HomeMy WebLinkAbout2010-08-24 - AGENDA REPORTS - WESTCREEK TESORO ANNEXATION (2)Initial Study
Master Case 10-048
AN�, 10-001, PRZZ 10-001,
GPA 10-001, SOI 07-001
Page 21 of 46
Potentially Less Than Less Than No
Significant Significant Significant Impact
impact . with Impact
Mitigation
e) Create or contribute runoff water which would I f
I I 1XI I I
exceed.the capacity of existing or planned stormwater
ide substantial- d' I
drainage systems or prov ad itiona
sources of polluted runoff?
f) Otherwise substantially degrade water quality?__
[J IXT I
g) Place housing within a I 00 -year flood hazard area as
I 1XI
mapped on a. federal Flood Hazard Boundary or Flood
Insurance Rate Map or other flood hazard delineation
map?
h) Place, within a 100 -year flood hazard area, structures
I [XI
which would impede or redirect flood flows?.
i) Expose people or.strueltures to a significant risk of
[XI 1.1
loss, injury� or death involvin' floodin-, including
9 9
flooding as a result of the failure of a levee or dam?
j) Inundation by seiche, tsunami, or mudflow?
H. 1XI
k) Changes in the rate of flow, currents, or the course
xf
and direction of 'Surface water and/or'groundwater?
i) Other modification of a wash, -channel creek or river? I I I I 1XI
1) Impact Stormwater Management in any of the [XI I
following ways:
i) Potential impact of. project construction and project 1x] I I
post -construction activity on storm water runoff?
ii) Potentialdischarges from areas for materials storage, [XI I
vehicle or. equipment fueling, vehicle or equipment
maintenance (including washing), waste handling,
hazardous materials handling or storage, delivery areas
or loading docks, or other outdoor work.areas?
21
�'5