Loading...
HomeMy WebLinkAbout2010-08-24 - AGENDA REPORTS - WESTCREEK TESORO ANNEXATION (2)Initial Study Master Case 10-048 AN�, 10-001, PRZZ 10-001, GPA 10-001, SOI 07-001 Page 21 of 46 Potentially Less Than Less Than No Significant Significant Significant Impact impact . with Impact Mitigation e) Create or contribute runoff water which would I f I I 1XI I I exceed.the capacity of existing or planned stormwater ide substantial- d' I drainage systems or prov ad itiona sources of polluted runoff? f) Otherwise substantially degrade water quality?__ [J IXT I g) Place housing within a I 00 -year flood hazard area as I 1XI mapped on a. federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map? h) Place, within a 100 -year flood hazard area, structures I [XI which would impede or redirect flood flows?. i) Expose people or.strueltures to a significant risk of [XI 1.1 loss, injury� or death involvin' floodin-, including 9 9 flooding as a result of the failure of a levee or dam? j) Inundation by seiche, tsunami, or mudflow? H. 1XI k) Changes in the rate of flow, currents, or the course xf and direction of 'Surface water and/or'groundwater? i) Other modification of a wash, -channel creek or river? I I I I 1XI 1) Impact Stormwater Management in any of the [XI I following ways: i) Potential impact of. project construction and project 1x] I I post -construction activity on storm water runoff? ii) Potentialdischarges from areas for materials storage, [XI I vehicle or. equipment fueling, vehicle or equipment maintenance (including washing), waste handling, hazardous materials handling or storage, delivery areas or loading docks, or other outdoor work.areas? 21 �'5