HomeMy WebLinkAbout2010-05-11 - AGENDA REPORTS - SAFE ROUTES TO SCHOOL (2)CONSENT CALENDAR
DATE:
SUBJECT:
DEPARTMENT
Agenda Item
CITY OF SANTA CLARITA
AGENDA REPORT
City Manager Approval:
Item to be presented by
May 11, 2010
Curtis Nay
10
SAFE ROUTES TO SCHOOL INFRASTRUCTURE, PROJECT
T0030 - AWARD CONSTRUCTION CONTRACT AND
CONSTRUCTION SUPPORT CONTRACTS
Public Works
RECOMMENDED ACTION
1. City Council approve the plans and specifications for the Safe Routes to School
•Infrastructure, Project T0030.
2. Find the bid of Pivot Group, Inc., to be non-responsive and award the construction contract to
R.C. Becker & Son, Inc., in the amount of $328,222, plus a 20 percent contingency in the
amount of $65,644, for a total not to exceed $393,866.
Award the quality assurance construction materials and inspection services contract to Fugro
West, Inc., in the amount of $14,000.
4. Authorize an additional expenditure in the amount of $40,000 from Expenditure Account
T0030229-5161.001 for independent quality assurance services, labor compliance services,
staff oversight, construction engineering, survey, inspection, and miscellaneous project
administration costs.
Authorize the City Manager or designee to execute all documents, subject to City Attorney
approval.
FIX= XCIM • 00
The Safe Routes to School Infrastructure project consists of the construction of physical
improvements at crossings near Mitchell Elementary School, Rosedell Elementary School, and
Peachland Elementary School. The goal of this project is to enhance students' safety by reducing
GPPROVED
the speed of vehicles near school grounds and increasing the visibility of school crossings. The
improvements will also allow students to safely walk and bike to school. This project received
support from the selected schools.
Work under this project includes restriping crosswalks, replacing existing signage with oversized
fluorescent yellow -green signage, widening sidewalks, and constructing bulb -outs at selected
school crossings. Bulb -outs are traffic -calming features that narrow the street by widening the
sidewalk at crossings, thereby reducing traffic speeds and shortening the crossing distance.
This project is federally funded under the Safe Routes to School Program. On February 30, 2010,
the City received authorization from the California Department of Transportation to proceed with
a call for bids and construction.
The City issued a Notice Inviting Bids on March 18, 2010. On April 20, 2010, the City's
Purchasing Division received the following bids for the project:
Company
Pivot Group, Inc.
R.C. Becker & Son, Inc.
C.A. Rasmussen
Southland Construction
Berry General Engineering
Chaperral Construction
Location Bid Amount
Burbank, CA
$312,595.90
Santa Clarita, CA
$328,222.00
Santa Clarita, CA
$358,476.90
Long Beach, CA
$366,141.00
Ventura, CA
$384,258.00
Oxnard, CA
$392,885.00
After review of the bids, City staff determined that the bid proposal submitted by the apparent
low bidder Pivot Group, Inc., was incomplete due to failure to submit signed Addendum 1 as
required by the contract documents. Therefore, the bid was deemed non-responsive. The lowest
responsive bid was submitted by R.C. Becker & Son, Inc., in the amount of $328,222.
Staff recommends the project be awarded to R.C. Becker & Son, Inc. This contractor possesses a
valid state contractor's license and is in good standing with the State Contractor's License Board.
A Request for Proposal for quality assurance construction material testing and inspection
services was sent to qualified consultants. The selection criteria for award of this contract
included laboratory certification by Caltrans, ability to meet project timelines, and proper
understanding of the required scope of work. Based on this selection criteria, staff selected Fugro
West, Inc., located in Santa Clarita, California, as the most qualified consultant for this project.
Adequate funds have been budgeted to provide for independent quality assurance services, labor
compliance services, staff oversight, construction engineering, survey, inspection, and
miscellaneous project administration costs.
ALTERNATIVE ACTIONS
Other action as determined by the City Council.
IN
FISCAL IMPACT
Adequate grant funds are available and appropriated in Expenditure Account
T0030229-5161.001. This .project is 100 percent funded by the Safe Routes to School Grant
Program.
ATTACHMENTS
Location Map - Mitchell Elementary School
Location Map - Peachland Elementary School
Location Map - Rosedell Elementary School
R
MitcheIltommun
R..
z
U
1A VEDAg1 10.41
y
O
to gUR
� m,�'i �i � gQ ��r✓H1GH x�" � � T tea.
Of,
s �fl 1v t q,
q r
lit
a: � w V� ` SANTA CLARITA
¢:a + Mitchell Community
W Wo ' School
SARITA.AV� Legend 0 N0 740
# Mitchell Community School Pamel data' Copyngrd j—Y 2010, Feat
O " Building footprints CamtydILmA jNaa.Alingmamem ,
' Map mp—ImW w h perm we gmmad
LOSTCANYON Parcel outlines byTI— Sm. Maps (Capyrgh12009).
Qr1� r City boundary Tlr Clly of san a as !a does nd wxmnl
GPa�I. m;N,«Rro�a 6m�aa
` Water
Sq p } &Up peeprod by' Cb d Saha Clema
�Q.Dl
GIs 0114
—
smog
HAPPY VALLEY DR
,n L
va-I
ME,
MKIIIE
h"
LYONS AV
,n L
va-I
ME,
MKIIIE
h"
KNOLLS PL
HEATHER
SANTA CZAR ITA
Peachland Elementary
School
N
L.Ipnd
a zoo mo
2Z P arhland Elementary School
0 P:.Iouflines
P-1 data Copynght January 2010.
C.Laty of Ua An"., AJI nghl. .1—ed
W Building footprints
City boundary
Map rap�ad � W—.— gra-d
bYTWnaaB= Maps(CopyngInI2009),
The Cly of San% Clanta does W —ant
ft a—my of lee dam and — no
latifity fo, any anon, or —ons.
Map mPa,adby ckyofSena palm
GIS DnA.-
I- — j , :v —
�BWHI�'I'E
G
YVONNE AV
IIEI
r]
14, � #
4001 �►
9
"""SANTA CLARM
Rosedell Elementary
School
=- N
Legend
Fae�
:j City boundary F-mMde :Cop"NJ—Y2010.
CaWyofl Angeee.Allrgh92esa—
Building footprints
We rep2o Bmap
wm pammelon 12009),
E::] Parcel elosParcel outlines eyin.M:(copy2gmzoos).
Rosedell Elementary School T 0cwo1sa09Gamado0eoawa0am
b 0cwrecy of V9 Oa9 ab aeumes no
IaAllry I« arty «mrs « om�svons.
Wp Wpared MCRy of Santa C1—
GIS Dms,on