HomeMy WebLinkAbout2007-01-09 - AGENDA REPORTS - SIDEWALK CURB GUTTER CONTR (2)Agenda Item:_— CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR City Manager Approval: Item to be presented by: Curtis Nay DATE: January 9, 2007 SUBJECT: 2006-2007 REMOVAL AND REPLACEMENT OF SIDEWALK, CURB AND GUTTER, AND ACCESS RAMPS, PROJECT NOS. M0054, M0053, AND T0024 – AWARD CONSTRUCTION CONTRACT DEPARTMENT: Public Works RECOMMENDED ACTION City Council approve the contract documents and specifications; award the construction contract for Fiscal Year 2006-2007 Concrete Rehabilitation Program, Project Nos. M0054, M0053, and T0024, to FS Construction in the amount of $268,386.25, and authorize a 10 percent contingency in the amount of $26,838.63; and authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND This project will upgrade the City's sidewalk system and replace existing concrete pads damaged by tree root infiltration. In addition to various sidewalk improvements, the curb and gutter program will improve drainage flow into local stone drains, thereby improving stormwater quality and minimizing street erosion. The Access Ramp Program will serve our disabled community through the installation of new ramps, while meeting the requirements outlined in Title 21 of the Americans with Disabilities Act (ADA). The contracts for these projects are being combined to most efficiently use the available funding. The list of locations (Exhibit "A") was generated by residents' requests to the Public Works Department and the City Manager's Office, or were areas identified by City staff as needing restoration. Substantial constraints and controls have been established in the construction documents to reduce potential impacts on local traffic and to homeowners during the construction phase. Construction is scheduled to start in January 2007, and is anticipated to be complete within 60 working days after the effective date of the Notice to Proceed. Staff will appoint inspectors to ensure proper work performance by the contractor and to handle daily field issues. On November 5, 2006, staff was directed by the Director of Public Works to authorize the advertisement for construction bids. On December 6, 2006, the City's Purchasing office received bids for the project (Exhibit `B"). The lowest responsive bid was submitted by FS Construction in the amount of $268,386.25. The Engineer's Estimate for the project construction is $275,000.00. Staff recommends that the project be awarded to FS Construction, the lowest responsive bidder. FS construction possesses a state Contractor's License and is in good standing with the State Contractor's License Board. The bid from FS Construction in the amount of $268,386.25 was reviewed for accuracy and conformance to the contract documents and was found to be complete. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT Funds for these combined projects have been appropriated to Account Nos. M0054201, M0053456, and T0024001 for Fiscal Year 2006-2007 in the amount of $330,000.00. These funds are available in the following designated accounts: Available Projects Fiscal Year Account Nos. Funds Sidewalk Repair Program 2006-2007 M0054201 230,000.00 Stormwater Flowline Repair 2006-2007 M0053456 75,000.00 Access Ramp Construction 2006-2007 T0024001 25.000.00 Total Budget Amount: $330,000.00 ATTACHMENTS Exhibit "A" List of Locations Exhibit "B" Bid Results EXHIBIT "A" 2006-2007 ANNUAL CONCRETE REHABILITATION PROGRAM PROJECT NOS. M0054, M0053, AND T0024 AREA No. 1 CANYON COUNTRY Ermine Street Northbrook Avenue Meadowcreek Road Drasin Drive Goodvale Road Soledad Cyn. Road Pleasantdale Street Delight Street Glasser Avenue Fairweather Street Babington Street Four Oaks Street Cedarcreek Street Stillmore Street AREA No. 2 VALENCIA Avenue Stanford Chesire Lane Westover Way Gravino Road Bajada Drive Latana Court Velan Drive Taranto Avenue Del Monte Drive Huerta Drive Viento Court Estaban Drive El Paseo Drive Sombras Court AREA No. 3 SAUGUS Festividad Drive Ridgegrove Drive Urbandale Avenue Theodore Court Kristin Lane Cabrera Avenue Pine Cove Circle s:pw\rnp<ivi\ConcReheb06-OTAGENDAREMbc,tionW�,doc EXHIBIT "B" Annual Concrete Rehabilitation Program Fiscal Year 2006-2007 Company Kalban, Inc. Accord Engineering Silvia Construction, Inc. A.M. Concrete FS Construction Cedars Eng. Const. Cinary Const. Co., Inc., Paveco Construction, Inc., R.C. Becker & Sons, Inc., Toro Enterprises, Inc., General Pavement Mgmt. .:pW g-civiTo.Reh.b064TR .,d.fBid0pming2. o Location Amount Sun Valley, CA $351,107.75 Santa Ana, CA $279,820.50 Rancho Cucamonga, CA $364243.00 Sun Valley, CA $275,877.50 Sylmar, CA $268,386.25 Torrance, CA $298,893.00 Calabasas, CA $339,524.27 Irwindale, CA $381,032.75 Valencia, CA $316,058.25 Oxnard, CA $344,213.00 Santa Paula, CA $474,035.50