RECOMMENDED ACTION
1. City Council approve the plans and, specifications for Santa Clarita Sports Complex Phase
IV, Project P3010.
2. Award the construction contract to Valley Crest Landscape, Inc. in the amount of
$6,335,969.77, include add -alternates one to four (1-4) in the amount of $529,827.73, and
authorize a 15 percent contingency in the amount of $1,029,869 for a total contract value of
$7,895,667.50.
Appropriate funds in the amount of $8,320,729 from Facilities Replacement Fund to
Expenditure Account P3010723-5161.001 and authorize the expenditure of $191,062 to
Castaic,Lake Water Agency for water connection fees; authorize contracts for $70,400 to
Hunsaker and Associates for survey services; $32,200 to R.T. Frankian for geological testing
services; $117,000 to DMR Team for construction and special inspection services; $77,400
to Site Design Group, Inc. for skate park construction observation services, and $17,000 for
labor compliance services.
4. Authorize the City Manager, or designee, to execute all documents, subject to City Attorney
approval.
BACKGROUND
The City of Santa Clarita owns approximately 60 acres of a partially developed park site called
the Santa Clarita Sports Complex. The property is located in the central section of the City
within the Centre Pointe Industrial Park. This project will modify portions of the existing Sports
Complex park site and create a new park expansion of approximately 15 acres. Currently, the
ILP $ffil
D
developed portion of the property, which is approximately 22 acres, contains the aquatics center,
a multi-purpose activity center, a gymnasium, and a skate park.
Proposed facilities in Phase IV include a new 40,000 -square -foot skate park facility, shade
structures, a restroom building, a combination basketball/sport court, a multi -use sports field, and
an off -leash dog area. In addition, 275 lighted parking spaces will be added along with
walkways, a pedestrian drop-off and pick-up area, new trash enclosures, and landscape planting.
Bid alternates will include interlocking pavers, irrigated turf for the off -leash dog area, and
colored concrete at the skate park.
The skate park design was developed through numerous public participation meetings held in
2006 and 2007 in the development of the Council -approved Master Plan. The park site is located
near the intersection of Ruether Drive and Centre Pointe Parkway at 20850 Centre Pointe
Parkway.
On March 25, 2008, staff presented the City Council the results of a follow-up public meeting
regarding the down time of the existing skate park and the status of a temporary skate park.
Since then, grading modifications were made resulting in a reduction on the down time of the
existing skate park from six months to three months. The existing skate park will now remain
open until November 15, 2008.
On June 10, 2008, staff met with skate park community representatives to discuss the temporary
skate park elements and to update users on the updated timeline.
On June 5, 2008, the following bids were received by Purchasing:
Contractor
Valley Crest Landscape, Inc. - Cypress, CA
Park West Landscape, Inc. - Pacoima, CA
Armano Gonzales, Inc. - Tarzana, CA
Ohno Construction Company - Fontana, CA
Los Angeles Engineering Inc. - Covina, CA
Pima Corporation - Los Angeles, CA
ALTERNATIVE ACTIONS
Other action as approved by City Council.
FISCAL IMPACT
Total Base Bid Amount
$ 6,335,969.77
$ 7,576,117.00
$ 7,988,144.00
$ 8,208,177.83
$ 8,659,000.01
$ 8,866,438.77
Funding for this project, upon approval of this agenda item, in the total amount of $8,400,729
will be available in the Fiscal Year 2007-08, Capital Improvement Program accounts:
Account Number
P3010723-5161.001
P3010305-5161.001
P3010601-5261.001
Funding Source
Facilities Replacement Fund
Park Development Fees
General Fund
Account Balance
$8,320,729
42,065
37,935
Total: $8,400,729