RECOMMENDED ACTION
1. City Council accept the completion of the Cross Valley Connector Golden Valley Road
Bridge Over the Santa Clara River, Project S4013.
2. Direct the City Clerk to file the attached Notice of Completion.
3. Direct staff to release the retention 35 days after the Notice of Completion is recorded,
provided no stop notices have been filed, as provided by law.
4. Authorize payment in the amount of $300,000 from Expenditure Account
S4013229-5161.001 to Newhall Land as reimbursement for work completed to expedite the
proj ect.
5. Adopt a resolution consenting to a loan of $2,000,000 from Bouquet Canyon Second Access
Bridge and Thoroughfare (B&T) Fund to the Bouquet Canyon Bridge and Thoroughfare
(B&T) District.
6. Authorize the appropriation of $29,304 from Landscape Maintenance District (LMD) Fund
Balance 354 to Expenditure Account S4013354-5161.001.
7. Authorize the City Manager or designee to execute all documents, subject to City Attorney
approval.
BACKGROUND
On December 9, 2008, the City Council awarded the construction contract to C.C. Myers, Inc., to
construct the Golden Valley Road Bridge Over the Santa Clara River (GVR Bridge). This project
is a vital link of the Cross Valley Connector (CVC), which provides a direct connection between
Interstate 5 (I-5) and State Route 14 (SR -14). The GVR Bridge consists of two 1,100 feet long
northbound and southbound bridges. Both bridges have three lanes with a Class I trail on the
southbound bridge.
One of the City's main goals of the GVR Bridge was to complete the remaining gap in the CVC
to provide a roadway connection between I-5 and SR -14. The incomplete section of the CVC was
made up of the City's GVR Bridge project and the section of Newhall Ranch Road from Santa
Clarita Parkway to the bridge being completed by Newhall Land. The close proximity of the two
projects required close coordination between the City and Newhall Land.
In order to expedite the completion of both projects, paving work was removed from the City's
contract and performed by the developer. A payment in the amount of $300,000 reimburses
Newhall Land for the cost of this work.
On December 9, 2008, the City Council appropriated $2,000,000 in Bouquet Canyon Second
Access B&T Funds to the project. As the GVR Bridge is located in the Bouquet Canyon B&T
District, staff recommends approving a loan from the Bouquet Canyon Second Access B&T
Fund to the Bouquet Canyon B&T District in this amount. The loan will be repaid at a future date
when funds in the amount of $2,000,000 are available in the Bouquet Canyon B&T District.
Additionally, an appropriation of $29,304 from the LMD Fund Balance 354 is being requested to
cover the cost of the landscape median improvements added to the project scope.
Final determination of expenditures eligible for federal reimbursement is pending the results of a
Caltrans review of the closeout package. The closeout package cannot be submitted to Caltrans
for review until the project has been accepted by the City Council. Staff anticipates full
reimbursement of all federal funds available; however, should the City not receive the full federal
reimbursement amount, Bouquet Canyon B &T District funding is available.
The Golden Valley Road Bridge Over the Santa Clara River, Project 54013, was completed to
the satisfaction of the City Engineer on July 9, 2010.
ALTERNATIVE ACTIONS
Other action as determined by the City Council.
FISCAL IMPACT
The resolution to correct the funding source does not increase the previously approved
construction budget. Adequate funding is currently appropriated in the project expenditure
accounts.
The appropriation of LMD Funds provides for the change order work to construct a landscaped
median.
M
ATTACHMENTS
Resolution
Notice of Completion
Location Map
I
RESOLUTION 10-
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF SANTA CLARITA, CALIFORNIA, APPROVING A
LOAN FROM THE BOUQUET CANYON SECOND ACCESS BRIDGE AND
THOROUGHFARE FUND TO THE BOUQUET CANYON BRIDGE AND
THOROUGHFARE DISTRICT IN THE AMOUNT OF $2,000,000
WHEREAS, the Golden Valley Road Bridge Over the Santa Clara River, Project
S4013, is the final segment of new roadway construction to complete the construction of the
Cross Valley Connector east -west corridor; and
WHEREAS, the City successfully secured significant federal funds to construct the
roadway reducing the City's need to utilize local funds; and
WHEREAS, the federal earmark from the Transportation, Treasury, Independent
Agencies, and General Government Appropriations Act 2005, National Corridor Planning and
Border Development Program, allocated $4,725,000 towards the project; and
WHEREAS, the requirement to secure these funds was to obtain a Notice of
Authorization to Proceed by September 30, 2008, created a need to accelerate funding the
proj ect; and
WHEREAS, Bouquet Canyon Second Access Bridge and Thoroughfare (B&T)
Funds in the amount of $2,000,000 were identified as eligible and available to use for the
roadway construction; and
WHEREAS, the Bouquet Canyon Second Access B&T Funds have since been
deemed ineligible for construction of the roadway; and
WHEREAS, the funds have been used for construction of the Golden Valley Road
Bridge over the Santa Clara River; and
WHEREAS, adequate funding in the Bouquet Canyon B&T District to fund the
expenditures is not currently available; the Bouquet Canyon Second Access B&T Funds will loan
the sum of $2,000,000 to the Bouquet Canyon B&T District.
NOW, THEREFORE, the City Council of the City of Santa Clarita does hereby
resolve as follows:
SECTION 1. It is agreed that $2,000,000 from the Bouquet Canyon Second Access
B&T Funds will be loaned to the Bouquet Canyon B&T District.
SECTION 2. The loan will be repaid at a future date when funds in the amount of
$2,000,000 are available in the Bouquet Canyon B&T District.
SECTION 3. The loan will be paid back at an interest rate equivalent to the yield of
the average monthly investment portfolio.
SECTION 4. The City Clerk shall certify to the adoption of this Resolution.
PASSED, APPROVED, AND ADOPTED this day of 2010.
ATTEST:
CITY CLERK
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF SANTA CLARITA )
1, Sarah P. Gorman, City Clerk of the City of Santa Clarita, do hereby certify that the
foregoing Resolution was duly adopted by the City Council of the City of Santa Clarita at a
regular meeting thereof, held on the day of 2010, by the following vote:
AYES: COUNCILMEMBERS:
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
2
CITY CLERK
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF SANTA CLARITA )
CERTIFICATION OF
CITY COUNCIL RESOLUTION
I, , City Clerk of the City of Santa Clarita, do hereby
certify that this is a true and correct copy of the original Resolution 10- adopted by the City
Council of the City of Santa Clarita, California on , 2010, which is now on file in my
office.
Witness my hand and seal of the City of Santa Clarita, California, this day of
2010.
City Clerk
By
Deputy City Clerk
RECORDING REQUESTED BY:
City of Santa Clarita
Public Works Department
WHEN RECORDED MAIL TO:
Sarah P. Gorman, Esquire, City Clerk
City of Santa Clarita
23920 Valencia Boulevard, Suite 304
Santa Clarita, CA 91355-2196
RECORDING FEES EXEMPTED
G.C. § 6103 and 27383
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN:
The City of Santa Clarita, a municipal corporation, is the owner in fee, except for the right-of-way
upon which it has been constructed, of a certain public improvement known as Cross Valley Connector
Golden Valley Road Bridge Over the Santa Clara River, Project S4013.
2. The City's address is 23920 Valencia Boulevard,. Suite 300, Santa Clarita, California 91355-2196.
The general locations of said public improvements is east of the intersection of Newhall Ranch Road
and Golden Valley Road and north of the intersection of Golden Valley Road and Valley Center Drive.
4. On December 9, 2008, a contract to construct said public improvement was awarded to C.C. Myers,
Inc., 3286 Fitzgerald Road, Rancho Cordova, CA 95742.
Work under said contract was completed on July 9, 2010, to the satisfaction of the City Engineer, and
was accepted by the City on November 23, 2010.
Sarah P. Gorman, Esquire, City Clerk
City of Santa Clarita
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF SANTA CLARITA )
I have read the foregoing Notice of Completion and know its contents. I am the City Clerk of the City of
Santa Clarita and am authorized to make this verification for and on its behalf, and I make this verification
for that reason. I declare under penalty of perjury under the laws of the State of California that the foregoing
is true and correct and was duly and regularly ordered to be recorded in the office of the Los Angeles County
Recorder.
Sarah P. Gorman, Esquire, City Clerk Date
City of Santa Clarita
L A N
m d n cg 7
L • fff '�' c
> r -- — -- — -- — N,,
p p
r
}� ,t n a m
g
�
IT
. a1-01
d 0�3
G t
[{ iG
ui,+ft?1 r
Y �
r _ yglggy41,
r
a W
a a �
.l IL
ZY i
Y
2 r r--
n ( W to r X,
Fn
:max cy g' .x W <?
m l Y 3c J OCO
lGhNt
AP
�,, r—••_� ! ° -_: -, -a%+k, r iii s y ._,� .'t'tEE� I f
G
T >r
�lOy.f 1 Ve - fwlr v4 yid vAF cCf f r
,y
z 4 'A�aZ}: f.� '�%•�i
vi
zc,
It