HomeMy WebLinkAbout2010-12-14 - AGENDA REPORTS - FY 10 11 ANNUAL CONCRETE REHAB (2)CONSENT CALENDAR
DATE:
SUBJECT:
DEPARTMENT:
Agenda Item: &
CITY OF SANTA CLARITA
AGENDA REPORT
City Manager Approval
Item to be presented by:
December 14, 2010
Curtis Nay
FISCAL YEAR 2010-11 ANNUAL CONCRETE
REHABILITATION PROGRAM (CITYWIDE), PROJECTS M0078,
M0079, AND T0033 - AWARD CONSTRUCTION CONTRACT
Public Works
RECOMMENDED ACTION
1. City Council approve the plans and specifications for the Fiscal Year 2010-11 Annual
Concrete Rehabilitation Program (citywide), Projects M0078, M0079, and T0033.
2. Award the construction contract to the lowest responsible bidder, FS Construction, in the
amount of $350,862, and authorize a contingency in the amount of $103,138, for a total
contract amount not to exceed $454,000.
Authorize the City Manager or designee to execute all documents, subject to City Attorney
approval.
BACKGROUND
The annual concrete rehabilitation program consists of three annual efforts that are awarded
under one contract to make the most efficient use of available funding. The sidewalk repair
program will construct new wheelchair ramps and replace existing damaged sidewalk. The curb
and gutter program will improve the drainage flow into local stormdrains, thereby improving
stormwater quality and eliminating ponding water, and the access ramp program will serve our
disabled community through the installation of new access ramps, while meeting the
requirements outlined in Title 21 of the Americans Disabilities Act. In addition to these
programs, repairs are required to the concrete pathways along the City's paseos.
The attached list of locations was generated by residents' requests to the Public Works
Department and the City Manager's Office or were areas identified by staff as needing
restoration.
IAFPRO ED
Substantial constraints and controls have been established in the construction documents to
reduce potential impacts on local traffic and to homeowners during the construction phase.
Construction is scheduled to begin January 2011 and is anticipated to be complete within
90 working days following the Notice to Proceed. Staff will appoint inspectors to ensure proper
work performance by the contractor and to handle daily field issues.
An invitation to bid was published three times (October 4, October 7, and October 10, 2010), and
noticed to the City's Web site. Plans and specifications were also sent to area plan rooms. Seven
responsive bids were submitted to the City and opened by Purchasing on November 9, 2010. The
results are shown below:
Company
FS Construction
Toro Enterprises, Inc.
Black Rock Construction
R.C. Becker & Son, Inc.
Kalban, Inc.
Berry General Engineering Contractors, Inc.
C.A. Rasmussen, Inc.
Location
Amount
Sylmar, CA
$350,862
Oxnard, CA
$396,931
Brea, CA
$427,425
Santa Clarita, CA
$435,222
Sun Valley, CA
$489,116
Ventura, CA
$658,141
Santa Clarita, CA
$678,585
The lowest responsive bid was submitted by FS Construction in the amount of $350,862. Staff
recommends that the project be awarded to FS Construction, the lowest responsible bidder. This
contractor possesses a valid state contractor's license and is in good standing with the Contractors
State License Board. The contractor's bid has been reviewed for accuracy and conformance to the
contract documents and was found to be complete.
Added work, including new curb ramps, curb and gutter repairs, and sidewalk maintenance at
various locations throughout the City based on each program's prioritized list, will be performed
for a maximum contract amount of $454,000. The remaining funds will be utilized for project
administration and support items such as tree trimming, labor compliance, surveying, and
material testing.
While the City maintains a Support of Local Businesses policy that can be utilized by the City
Council when warranted, the City is governed by the California Public Contract Code with
regard to public works project procurement. In these types of procurement, the California Public
Contract Code does not permit a City to utilize a Support of Local Businesses policy and instead
requires the contract be awarded to the lowest responsible bidder. As confirmed by the City
Attorney's Office, this direction precludes the City from applying any superseding criteria for
award except in the case of a tie. In other words, in awarding of Public Works contracts, the City
is not permitted to award to a bidder just because they are local, as the California Public Contract
Code does not allow the City to recognize them as the "lowest" responsible bidder.
ALTERNATIVE ACTIONS
Other action as determined by the City Council.
C;
FISCAL IMPACT
Funds have been appropriated into the following accounts for Fiscal Year 2010-11:
Project
Sidewalk Repair Program
Sidewalk Repair Program
LMD Sidewalk Repair Program
Sidewalk Repair Program
Stormwater Flowline Repair
Access Ramp Construction
Account Amount
M0078238-5161.001 $ 8,955
M0078230-5161.001 $251,045
M0078357-5161.001 $100,000
M0078233-5161.001 $ 40,000
M0079356-5161.001 $ 75,000
T0033233-5161.001 $ 50,000
Total $525,000
These funds will adequately provide for anticipated construction costs.
ATTACHMENTS
List of Locations
LIST OF LOCATIONS
FISCAL YEAR 2010-11
ANNUAL CONCRETE REHABILITATION PROGRAM
PROJECTS M0078, M0079, AND T0033
Aguadero Place
Goodvale Road
T-7 Central North Valley
Alamogordo Road
Grano Avenue
T-8 Valencia Summit Park
Alberto Court
Guadilamar Drive
Terri Drive
Arriba Drive
Hardesty Avenue
Tula Drive
Arriola Avenue
Hazel Street
Via Amado
Ashboro Drive/Steinway Street
Keaton Street
Via Andorra
Avenida Ronada
La Rochelle Drive
Via Barra
Avenida Rondel
La Vita Court
Via Beguine
Avenida Rotella
Littlefield Drive
Via Boscana
Bakerton Avenue
Los Rogues Drive
Via Calinda
Barbacoa Drive
Via Maduro
Via Castanet
Barada Avenue
McBean Parkway
Via Chantilly
Bouquet Canyon Road
Meadowcreek Road
Via Corsa
Calvello Drive
Nashua Way
Via Danza
Camp Plenty Road
Newhouse Street
Via Decano
Canerwell Street
Northbrook Avenue
Via Delos
Canso Lane
Olivas Park Road
Via Ebano
Cardiff Drive
Orchard Village Road
Via Elisandra
Carrizo Drive
Pamplico Drive
Via Eliso
Catala Avenue
Plaza Larios
Via Farol
Chimney Rock Road
Quilla Road
Via Fuente
Comet Way
Railroad Avenue
Via Galera
Condor Ridge Road
Rana Drive
Via Marcia
Coral Way
Santa Clarita Road
Via Nautica
Corry Place
Seco Canyon Road
Via Oriol
Daisetta Drive
Snowy Owl Court
Via Pacifica
Empino Lane
Steinway Street
Via Rana
Enderly Street
Stillmore Street
Via Sistine
Ermine Street
Susan Beth Way
Via Tanara
Esterbrook Avenue
T-2 Old Orchard
Via Tomas
Fambrough Street
T-4 Valencia Meadows
Via Valentina
Florence Lane
T42 Circle J Ranch
Viejo Court
Fourl Road
T-5 Valencia Glen