Loading...
HomeMy WebLinkAbout2010-07-13 - AGENDA REPORTS - 2009-10 OVERLAY & SLURRY SEAL (2)CONSENT CALENDAR DATE: SUBJECT: DEPARTMENT Agenda Item: 7 CITY OF SANTA CLARITA AGENDA REPORT City Manager Approval Item to be presented by July 13, 2010 Curtis Nay 2009-10 ANNUAL OVERLAY AND SLURRY SEAL PROGRAM, PROJECT M0071 - AWARD CONSTRUCTION CONTRACT Public Works RECOMMENDED ACTION 1. City Council approve the plans and specifications for the 2009-10 Annual Overlay and Slurry Seal Program, Project M0071. 2. Find the bid of Toro Enterprises, Inc., to be non-responsive and award the construction contract to Sully -Miller Contracting Company in an amount not to exceed $1,018,577 including contingency. 3. Authorize an additional expenditure in the amount of $77,000 from Expenditure Account M0071306-5161.001 to Pavement Engineering, Inc., for the annual citywide pavement inspection and the updates for the Pavement Management System. 4. Authorize the continuance of funds in Account M0071230-5161.001 in the amount of $408,838.96 from Fiscal Year 2009-10 to Fiscal Year 2010-11. Authorize the following transfers: $111,972 from the 2010-11 Overlay and Slurry Seal Program Account M0077230-5161.001 to the 2009-10 Overlay and Slurry Seal Program Account M0071230-5161.001; and $709,766 from the 2010-11 Overlay and Slurry Seal Program Account M0077306-5161.001 to the 2009-10 Overlay and Slurry Seal Program Account M0071306-5161.001. 6. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. p PROVED I BACKGROUND The Annual Overlay and Slurry Sea] project is an integral part of the City's pavement management program. Each year, streets are evaluated and identified for the need for asphalt overlay and slurry seal maintenance treatments. The 2009-10 project will overlay and resurface streets in various areas of the City (see attached project streets list). This treatment will provide a smoother ride for traffic, enhance the appearance of the roadway and surrounding area, and extend the life of the roadway for a minimum of 15 years. This year's project is expected to begin construction in August 2010 and be complete by the end of October 2010. Funds requested for the construction of the City's 2009-10 Overlay Program are intended to make better use of federal funding sources that have become available for the City's 2010-11 Overlay Program. To date, approximately $500,000 has been transferred from this project into other capital improvement projects to cover eligible work for street paving. Staff is requesting the transfer of funds from the 2010-11 Overlay Program to make this project budget whole again and to maximize the amount of streets that can be overlaid within the bid amount. This will allow the City to meet the needs of residential neighborhoods this summer, where repeated work requests have been generated. If the requested transfer of funds is not approved, staff will need to readvertise the project with a considerably reduced scope of work, or not perform the work this summer, and carry the existing budget forward to add to next year's project budget. An invitation to bid was prepared, published three times (April 30, May 6, and May 9, 2010), and noticed to the City's Web site. Plans and specifications were also sent to area plan rooms. Seven bids were submitted to the City and opened by Purchasing on May 20, 2010. The results of the bids are shown below: Company Toro Enterprises, Inc. Sully -Miller Contracting Company All American Asphalt Nye & Nelson, Inc. Palp, Inc., DBA Excel Paving Company Silvia Construction, Inc. C.A. Rasmussen, Inc. Location Bid Amount Oxnard, CA $ 886,075.90 Brea, CA $ 925,979.47 Corona, CA $ 945,000.00 Ventura, CA $1,034,236.10 Long Beach, CA $1,056,096.50 Rancho Cucamonga, CA $1,094,579.63 Santa Clarita, CA $1,171,387.40 The basis for awarding this project is the base bid plus any alternates, with a total amount not to exceed the available project budget. Upon review of the bids, City staff determined that the bid from the first low bidder, Toro Enterprises, Inc., was incomplete and therefore, deemed non-responsive. Toro Enterprises, Inc., failed to sign and submit an addendum and their bid schedule was incomplete. Staff recommends finding the bid of Toro Enterprises, Inc., non-responsive and awarding the construction contract to the lowest responsive bidder, Sully -Miller Contracting Company, who possesses a state contractor's license and is in good standing with the State Contractor's Board. The bid from Sully -Miller Contracting Company was reviewed for accuracy and conformance to the contract documents and found to be complete. N As part of the annual street maintenance project, the City also inspects and records the pavement condition citywide. The City is seeking authorization for Pavement Engineering, Inc., to continue its inspection and update the City's Pavement Management System. Ten new lane miles were accepted by the City in 2010 and added to the system. The City is now responsible for the maintenance of a total of 972 lane miles. The remaining $135,000 of the project budget will be used for construction management, materials testing, inspection, survey, labor compliance, staff oversight, and miscellaneous project administration costs. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT The 2009-10 Overlay Program budget balance is $408,838.96. The recommended actions will make available a budget of $1,230,577 for the 2009-10 Overlay Program to adequately provide for all anticipated construction costs. To date, expenditures of $94,500 have been encumbered for design -related services in Fiscal Year 2009-10. ATTACHMENTS Project Street List City of Santa Clarita 2009-10 Annual Overlay and Slurry Seal Program Project M0071 Streets List Street Name Limits (between) Whites Canyon Road Soledad Canyon Road and Bridge Deck Golden Valley Road Green Mountain Road and State Route 14 Overpass Babington Street Silver Star Lane Sand Canyon Frontage Road Cardiff Drive Myrin Place Add Alternates Street Name Camp Plenty Road and cul-de-sac Sand Canyon Road and cul-de-sac Silver Star Lane and cul-de-sac Entire length Pamplico Drive and cul-de-sac Limits (between) Del Monte Drive Starkus Way and Summit Place Fenwall Drive Tula Drive and Pamplico Drive Vista Hills Drive Tournament Road and Cariz Drive