Loading...
HomeMy WebLinkAbout2007-05-22 - AGENDA REPORTS - SLURRY SEAL CONTR M0052 (2)CONSENT CALENDAR Agenda Item: CITY OF SANTA CLARITA AGENDA REPORT Curtis Nay City Manager Approval: Item to be presented by: DATE: May 22, 2007 SUBJECT: 2006-2007 ANNUAL OVERLAY AND SLURRY SEAL PROGRAM, PROJECT NO. M0052 - AWARD CONSTRUCTION CONTRACT DEPARTMENT: Public Works RECOMMENDED ACTION 1. City Council approve the plans and specifications; and award the construction contract for the 2006-2007 Annual Overlay and Slurry Seal Program, Project No. M0052, to Excel Paving Company in the amount of $5,252,637.00, and authorize a 10 percent contingency in the amount of $525,264.00; 2. Approve the expenditure of $85,883.00 from Account No. M0052001-8001 for construction management services; 3. Approve the transfer of $500,000.00 from the 2005-2006 Overlay Program Account No. M0046001-8001 to the 2006-2007 Overlay Program Account No. M0052001-8001; and 4. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND The Annual Overlay and Slurry Seal project is an integral part of the City's pavement management program. Each year, streets are evaluated and identified for the need for asphalt overlay and slurry seal maintenance treatments. The overlay portion of the project will resurface streets in various areas of the City (see attached list of streets). This will provide a smoother ride for traffic, enhance the appearance of the roadway and surrounding area, and extend the life of the roadway. APP'0 !all Slung seal involves the surface preparation and application of emulsion slurry seal to seal cracks, enhance skid -resistance properties, and also increase pavement life. The streets to be included in this program are located throughout the City. To ensure efficient and proper procedures in construction and material testing, a part-time inspector may from time to time need to be assigned to the project. Costs for construction inspection services and material testing were anticipated and identified in the original budget. Pavement Engineering, Inc. has extensive experience in construction management and inspection. Pavement Engineering, Inc. will be responsible for the material testing and part time inspection of the project. Construction is estimated to be complete in 75 working days from the start of the project. Staff recommends adding construction inspection and material testing services for this project to the contract with Pavement Engineering, Inc. in an amount of $85,883.00. Staff has identified savings from the Fiscal Year 2005-2006 Annual Overlay and Slurry Seal Project Account No. M0046001 in the amount of $500,000.00, and requests that these funds are transferred to the 2006-2007 Annual Overlay and Slurry Seal Project Account No. M0052001. On May 9, 2007, the City's Purchasing Division received the following bids for the project: Company Excel Paving Company Sully -Miller Contracting Security Paving Company Granite Construction Co. Location Long Beach, Ca Anaheim, CA Sun Valley, CA Watsonville, CA Bid Amount $5,252,637.00 $5978%406.41 $5,537,634.10 $6,304,015.00 The Engineer's Estimate for the construction of this project is $6.1 million. The lowest bid was submitted by Excel paving Company in the amount of $5,252,637.00. After reviewing the bid summary, staff verified the apparent low bidder's contractor's license, surety companies, and project references. Based on the investigation, staff recommends awarding the construction contract to Excel Paving Company, Inc., the lowest responsive bidder, in the amount of $5,252,637.00. As part of the annual street maintenance project, the City also updates the Pavement Management System (PMS) with any additional streets that need to be added to show the increase in maintained lane miles within the City. Streets accepted by the City in 2007 have added 42 lane miles to the system. The City is now responsible for the maintenance of a total of 933 lane miles. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT The following funds are currently available in the following accounts: General Fund M0052001-8001 $4,5009000.00 Gas Tax M0052201-8001 $1,050,000.00 Prop. C M0052205-8001 $500,000.00 Developer Fund M0052455-8001 $950,000.00 TOTAL $7,000,000.00 Staff recommends the additional requested transfer of $500,000.00 from Account No. M0046001-8001 to Account No. M0052001-8001. This will increase the total available project budget to $7,500,000.00, which will adequately provide for anticipated project costs, including construction, inspection, testing, and labor compliance costs. ATTACHMENTS Overlay - List of Streets City of Santa Clarita Annual Street Resurfacing Program FY 06-07 Annual Street Resurfacing Project Rubberized Asphalt Street List Overlay Streets Street Name Limits Avenue Tibbits Newhall Ranch Road to End Arroyo Park Drive Cortina Drive to McBean Parkway Del Monte Drive/El Paseo McBean Parkway/Bl Paseo to Del Monte/El Paseo Rainbow Glen Drive Soledad Canyon Road to Gilbert Drive Shangri-La Drive Soledad Canyon Road to Nathan Hill Road Sand Canyon Road Soledad Canyon Road to Placerita Canyon Road Wiley Canyon Road Orchard Village Road to Via Pacifica 8ffi Street Parkview Drive to Cross Street Parkview Drive 8 h Street to End