Loading...
HomeMy WebLinkAbout2008-05-27 - AGENDA REPORTS - ANNUAL OVERLAY SLURRY M0055 (2)CONSENT CALENDAR DATE: SUBJECT: DEPARTMENT Agenda Item: CITY OF SANTA CLARITA AGENDA REPORT City Manager Approval: Item to be presented by: May 27, 2008 Curtis Nay 2007-08 ANNUAL OVERLAY AND SLURRY SEAL PROGRAM, PROJECT M0055 - AWARD CONSTRUCTION CONTRACT Public Works RECOMMENDED ACTION 1. City Council approve the plans and specifications for the 2007-08 Annual Overlay and Slurry Seal Program, Project M0055, and award the construction contract to Sylvia Construction in an amount not to exceed $6,860,244. 2. Award the construction management and material testing services contract to Pavement Engineering Incorporated in an amount not to exceed $300,000. 3. Authorize a one-time increase not to exceed $20,000 to the Labor Compliance Services existing professional services contract. 4. Authorize the use of Proposition 113 (Transportation Bond) Local Streets and Roads account funds in the amount of $2,849,466 upon allocation by the State of California Department of Finance. 5. Decrease Expenditure Account M0055260-5161.001 (Prop C) by $1,800,000 and increase Expenditure Account M0055233-5161.001 (TDA Article 8) by $1,800,000. 6. Decrease Expenditure Account M0055601-5161.001 (General Fund Capital) by $2,950,056 and decrease Expenditure Account M0052601-5161.001 (General Fund Capital) by $49,466. Increase Expenditure Account M0055230-5161.001 (Prop 1 B) by $1,325,804 and increase Expenditure Account M0055233-5161.001 (TDA Article 8) by $1,673,718. 7. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. APPROVEN BACKGROUND The Annual Overlay and Slurry Seal project is an integral part of the City's pavement management program. Each year, streets are evaluated and identified for the need for asphalt overlay and slurry seal maintenance treatments. The overlay portion of the project will resurface streets in various areas of the City (see attached list of streets). This will provide a smoother ride for traffic, enhance the appearance of the roadway and surrounding area, and extend the life of the roadway a minimum of 15 years. Slurry seal involves the surface preparation and application of emulsion slurry seal to seal cracks, enhance skid -resistance properties, and increase pavement life by a minimum of 7 years. The streets to be included in this program are located throughout the City. This year's project is expected to begin construction mid-June 2008, and the completion date is projected for the end of September 2008. Construction is estimated to be complete in 75 working days from the start of the project. To ensure efficient and proper procedures in construction and material testing, additional inspectors may from time to time need to be assigned to the project. Costs for construction inspection services and material testing were anticipated and identified in the original budget. Staff recommends adding construction inspection and material testing services for this project to the contract with Pavement Engineering in an amount not to exceed $300,000. Pavement Engineering has extensive experience in construction management and inspection and will be responsible for the material testing and inspection of the project. Funds to address the City's overlay and slurry program were previously identified as indicated in the Fiscal Impact section below. The recommended changes in funding sources are intended to make better use of funding sources that have become available and offer greater program flexibility. On May 12, 2008, the City's Purchasing Division received the following bids for the project: Company Silvia Construction Security Paving Co., Inc. Nye & Nelson, Inc. Palp Inc., Excel Paving Co. Sully -Miller Granite Construction Co. Location Bid Amount Rancho Cucamonga $5,373,726.49 Sun Valley $5,383,470.24 Ventura $5,395,505.23 Long Beach $5,415,978.15 Anaheim $5,426,821.75 Watsonville $5,928,666.00 The Engineer's Estimate for the construction of this project is $6,200,000. The lowest bid was submitted by Sylvia Construction in the amount of $5,373,726.49. After reviewing the bid summary, staff verified the apparent low bidder's contractor's license, surety companies, and project references. As part of the annual street maintenance project, the City also updates the Pavement Management System with any additional streets that need to be added to show the increase in maintained lane miles within the City. Streets accepted by the City in 2008 have added 17 -lane miles to the system. The City is now responsible for the maintenance of a total of 950 -lane miles. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT The following funds are currently available in the following accounts: General Fund M0055601-5161.001 $2,950,056 Gas Tax M0055230-5161.001 $490,026 Proposition 1 B M0055230-5161.001 $1,523,662 Proposition C M0055260-5161.001 $1,800,000 General Fund M0052601-5161.001 $391,500 Proposition C M0046260-5161.001 $25,000 TOTAL $7,180,244 Upon approval of the recommended action by the City Council, the funding sources will be: General Fund M0052601-5161.001 $342,034 Gas Tax M0055230-5161.001 $490,026 Proposition 1B M0055230-5161.001 $2,849,466 Proposition C M0046260-5161.001 $25,000 TDA Article 8 M0055233-5161-001 $3,473,718 TOTAL $7,1 80,244 These funds will adequately provide for anticipated project costs, including construction; inspection, testing, and labor compliance services. Staff plans to use Proposition 1 B (Transportation Bond) Local Streets and Roads account funds for the overlay project only after hinds are allocated by the State of California Department of Finance. ATTACHMENTS Exhibit "A" - List of Locations EXHIBIT A 07-08 Annual Overlay & Slurry Seal Program Project M0055 - Locations List Location Start Limit End Limit OVERLAY ABAJO DR 151'S OF FESTIVIDAD DR FESTIVIDAD DR ALCON DR FESTIVIDAD DR 205'N OF FESTIVIDAD DR ATWOOD BLVD LYONS AVE POWELL BALERNA DR 290'S OF ESPUELLA DR ESPUELLA DR BERINO DR 311' S OF ESPUELLA DR ESPUELLA DR CABALLETA DR 230'S OF ESPUELLA DR PARAGUAY DR CAMARGO DR FESTIVIDAD DR BOUQUET CANYON RD CANTOS DR 150'S OF ESPUELLA DR ESPUELLA DR CORTINA DR ALTA MADERA DR JOHN RUSSELL DR CUATRO MILPAS ST FESTIVIDAD DR GARZOTA DR DIAZ DR FESTIVIDAD DR 225'N OF FESTIVIDAD DR ESPUELLA DR BOUQUET CANYON RD CABALLATA DR ESPUMA DR FESTIVIDAD DR 190'N OF FESTIVIDAD DR EVANS AVE VERMONT DR WHEELER EVANS AVE WILEY CANYON RD EVERETT DR EVERETT DR EVANS AVE POWELL FESTIVIDAD DR LAS MANANITAS DR BOUQUET CANYON RD FESTIVIDAD DR BOUQUET CANYON RD 164'E CAMARGO DR FOURL RD LYONS AVE POWELL GARZOTA DR LAS MANANITAS DR SECO CANYON RD GAVILAN DR 213'S OF ESPUELLA DR ESPUELLA DR JOHN RUSSELL DR CORTINA DR ALICANTE DR LUGAR DE ORO DR 220'S OF FESTIVIDAD DR CUATRO MILPAS ST MAGIC MOUNTAIN PKWY VALENCIA BL CITRUS ST MOCHA DR FESTIVIDAD DR 223'N OF FESTIVIDAD DR PIEDROS DR FESTIVIDAD DR 103'N OF FESTIVIDAD DR PLACERITA CANYON ROAD SIERRA HIGHWAY 300' EAST OF GATE POPPY MEADOW ST OLEANDER CT WISTARIA VALLEY RD RIO BUENO CT LUGAR DE ORO DR 250'E OF LUGAR DE ORO DR RIO GUSTO CT LUGAR DE ORO DR 335'E OF LUGAR DE ORO DR RIO REYES CT LUGAR DE ORO DR 360'E OF LUGAR DE ORO DR RIO TAJO CT LUGAR DE ORO DR 344'E OF LUGAR DE ORO DR SERVIA DR FESTIVIDAD DR 177'N OF FESTIVIDAD DR TREVINO DR TOURNAMENT RD VISTA FAIRWAYS VALENCIA BL MAGIC MOUNTAIN PY CITRUS ST VERMONT DR LYONS AVE CONFORM E/O EVANS MOUNTAIN PARKWAY INTERSECTION SLURRY SEAL AGRAMONTE DR 1206'W OF CROSS ST CROSS ST ALAMOS LN VALLEY ST 528'E OF VALLEY ST BAKERTON AV CABRAL ST CONFORM N/O BOOKHAM BAKERTON AV DARTER DR 108'N OF DARTER DR BASEL ST FOXLANE DR TAMBORA DR BOOKHAM DR BAKERTON AV 266'E OF BAKERTON AV CABRAL ST FOXLANE DR BAKERTON AV CEDARTOWN STREET VALLEY ST END CLAYCREST DR FOXLANE DR 421'E OF FOXLANE DR COLWYN AV S END MAPLE ST CREST HEIGHTS DR LINDA VISTA ST E END CROSS ST HASKELL VISTA 8TH ST CROWN HEIGHTS CT SUMMIT HILLS DR N END CRYSTAL HEIGHTS CT SUMMIT HILLS DR N END DAMAR CT GOODVALE RD 241'N OF GOODVALE RD DARTER DR NADAL ST 102'E OF BAKERTON AV DAVEY AV CROSS ST WILDWOOD CANYON RD DERIAN DR CEDARTOWN ST END DIAZ DR FESTIVIDAD DR PARAGUAY DR ERMINE ST FOXLANE DR HAXTON DR ESPUELLA DR CABALLATA DR 485'E OF DIAZ DR FOXLANE DR NADAL ST 136'N OF ERMINE ST GOODVALE RD FOXLANE DR DAMAR CT GREENMILL HAPPY VALLEY NORTH END HAPPY VALLEY HIGH SPRING PEACHLAND HAXTON DR BASEL ST ERMINE ST JANEL AVE MAPLE ST N END LINDA VISTA ST SIERRA HWY CANVAS ST LOGDELL AVE MIDDLEBANK DR SOUTH END LOS TIGRES DR CABALLETA DR 616'E OF DIAZ DR MAPLE ST (Possible Overlay) VALLEY ST CROSS ST MEADOW HEIGHTS CT CREST HEIGHTS DR N END MIDDLEBANK DR CROSS ST 399'E OF LOGDELL AV NEARVIEW DR FOXLANE DR 463'E OF FOXLANE DR PARAGUAY DR CABALLETA DR 902'E OF DIAZ DR PEAJAY WAY CUL-DE-SAC SIERRA SUNRISE LN LINDA VISTA ST E END SUMMIT HILLS DR LINDA VISTA ST E END TAMBORA DR BASEL ST 806'N OF BASEL ST VALLEY ST 870'S OF MAPLE ST MAPLE ST WILDWOOD CANYON RD WILDWOOD RD DAVEY AV WILDWOOD RD CROSS ST WILDWOOD CANYON RD