Loading...
HomeMy WebLinkAbout2011-08-23 - AGENDA REPORTS - BOUQUET MEDIAN B4007 (2)CONSENT CALENDAR DATE: SUBJECT: DEPARTMENT: Agenda Item: 5 CITY OF SANTA CLARITA AGENDA REPORT City Manager Approval Item to be presented by August 23, 2011 Curtis Nay BOUQUET CANYON ROAD MEDIAN IMPROVEMENTS, PROJECT B4007 - APPROVE PLANS AND SPECIFICATIONS AND AWARD CONSTRUCTION CONTRACT Public Works RECOMMENDED. ACTION City Council: 1. Approve the plans and specifications for the Bouquet Canyon Road Median Improvements, Project B4007. 2. Award the construction contract to R.C. Becker and Son, Inc., in the amount of $614,833, and authorize a contingency in the amount of $122,967, for a total contract amount not to exceed $737,800. 3. Authorize an increased expenditure in the amount of $63,000 to the existing professional services contract with Pacific Coast Land Design for landscape architect design, surveying, and engineering support services during construction. 4. Authorize an expenditure in the amount of $60,000 to Santa Clarita Water, a division of Castaic Lake Water Agency, for meter services for the irrigation system. 5. Appropriate $1,015,800 from Landscape Maintenance District Fund Balance 357 to Expenditure Account B4007357-5161.001. 6. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. I F' OVED BACKGROUND Located on Bouquet Canyon Road from Plum Canyon Road to Urbandale Avenue, this median landscape project will replace striped pavement medians and raised asphalt medians with irrigated, landscaped medians. This project, as with the City's recently completed landscaped median projects, will employ the City's successful water management technology and best management practice including plant selection. This Bouquet Canyon Road segment was chosen for two reasons: to bring the look and benefits of well-maintained medians located throughout the City to Saugus and enhance the Bouquet Canyon Road gateway into the City. This project exemplifies the City's commitment to maintaining the high quality oflife enjoyed by Santa Clarita residents. This landscape design is certified and compliant with Assembly Bill 1881, the state law regarding water efficiency. Investing in high-quality landscape projects within the public right-of-way, such as this project, helps maintain higher property values and keeps the City on water management's cutting edge. Since 2007, the City's award-winning Landscape Maintenance District efforts have reduced annual water use by nearly 149 million gallons. An invitation to bid was published three times, June 20, June 23, and June 26, 2011, and was noticed on the City's website. Plans and specifications were also sent to area plan rooms. Thirteen bids were submitted to the City and opened by Purchasing on July 20, 2011. The results of the bids are shown below: Company R.C. Becker and Son, Inc Kasa Construction, Inc. C.A. Rasmussen, Inc. Toro Enterprises, Inc. Rock Bottom, Inc. Location Santa Clarita, CA Ontario, CA Santa Clarita, CA Oxnard, CA Bakersfield, CA STL Landscape, Inc. Los Angeles, CA Environmental Construction, Inc. Woodland Hills, CA Granite Construction Company Watsonville, CA Excel Paving Company Long Beach, CA Sully -Miller Contracting Brea, CA Arc Accucon Construction, Inc. La Crescenta, CA Elite Landscape Clovis, CA G. Coast Construction Encino, CA Bid Amount $614,833.20 $638,518.00 $642,745.80 $662,270.40 $676,439.40 $681,377.00 $691,708.40 $720,949.27 $754,190.00 $858,426.00 $863,191.02 $909,611.73 $1,220,718.00 The lowest responsive bid was submitted by R.C. Becker and Son, Inc., in the amount of $614,833.20. Staff recommends that the project be awarded to R.C. Becker and Son, Inc. The contractor possesses a valid state contractor's license and is in good standing with the Contractors State License Board. The contractor's bid has been reviewed for accuracy and conformance to the contract documents and was found to be complete. Me The construction contingency amount requested will cover the cost of unforeseen site conditions, such as the removal of existing pavement and base material and suitable soil replacement for planting. Boring tests indicated wide variations in the thickness of existing materials, which could result in increased costs. The additional spending authority of $63,000 requested for Pacific Coast Land Design will provide for landscape architect design, surveying, and engineering support services during construction. The expenditure in the amount of $60,000 for Santa Clarita Water, a division of Castaic Lake Water Agency, is requested to provide meter services for the irrigation system. The remaining budget in the amount of $155,000 will be used for labor compliance services, staff oversight, water connection fees to Castaic Lake Water Agency, electric connection to Southern California Edison, quality assurance inspection, and miscellaneous project administration costs. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT The recommended action of appropriating $1,015,800 from Landscape Maintenance District Fund 357 to Expenditure Account B4007357-5161.001 will adequately provide for the anticipated cost for the Bouquet Canyon Road Median Improvements project. ATTACHMENTS Vicinity Map