amount of $297,527.00. After reviewing the bid summary, staff verified the apparent low bidder's contractor's license, surety companies, and project references. Based on the investigation, staff recommends awarding the construction contract to Abbott Contracting and Engineering, Inc., the lowest responsive bidder, in the amount of $342,156.05. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT Funds for this project in the amount of $500,000.00 have been allocated to Account Nos. S0030205 and 50030001. Expenditures to date are $110,000.00, leaving an available year-end estimate of $390,000.00, which will adequately provide for the awarded construction contract of $342,156.05 and $47,843.95 for other project related costs including inspection, testing, project management, and labor compliance services. ATTACHMENTS Bridge List City of Santa Clarita FY 06-07 Bridge Maintenance Program Project No. S0030 Bridge No. 1577 Bridge No. 1814 Bridge No. 2034 Bridge No. 2035 Bridge No. 3263 Bridge No. 3515 Lyons Avenue over Santa Clara River (South Fork) Avenida Rondel over PUC Garzota Drive over Dry Canyon Channel Decoro Drive over Dry Canyon Channel Haskell Canyon Road over Bouquet Canyon Channel McBean Parkway over Santa Clara River (Northbound)