INTELLIGENT TRANSPORTATION SYSTEM (ITS) PHASE II,
PROJECT I0004 - PROJECT ACCEPTANCE
Public Works
RECOMMENDED ACTION
1. City Council accept the work.performed by TDS Engineering on the ITS Phase II, Project
I0004.
2. Direct the City Clerk to file the attached Notice of Completion.
Direct staff to release the retention 35 days after the Notice of Completion is recorded,
provided no stop notices have been filed, as provided by law.
BACKGROUND
In August 2007, the City executed a Letter of Agreement with Metro after successfully
responding to a Metro Call for Projects to obtain Congestion Mitigation and Air Quality
(CMAQ) funds that were used for the construction of the ITS Phase II project. On August 4,
2008, a Notice to Proceed was issued and construction commenced.
This project built upon the success of the Intelligent Transportation Management System and
Thoroughfare Signal Interconnect projects previously completed by staff in 2006 by adding
critical infrastructure to the City's roadway network. Key elements of infrastructure installed by
this project included, but were not limited to, over three and a half miles of fiber-optic cable, ten
closed-circuit television cameras, video and system detection equipment, and the furnishing of
three changeable message signs for City use. Additionally, installation of computer software in
the Traffic Operations Center allows for integration of the data collected in the field and
dissemination of that data to the public.
A' VED1
With the completion of this project, an improvement of traffic safety by increasing motorists'
awareness of potential hazards on the roadway, as well as reducing traffic demand or congestion
in the vicinity of an incident, will be realized. The operation of the traveler information system
will be shared between the Sheriffs Department and City staff.
Additionally, this project provides redundant communications between the Transit Maintenance
Facility and City Hall, enhancing the existing computer network between the two facilities.
This project was completed within budget and to the satisfaction of the City Engineer on
April 17, 2009.
ALTERNATIVE ACTIONS
Other action as determined by the City Council.
FISCAL IMPACT
Adequate funds for this project were appropriated by the City Council.
ATTACHMENTS
Notice of Completion
RECORDING REQUESTED BY:
City of Santa Clarita
Public Works Department
WHEN RECORDED MAIL TO:
Sharon L. Dawson, MMC, City Clerk
City of Santa Clarita
23920 Valencia Boulevard, Suite 304
Santa Clarita, CA 91355-2196
RECORDING FEES EXEMPTED
G.C. § 6103 and 27383
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN:
The City of Santa Clarita, a municipal corporation, is the owner in fee, except for the right-of-way
upon which it has been constructed, of a certain public improvement known as ITS Phase 11,
Project 10004.
2. The City's address is 23920 Valencia Boulevard, Suite 300, Santa Clarita, California 91355-2196.
The general location of said public improvement is located along several major roadways within the
City of Santa Clarita. These roadways include Valencia Boulevard, Magic Mountain Parkway,
San Fernando Road, Bouquet Canyon Road, Lyons Avenue, Seco Canyon Road, and Soledad Canyon
Road.
4. On July 8, 2009, a contract to construct said public improvement was awarded to TDS Engineering,
1014 S. Westlake Boulevard, Suite. 14-136, Westlake Village, CA 91361.
Work under said contract was completed on April 17, 2009, to the satisfaction of the City Engineer,
and was accepted by the City on May 26, 2009.
Sharon L. Dawson, MMC, City Clerk
City of Santa Clarita
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF SANTA CLARITA )
I have read the foregoing Notice of Completion and know its contents. I am the City Clerk of the City of
Santa Clarita and am authorized to make this verification for and on its behalf, and I make this verification
for that reason. I declare under penalty of perjury under the laws of the State of California that the foregoing
is true and correct and was duly and regularly ordered to be recorded in the office of the Los Angeles County
Recorder.
Sharon L. Dawson, MMC, City Clerk Date
City of Santa Clarita
3