HomeMy WebLinkAbout2008-05-27 - AGENDA REPORTS - ANNUAL OVERLAY SLURRY M0055 (2)CONSENT CALENDAR
DATE:
SUBJECT:
DEPARTMENT
Agenda Item:
CITY OF SANTA CLARITA
AGENDA REPORT
City Manager Approval:
Item to be presented by:
May 27, 2008
Curtis Nay
2007-08 ANNUAL OVERLAY AND SLURRY SEAL PROGRAM,
PROJECT M0055 - AWARD CONSTRUCTION CONTRACT
Public Works
RECOMMENDED ACTION
1. City Council approve the plans and specifications for the 2007-08 Annual Overlay and Slurry
Seal Program, Project M0055, and award the construction contract to Sylvia Construction in
an amount not to exceed $6,860,244.
2. Award the construction management and material testing services contract to Pavement
Engineering Incorporated in an amount not to exceed $300,000.
3. Authorize a one-time increase not to exceed $20,000 to the Labor Compliance Services
existing professional services contract.
4. Authorize the use of Proposition 113 (Transportation Bond) Local Streets and Roads account
funds in the amount of $2,849,466 upon allocation by the State of California Department of
Finance.
5. Decrease Expenditure Account M0055260-5161.001 (Prop C) by $1,800,000 and increase
Expenditure Account M0055233-5161.001 (TDA Article 8) by $1,800,000.
6. Decrease Expenditure Account M0055601-5161.001 (General Fund Capital) by $2,950,056
and decrease Expenditure Account M0052601-5161.001 (General Fund Capital) by $49,466.
Increase Expenditure Account M0055230-5161.001 (Prop 1 B) by $1,325,804 and increase
Expenditure Account M0055233-5161.001 (TDA Article 8) by $1,673,718.
7. Authorize the City Manager or designee to execute all documents, subject to City Attorney
approval.
APPROVEN
BACKGROUND
The Annual Overlay and Slurry Seal project is an integral part of the City's pavement
management program. Each year, streets are evaluated and identified for the need for asphalt
overlay and slurry seal maintenance treatments. The overlay portion of the project will resurface
streets in various areas of the City (see attached list of streets). This will provide a smoother ride
for traffic, enhance the appearance of the roadway and surrounding area, and extend the life of
the roadway a minimum of 15 years.
Slurry seal involves the surface preparation and application of emulsion slurry seal to seal cracks,
enhance skid -resistance properties, and increase pavement life by a minimum of 7 years. The
streets to be included in this program are located throughout the City. This year's project is
expected to begin construction mid-June 2008, and the completion date is projected for the end
of September 2008. Construction is estimated to be complete in 75 working days from the start
of the project.
To ensure efficient and proper procedures in construction and material testing, additional
inspectors may from time to time need to be assigned to the project. Costs for construction
inspection services and material testing were anticipated and identified in the original budget.
Staff recommends adding construction inspection and material testing services for this project to
the contract with Pavement Engineering in an amount not to exceed $300,000. Pavement
Engineering has extensive experience in construction management and inspection and will be
responsible for the material testing and inspection of the project.
Funds to address the City's overlay and slurry program were previously identified as indicated in
the Fiscal Impact section below. The recommended changes in funding sources are intended to
make better use of funding sources that have become available and offer greater program
flexibility.
On May 12, 2008, the City's Purchasing Division received the following bids for the project:
Company
Silvia Construction
Security Paving Co., Inc.
Nye & Nelson, Inc.
Palp Inc., Excel Paving Co.
Sully -Miller
Granite Construction Co.
Location Bid Amount
Rancho Cucamonga $5,373,726.49
Sun Valley
$5,383,470.24
Ventura
$5,395,505.23
Long Beach
$5,415,978.15
Anaheim
$5,426,821.75
Watsonville
$5,928,666.00
The Engineer's Estimate for the construction of this project is $6,200,000. The lowest bid was
submitted by Sylvia Construction in the amount of $5,373,726.49. After reviewing the bid
summary, staff verified the apparent low bidder's contractor's license, surety companies, and
project references.
As part of the annual street maintenance project, the City also updates the Pavement
Management System with any additional streets that need to be added to show the increase in
maintained lane miles within the City. Streets accepted by the City in 2008 have added 17 -lane
miles to the system. The City is now responsible for the maintenance of a total of 950 -lane miles.
ALTERNATIVE ACTIONS
Other action as determined by the City Council.
FISCAL IMPACT
The following funds are currently available in the following accounts:
General Fund
M0055601-5161.001
$2,950,056
Gas Tax
M0055230-5161.001
$490,026
Proposition 1 B
M0055230-5161.001
$1,523,662
Proposition C
M0055260-5161.001
$1,800,000
General Fund
M0052601-5161.001
$391,500
Proposition C
M0046260-5161.001
$25,000
TOTAL
$7,180,244
Upon approval of the recommended action by the City Council, the funding sources will be:
General Fund M0052601-5161.001 $342,034
Gas Tax M0055230-5161.001 $490,026
Proposition 1B M0055230-5161.001 $2,849,466
Proposition C M0046260-5161.001 $25,000
TDA Article 8 M0055233-5161-001 $3,473,718
TOTAL $7,1 80,244
These funds will adequately provide for anticipated project costs, including construction;
inspection, testing, and labor compliance services.
Staff plans to use Proposition 1 B (Transportation Bond) Local Streets and Roads account funds
for the overlay project only after hinds are allocated by the State of California Department of
Finance.
ATTACHMENTS
Exhibit "A" - List of Locations
EXHIBIT A
07-08 Annual Overlay & Slurry Seal Program
Project M0055 - Locations List
Location
Start Limit
End Limit
OVERLAY
ABAJO DR
151'S OF FESTIVIDAD DR
FESTIVIDAD DR
ALCON DR
FESTIVIDAD DR
205'N OF FESTIVIDAD DR
ATWOOD BLVD
LYONS AVE
POWELL
BALERNA DR
290'S OF ESPUELLA DR
ESPUELLA DR
BERINO DR
311' S OF ESPUELLA DR
ESPUELLA DR
CABALLETA DR
230'S OF ESPUELLA DR
PARAGUAY DR
CAMARGO DR
FESTIVIDAD DR
BOUQUET CANYON RD
CANTOS DR
150'S OF ESPUELLA DR
ESPUELLA DR
CORTINA DR
ALTA MADERA DR
JOHN RUSSELL DR
CUATRO MILPAS ST
FESTIVIDAD DR
GARZOTA DR
DIAZ DR
FESTIVIDAD DR
225'N OF FESTIVIDAD DR
ESPUELLA DR
BOUQUET CANYON RD
CABALLATA DR
ESPUMA DR
FESTIVIDAD DR
190'N OF FESTIVIDAD DR
EVANS AVE
VERMONT DR
WHEELER
EVANS AVE
WILEY CANYON RD
EVERETT DR
EVERETT DR
EVANS AVE
POWELL
FESTIVIDAD DR
LAS MANANITAS DR
BOUQUET CANYON RD
FESTIVIDAD DR
BOUQUET CANYON RD
164'E CAMARGO DR
FOURL RD
LYONS AVE
POWELL
GARZOTA DR
LAS MANANITAS DR
SECO CANYON RD
GAVILAN DR
213'S OF ESPUELLA DR
ESPUELLA DR
JOHN RUSSELL DR
CORTINA DR
ALICANTE DR
LUGAR DE ORO DR
220'S OF FESTIVIDAD DR
CUATRO MILPAS ST
MAGIC MOUNTAIN PKWY
VALENCIA BL
CITRUS ST
MOCHA DR
FESTIVIDAD DR
223'N OF FESTIVIDAD DR
PIEDROS DR
FESTIVIDAD DR
103'N OF FESTIVIDAD DR
PLACERITA CANYON ROAD
SIERRA HIGHWAY
300' EAST OF GATE
POPPY MEADOW ST
OLEANDER CT
WISTARIA VALLEY RD
RIO BUENO CT
LUGAR DE ORO DR
250'E OF LUGAR DE ORO DR
RIO GUSTO CT
LUGAR DE ORO DR
335'E OF LUGAR DE ORO DR
RIO REYES CT
LUGAR DE ORO DR
360'E OF LUGAR DE ORO DR
RIO TAJO CT
LUGAR DE ORO DR
344'E OF LUGAR DE ORO DR
SERVIA DR
FESTIVIDAD DR
177'N OF FESTIVIDAD DR
TREVINO DR
TOURNAMENT RD
VISTA FAIRWAYS
VALENCIA BL
MAGIC MOUNTAIN PY
CITRUS ST
VERMONT DR
LYONS AVE
CONFORM E/O EVANS
MOUNTAIN PARKWAY
INTERSECTION
SLURRY SEAL
AGRAMONTE DR
1206'W OF CROSS ST
CROSS ST
ALAMOS LN
VALLEY ST
528'E OF VALLEY ST
BAKERTON AV
CABRAL ST
CONFORM N/O BOOKHAM
BAKERTON AV
DARTER DR
108'N OF DARTER DR
BASEL ST
FOXLANE DR
TAMBORA DR
BOOKHAM DR
BAKERTON AV
266'E OF BAKERTON AV
CABRAL ST
FOXLANE DR
BAKERTON AV
CEDARTOWN STREET
VALLEY ST
END
CLAYCREST DR
FOXLANE DR
421'E OF FOXLANE DR
COLWYN AV
S END
MAPLE ST
CREST HEIGHTS DR
LINDA VISTA ST
E END
CROSS ST
HASKELL VISTA
8TH ST
CROWN HEIGHTS CT
SUMMIT HILLS DR
N END
CRYSTAL HEIGHTS CT
SUMMIT HILLS DR
N END
DAMAR CT
GOODVALE RD
241'N OF GOODVALE RD
DARTER DR
NADAL ST
102'E OF BAKERTON AV
DAVEY AV
CROSS ST
WILDWOOD CANYON RD
DERIAN DR
CEDARTOWN ST
END
DIAZ DR
FESTIVIDAD DR
PARAGUAY DR
ERMINE ST
FOXLANE DR
HAXTON DR
ESPUELLA DR
CABALLATA DR
485'E OF DIAZ DR
FOXLANE DR
NADAL ST
136'N OF ERMINE ST
GOODVALE RD
FOXLANE DR
DAMAR CT
GREENMILL
HAPPY VALLEY
NORTH END
HAPPY VALLEY
HIGH SPRING
PEACHLAND
HAXTON DR
BASEL ST
ERMINE ST
JANEL AVE
MAPLE ST
N END
LINDA VISTA ST
SIERRA HWY
CANVAS ST
LOGDELL AVE
MIDDLEBANK DR
SOUTH END
LOS TIGRES DR
CABALLETA DR
616'E OF DIAZ DR
MAPLE ST (Possible Overlay)
VALLEY ST
CROSS ST
MEADOW HEIGHTS CT
CREST HEIGHTS DR
N END
MIDDLEBANK DR
CROSS ST
399'E OF LOGDELL AV
NEARVIEW DR
FOXLANE DR
463'E OF FOXLANE DR
PARAGUAY DR
CABALLETA DR
902'E OF DIAZ DR
PEAJAY WAY
CUL-DE-SAC
SIERRA SUNRISE LN
LINDA VISTA ST
E END
SUMMIT HILLS DR
LINDA VISTA ST
E END
TAMBORA DR
BASEL ST
806'N OF BASEL ST
VALLEY ST
870'S OF MAPLE ST
MAPLE ST
WILDWOOD CANYON RD
WILDWOOD RD
DAVEY AV
WILDWOOD RD
CROSS ST
WILDWOOD CANYON RD