Loading...
HomeMy WebLinkAbout2009-06-09 - AGENDA REPORTS - PROJ M0063 ANNUAL OVERLAY (2)Agenda Item: all,I CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR City Manager Approval: Item to be presented by: Curtis Nay DATE: June 9, 2009 SUBJECT: 2008-09 ANNUAL OVERLAY AND SLURRY SEAL PROGRAM, PROJECT M0063 - AWARD CONSTRUCTION CONTRACT DEPARTMENT: Public Works RECOMMENDED ACTION City Council approve the plans and specifications for the 2008-09 Annual Overlay and Slurry Seal Program, Project M0063, and award the construction contract to Palp Inc., Excel Paving Co. in an amount not to exceed $6,600,000, including contingency. 2. Award the construction management and material testing services contract to Bureau Veritas North America, Inc., in an amount not to exceed $120,000. 3. Authorize the expenditure of up to $75,000 for the annual citywide pavement inspection and the updates for the Pavement Management System. 4. Appropriate $2,633,691 in Proposition 1B (Transportation Bond) Local Streets and Roads Congestion Relief and Traffic Safety funds to Expenditure Account M0063230-5161.001. 5. Authorize the decrease of Expenditure Account M0063601-5161.001 (General Funds) by $386,868 and return to General Fund balance. 6. Authorize the decrease of Expenditure Account M0063230-5161.001 (Gas Tax) by $161,737 and increase Expenditure Account M0063233-5161.001 (TDA Article 8) by $161,737. 7. Authorize the transfer of $140,000 in project savings from the 2007-08 Overlay and Slurry Seal Program Account M0055230-5161.001 to the 2008-09 Overlay and Slurry Seal Program Account M0063230-5161.001. 8. Authorize use of funds in Expenditure Account T2004238-5161.001 for the 16th Street and Newhall Avenue Pedestrian Safety Improvement project. 9. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. APPROWED BACKGROUND The Annual Overlay and Slurry Seal project is an integral part of the City's pavement management program. Each year, streets are evaluated and identified for the need for asphalt overlay and slurry seal maintenance treatments. This year's project will overlay and resurface streets in various areas of the City (see attached project streets list). This will provide a smoother ride for traffic, enhance the appearance of the roadway and surrounding area, and extend the life of the roadway a minimum of 15 years. This year's project is expected to begin construction July 2009, and the completion date is projected for the end of October 2009. An invitation to bid was prepared and published three times: April 24, April 28, and May 3, 2009, and was noticed to the City's website. Plans and specifications were also sent to area plan rooms. Four bids were submitted to the City and opened by Purchasing on May 27, 2009. The results of the bids are shown below. Company Silvia Construction Palp Inc., Excel Paving Co. Granite Construction Co. Toro Enterprises, Inc. T .nr..ntinn Rancho Cucamonga, CA Long Beach, CA Watsonville, CA Oxnard, CA Base Bid Amount $3,456,098.74 $3,750,699.34 $3,853,111.24 $3,894,865.99 The basis for awarding this project is the base bid. After review of the bids, City staff determined that the bid from the first low bidder, Silvia Construction, was incomplete, and therefore deemed non-responsive. Staff recommends awarding the construction contract to the lowest responsive bidder, Palp Inc., Excel Paving Co. who possesses a state contractor's license and is in good standing with the State Contractor's Board. The bid from Palp Inc., Excel Paving -Co. was reviewed for accuracy and conformance to the contract documents, and was found to be complete. The project construction 'award to Palp, Inc., Excel Paving Company is not to exceed the available construction budget of $6,600,000, including contingency. In addition to the scope of work in the base bid, the City may add any of the additive alternates that are part of the bid (see attached Alternates 1 to 6), or other desired work via contract change order up to the available construction budget. Also, part of this available construction budget may be utilized towards the local match that may be required for the two upcoming federally funded American Recovery and Reinvestment Act (ARRA) street overlay projects. To ensure efficient and proper procedures in construction and material testing, costs for construction inspection and material testing services were anticipated and identified in the original budget. A request for proposal (RFP) was sent out to several consultants. Upon reviewing the consultants' proposals, staff recommends awarding the construction management and materials testing services contract to Bureau Veritas North America, Inc., in an amount not to exceed $120,000. The remaining budget will be used for construction management, inspection services, labor compliance services, staff oversight, and miscellaneous project administration costs. 1% The 16th Street and Newhall Avenue Pedestrian Safety Improvement, Project T2004, is incorporated into this project, which will save time and funds by eliminating the need to process this project separately. As part of the annual street maintenance project, the City also inspects the pavement condition citywide and updates the Pavement Management System. Any new streets accepted by the City in 2008 are also added to show the increase in maintained lane miles. Thirteen new lane miles were accepted by the City in 2008. The City is now responsible for the maintenance of a total of 962 -lane miles. Funds to address the City's overlay and slurry program are identified as indicated in the Fiscal Impact section below. The recommended changes are intended to make better use of funding sources that have become available and offer greater program flexibility. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT Project expenditures to date are $370,355. The recommended actions will increase the budget for the 2008-09 Overlay and Slurry Seal Program to $7,376,823, making the following amounts available to proceed with project delivery: Frnnd grmirce General Fund Gas Tax Proposition IB Proposition C TDA Article 8 TDA Article 3 Account Number M0063601-5161.001 M0063230-5161.001 M0063230-5161.001 M0063260-5161.001 M0063233-5161.001 T2004238-5161.001 TOTAL Available Budget $1,376,380 $1,664,737 $2,633,691 $313,526 978,133 40,000 $7,006,467 These funds will adequately provide for anticipated project costs, including construction, inspection, testing, labor compliance services, and project administration and miscellaneous costs. ATTACHMENTS Project Streets List IN CITY OF SANTA CLARITA 2008/2009 Annual Overlay and Slurry Project Base Bid / Alternates Street List Project No. M0063 Bid # ENG -08-09-M0063 PROJECT STREET LISTS BASE BID ARTERIALS & COLLECTORS Street Name From To Total SF 16th Street Orchard Village Road Newhall Avenue 93,120 Rye Canyon Road @ Avenue Stanford , Dalbey Drive 12,950 Newhall Ranch Road Bridge Deck East End 7,625 Rockwell Canyon Road McBean Parkway Valencia Boulevard 311,797 Decoro Drive McBean Parkway Vista Delgado Drive 322,938 Bike Path Golden Oak Road Camp Plenty Bridge 115,550 Soledad Canyon Road @ Commuter Way West End 3,850 Valencia Boulevard (EB) Tourney Road McBean Parkway 183,183 V NEIGHBORHOOD (V - Valencia area) Street Name From To Total SF Avenida Balita Orchard Valley Road Dalbey Drive 49,599 Avenida Ignacio 16th Sreet Dalbey Drive 39,446 Tristin Drive West End East End 19,938 Via Calisero Avenida Balita East End 15,330 Via Elisandra Avenida Ignacio West End 12,857 Via Farallon Avenida Ignacio West End 12,410 Via Gayo Avenida Ignacio West End 12,525 Via Hispano Avenida Ignacio West End 12,006 C2 NEIGHBORHOOD (C - Canyon Country area) Street Name From To Total SF Crystal Springs Court Mountain Pass Road East End 20,989 Goldstream Way Mountain Pass Road East End 48,420 Green Mountain Drive Golden Valley Road W of Mountain Pass Road 48,420 Mountain Pass Road Green Mountain Drive South End 36,902 Oakbar Court Goldstream Way South End 4,878 N2A NEIGHBORHOOD (N - Newhall area) Street Name From To Total SF Adamsboro Drive Fourl Road Brittany Lane 43,274 Canerwell Street Wiley Canyon Road Jena Drive 41,058 Carland Drive Fourl Road East End 8,983 Daisetta Drive Fourl Road Jena Drive 16,203 Darbun Drive Fourl Road East End 11,575 Fain Drive Fambrough Street Canerwell Street 7,178 Fambrough Street Fourl Road East End 70,516 Fourl Road Wiley Canyon Road Daisetta Drive 61,707 Heritage Oak Court White Oak Court East End 12,901 Jena Drive Canerwell Street Daisetta Drive 20,849 Little Oak Lane Adamsboro Drive Brittany Lane 10,427 Valley Oak Court Calgrove Boulevard East End 22,045 White Oak Court Calgrove Boulevard West End 30,602 Page 1 of 2 PROJECT STREET LISTS CONT. S5A NEIGHBORHOOD (S - Saugus area) Street Name From To Total SF Rio Bosque Drive North End Rio Chico Drive 18,038 Rio Bosque Drive Rio Clara Drive South End 13,694 Rio Chico Drive Rio Bosque Drive Rio Pecos Drive 18,918 Rio Clara Drive Rio Pecos Drive Rio Bosque Drive 14,494 Rio Garza Drive Decoro Drive Rio Clara Drive 6,850 Rio Pecos Drive Garzota Drive Rio Clara Drive 57,865 Rio Prado Drive Rio Clara Drive Rio Chico Drive 45,858 ALTERNATE 1 C5A NEIGHBORHOOD (C - Canyon Country area) Street Name From To Total SF Flowerpark Drive Soledad Canyon Road Gardenia Park Drive 61,217 Gardenia Park Drive Flowerpark Drive Lotusgarden Drive 8,436 Gardenia Lane Drive Lotusgarden Drive Gladiolus Drive 7,334 Gladiolus Drive Lotus Garden Drive Nasturtium Drive 73,149 Lotusgarden Drive Nasturtium Drive Gardenia Park Drive 40,136 Melia Way Rhododenron Drive North End 15,430 Nasturtium Drive Flowerpark Drive Gladiolus Drive 17,323 Violet Lane Way Lotus Garden Drive West End 21,110 Rhododendron Drive Snapdragon Place Lotusgarden Drive 41,184 Poppyseed Lane Flowerpark Drive East End 13,635 Street Name From To Total SF Avenue Hopkins Anza Drive Avenue Rockefeller 101,060 ALTERNATE 6 Street Name From To Total SF Avenue Rockefeller Avenue Hopkins Avenue Scott 66,702 Page 2 of 2 S ALTERNATE 2 Street Name From To Total SF Soledad Canyon Road Poppy Meadow Street Shadowpines Boulevard 205,995 ALTERNATE 3 Street Name From To Total SF Langside Avenue Soledad Canyon Road Delight Street 41,294 ALTERNATE 4 Street Name From To Total SF Shangri-La Drive 1140' N of Nathan Hill Drive Nathan Hill Drive 41,616 ALTERNATE 5 Street Name From To Total SF Avenue Hopkins Anza Drive Avenue Rockefeller 101,060 ALTERNATE 6 Street Name From To Total SF Avenue Rockefeller Avenue Hopkins Avenue Scott 66,702 Page 2 of 2 S