2008-09 ANNUAL OVERLAY AND SLURRY SEAL PROGRAM,
PROJECT M0063 - AWARD DESIGN CONTRACT
Public Works
RECOMMENDED ACTION
City Council award the contract for engineering design services to Pavement Engineering Inc.
for the 2008-09 Annual Overlay and Slurry Seal Program, Project M0063 in the amount of
$244,624 plus a $24,462 contingency expenditure for a total not to exceed $269,086.
2. Authorize the City Manager or designee to execute all documents, subject to City Attorney
approval.
BACKGROUND
The Annual Overlay and Slurry Seal Program is an integral part of the City's pavement
management program and operates on a five- to seven-year cycle. Each year streets are studied to
identify the need for overlay or slurry. Streets are selected using the City Pavement Index Map,
street surveys, and input from the public.
The Annual Overlay and Slurry Seal Program improves various streets Citywide by resurfacing
and sealing surface cracks to enhance skid resistant properties and increase pavement life. This
results in a smoother ride for traffic, an enhanced appearance of the area, and extends the
economic life of the roadway.
Staff prepared a Request for Proposal (RFP) for the subject project. Included in the RFP was the
requirement to design the necessary improvements and evaluate streets in need of improvement.
l
The RFP was sent to firms on the City's Design Consultants List. Four firms submitted
proposals:
Company
Flowers & Associates
MNS Engineers
Tetra Tech, Inc
Pavement Engineering Inc
Location
Santa Barbara, CA
Santa Barbara, CA
Pasadena, CA
,San Luis Obispo, CA
Based on technical qualifications and methodology for the project, Pavement Engineering Inc. is
the recommended firm.
ALTERNATIVE ACTIONS
Other action as determined by the City Council.
FISCAL IMPACT
Funds to cover the design and construction costs of the 2008-09 Overlay and Slurry Seal
Program, Project M0063 have been budgeted in Account M0063601 for Fiscal Year 2008-09.